Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7222 ASPHALT OVERLAY (4)C� O Oty Of Planning, Development $ Transportation ,tl g CoW Skeeb �19966 eG�6 s 825 Ninth SweetSFreet6 ' Fart Collins. CO 80522.0580 970.221.6015 970.221.8270-Tax Change Order Form PROJECT TITLE: 2011 KFCG/Slreet Maintenance Program, Asphalt Overlay Project PROJECT NUMBER: 902120 ( bid #7222) CONTRACTOR: Lafarge Northern (PO #9112463) CHANGE ORDER NUMBER: 9 1. Reason for change. 2. Description of change. 3. Change in confrad cost. 4. Change in contract time. 1. See attached document Change Order No. 9 3. The contract cost vAll Increase by $11,036.46 4. There is no change In contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % THIS CHANGE ORDER TOTAL C.O. %,OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST $3954,586.75 $469,466.16 $3,170.85 -... --- $11,036.46 0.34% 14.86% $3,738,260.22 ACCEPTED SY: - ��� DATE: 4)(.4�ontractors Representative APPROVED BY: DATE Pavement Management Manager •Sheets w Contractor Wrgne4,# __ Pm)eel file Change Order No: 7 • j Date: 1 9/13/2011 1 Reason For Change: a. SMP asked Latarge to perfrom manhole adjustments on the 2010 HIP project on S. Lemay - From Horsetooth to Riverside - and agreed to pay T & M prices as the work was not included in the onglonal contract quantities 2 Description Of Change: a. Lafarge performed a couple full adjustments of manholes <241n, also brought some up to grade by removing risers and exchanging them for others. SMP owes Equipment, Labor, and Materials at T & M pricing. 3 Change In Contract Amount: DATE Details Of Labor Hours Or Hdy.Rateorl Equipment Equipment or Materials Ouanti Unit Price cost Material Cost Labor Cost Total Amount a. 725/2011 Tandems 8.50 $72.00 $612.00 $612.00 Backhoe 4.00 $100.00 $400.00 $400.00 Leebo •Paver 1.00 $110.00 $110.00 $110.00 Small Roller 2.00 $70.00 $140.00 $140.00 Rubber Tire Roller 1.00 $75.00 $75.00 $75.00 Service Truck 1.00 $57.00 $57.00 $57.00 Transport/Small Crew 2.00 $92.00 $184.00 $184.00 Mill 4.00 $180.00 $720.00 $720.00 Asphalt/Ton 10.00 $54.00 $540.00 $540.00 Foreman /Picku 1.00 $62.00 $62.00 $62.00 Laborers 46.00 $34.00 $1,564.00 $1,564.00 TOTALS 2298.00 540.00 162&00 4464.00 7rM2011 Tandems 7.00 $72.00 $504.00 $504.00 Bobcat WBreaker 5.00 $75.00 $375.00 $375.00 Air Compressor 4.00 $65.00 $260.00 $260.00 Transport/Small Crew 2.00 $92.00 $184.00 $184.00 Asphalt/Ton 3.07 $54.00 $165.78 $165.78 Foreman /Pickup 1.00 $62.00 $62.00 $62.00 Laborers 57.00 $34.00 $1,936.00 $1938.00 TOTALS 1323.00 165.78 2000.00 3488.78 727/2011 Tandems 3.60 $72.00 $252.00 $252.00 Backhoe 1.00 $100.00 $100.00 $100.00 Small Roller 1.00 $70.00 $70.00 $70.00 Service Truck 2.00 $67.00 $114.00 $114.00 Mill 1.00 $180.00 $180.00 $180.00 As haiVron 3.07 $64.00 $165.78 $165.78 Foreman /Pickup 1.00 $62.00 $62.00 $62.00 Laborers 1 16.50 $34.00 $561.00 1 $561.00 TOTALS 716.00 165.78 623.00 1504.78 7/25111 - 7/27/11 Traffic Control 1.00 51,578.90 $1,578.90 $1,578.90 TOTALS 0.00 1578.90 0.00 1578.90 TOTAL I E11,036.46 TOTAL CHANGE IN CONTRACT AMOUNT Change In Contract Time NO CHANGE 4 a. TOTAL CHANGE IN CONTRACT TIME City of �t Collins Streets o� Planning, Development & Transportation streets 626 Nk M arrest Fen COMM. CO 805220580 970221.6616 970221.8270. fu Change Ober Form PROJECT TITLE: 2011 KFCGIStreet Maintenance Program, Asphalt Overlay Protect PROJECT NUMBER: 902120 ( Rid e7222) .. ... • _ . _.. . ` CONTRACTOR: Lafarge Northam (PO #9112463) { CHANGE ORDER NUMBER: a n preparingi change orders snow in order as separate munbereo paragraphs the following 1. Reason for change. 2. Descrlption of change. 3. Change in contract cost. 4. Change In contract time. 1. See attached document Change Order No. a 3. The contract cost will Increase by $3,170.86. , 4. There Is no change In contract 9me. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER. TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST 0.10% 14.52% $3.254,686.75 $469,466.16 $3,170.0 $3,727,223.76 • ACCEPTED BY: _. _ ....- - DATE: Cadrad0 a Representative APPROVED BY: DATE: Pavement Management Manager - Streets ¢: fbMnclm Pumtm" PMIM F1k Change Order No: a Date: 1 Reason For Change: a. b. C. 2 Description Of Change: A. b. C. 3 Change In Contract Amount: IN. It. C. 9113Q011 Needed to Change out 26in MaNmle ring and covers to 24in to get more consistantcy within our roadways and minimize maintenance issues in future Streets needed a total of four manhole risers to complete a SMP job, Lafarge supplied these materials SMP needed a 321n manhole riser to complete a SMP job for Hot -in -place, Lafarge supplied these matedals Periromed a full adjust on manholes, removing the 26in ring and cover and replacing it with a 24in. Only paid for equipment. Labor is Included In the line item for full adjust manhole. Streets used these risers on a SMP job and didn't have the resources to pedrom the work. Lafarge supplied these said materials SMP used this riser on a SMP job (Hot-InPlace) and didn't have the resources to perirom the work. Lafarge supplied these said materials Item Qty Unit Unit Cost Total Cost 210.09 Adjust Standard manhok (Equipment only 8.00 Each $292.00 $2,336.00 Adjust Manhole with Ring w/Locks <24" dia, 210.12 _< 3" height 4.00 Each $I6 .55 $642.20 Adjust Manhole with Ring w/Locks <24" dia, > 210.13 3" height 1.00 Each $192.65 $192.65 TOTAL CHANGE IN CONTRACT AMOUNT 0 Change In Contract Time No Change 4 a. TOTAL CHANGE IN CONTRACT TIME U TOTAL 1 $3,170.86