HomeMy WebLinkAboutWORK ORDER - RFP - P1107 GEOTECHNICAL TESTING SERVICE (41)�{c5L-1-7 �. C�C" EXHIBIT"A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS and CTL THOMPSON DATED: September 7, 2011 Work Order Number: 02-400903707-11 Project Title: Linden Street Project Commencement Date: July 25, 2011 Completion Date: November 1, 2011 Maximum Fee: (time and reimbursable direct costs): not to exceed $ 13,500 (quoted price plus 10% contingency) Project Description: Provide Material Testing for Linden Streetscape Project. Scope of Services: Install all items as priced on attached quote dated 7/29/2011, Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms), the Services Agreement shall control. Service Provid (� By: c,=S-t_ . �Y7 Date: 9 ._ g — I Approved By: Purchasing Agent over $60,000 The attached forms consisting of three (3) pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. City of Fort C�Ilinb — Date: 7113111 A x e: o..ft. -�-o- e w r. 1 D July 29, 2010 City of Fort Collins Engineering Department 281 N. College Avenue P.O. Box 580 Fort Collins, Colorado 80522-0580 Attention: Mr. Mark Laken, PE Project Manager Subject: Fee Estimate for Construction Observation and Materials Testing Services Linden Street — Jefferson Street to the Poudre River Fort Collins, Colorado Fee Estimate No. FC-11-0245 At your request, CTLIThompson, Inc. is pleased to provide this fee estimate for Construction Observation and Materials Testing services for the Linden Street —Jefferson Street to the Poudre River project located in Fort Collins, Colorado. We understand testing for this project should be performed in accordance with City of Fort Collins standards and specifications as well as CDOT specifications. We reviewed the plans prepared by HDR Engineering, Inc. dated April 27, 2011 in preparation of our proposal. We understand that the city will use our estimate for the basis of establishing a budget for the project and to issue a purchase order for our services. Our estimated scope of services and associated fees were prepared according to the terms and conditions of our professional services agreement with the City of Fort Collins and are presented below. Earthwork: Compaction testing may be required for roadway subgrade, sidewalk subgrade, curb and gutter subgrade, and aggregate base course. We estimate a total of 26 site visits will be necessary. Engineering Technician Standard Proctor Atterberg Limits Gradation R-Value for Aggregate Base Course 26 days x 2 hrs/day x $57/hr $2,964.00 3 tests x $83/ea $249.00 3 tests x $62/ea $186.00 3 tests x $72/ea $216.00 1 test x $332/ea $332.00 Subtotal: $3,947.00 351 Linden Street I Suite 140 1 Fort Collins, Colorado 80524 Telephone: 970-206-9455 Fax: 970-206-9441 ■ is Concrete Testing: Concrete testing will be required for the ramps, sidewalk, and curb and gutter. We estimate 20 concrete tests consisting of 5 cylinders each will be necessary. We further estimate that additional technician time may be necessary to test the percent air content on approximately two extra trucks for each day of concrete placement. In addition, CDOT Form 250 indicates that one sand equivalency test is required per day. To be conservative, we will assume one sand equivalency test will be necessary per concrete test for a total of 20 sand equivalency tests. Concrete Cylinders Additional Concrete Cylinders Sand Equivalent Time To Test Additional Trucks 20 tests x $166/test $3,320.00 20 tests x $9/test $180.00 20 tests x $73/test $1,460.00 20 hours x $52/hour $1,040.00 Subtotal: $6,000.00 Asphalt Testing: Compaction testing will be required during asphalt placement on Linden Street. We estimate the project will require 2 full days of asphalt compaction testing (one for each traffic direction) and 4 laboratory samples. We also estimate that 1 hydrated lime gradation will be required. Engineering Technician Hydrated Lime Gradation Fractured Face Determination Lab Density (Rice) AC Content/Gradation 2 days x 8 hrs/day x $57/hr $912.00 1 test x $72 /ea $72.00 4 tests x $83 /ea $332.00 4 tests x $88 /ea $352.00 4 tests x $156/ea $624.00 Subtotal: $2,292.00 TOTAL ESTIMATED FEE: $12,239.00 It should be emphasized that this estimate is for the quality control portion of the project only and is based upon assumptions of actual quantities and contractor's schedule. The fee will be charged only for the actual hours and unit rates presented for tests and observations requested by the owner, contractor or subcontractors who schedule the services. If we can be of further assistance, please contact us at your convenience. Very truly yours, CTL I THOMPSON, INC. Heather Grubb Field Department Manager CRY OF FORTCOLLINS LINDEN STREET -JEFFERSON STREET TO THE POUDRE RIVER CTL I T FEE ESTIMATE NO. FC-11.0245