HomeMy WebLinkAboutWORK ORDER - RFP - P1074 CITY ARCHITECTURAL AND ENGINEERING WORK ORDER CONTRACT (5)EXHIBIT ''A"
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
ALLER-LINGLE ARCHITECTS, P.C.
DATED: August 24, 2007
Work order Number: Al-02-20I1
Purchase order Number:
Project Title: ClubTicoRenovations- FinalPhase
Commencement Date: September 12,2011
Completion Date: November 14, 2011
Maximum Fee (time and reimbursable direct costs): $17,950.00
Project Description: Final pbesa renovation of Club Tico, which involves the renovatfou of the South end of the se0ond
floor per the ovaraH Master Plan for 0te facility, plus the addition of an exterior deck off of the second level.
Scope of Services: Complete mmhiteutural and engineering services to develop coastruction documents wilh
specifications on the drawings, per your Proposal dated November 30, 2010.
Service Provider agrees to perform
the services identified above and on
the attached forms in accordance
with the terms and conditions
contained herein and in the Services
Agreement between the parties. In
the event of a conflict between or
ambiguity in the terms of the
Services Agreement and this work
order (including the attached forms)
the Services Agreement shall
control.
SERVICE PROVIDE
By:
Date: IV//
CC: Purchasing
ACCEPTANCE Ron Kechter
USER
The attached forms consisting
of five (5 j pages are hereby
accepted and incorporated
herein by this reference, and
Notice to Proceed is hereby
given -
CITY OF RT COLLINS
Date:
September 12, 2011
Director of Purchasing and Risk Management over
$60,000.
ARCHITECTS
November 30, 2010
Mr. Ron Kechter
City of Fort Collins
Operations Services
P. 0. Box 580
Fort Collins, CO 80522.0580
RE: Proposal for ArchitecturaVEngineering Services
Club Tico Renovations
Fort Collins, Colorado
Dear Ron:
Alter -Lingle -Massey Architects P.C. is pleased to provide you with this Proposal for
architectural/engineering services for the proposed Club Tico renovations at City Park in Fort Collins. We
are happy to work with you on this project. In response to our meetings, previous design development and
construction documents to date, we propose the following scope of services and associated fees:
Project Description
Architectural and engineering design, construction document and construction administration services as
itemized below for proposed kitchen, restroom and deck upgrades of approximately 2,300 sq. ft., excluding
site improvements, to be built at City Park Center in Fort Collins, Colorado. The City of Fort Collins has
established that LEED certification will not be pursued for the project.
Services shall also include client meetings and other meetings that the City of Fort Collins may require as a
part of their review and approval process for the, project, to the extent described below.
The project will be managed for Atler•Lingle•Massey Architects P.C. by Shaun Moscrip, ALA. We propose to
provide limited A/E services, including structural, mechanical and electrical engineering. The project will
be constructed by the City of Fort Collins and volunteer labor.
Scope of Basic Services
The Scope of Basic Services shall be as follows:
Construction Documents Phase: Prepare complete construction drawings with specifications on
the drawings for competitively bidding the project to Contractors, including architectural,
structural, mechanical and electrical engineering. Extent of drawings is estimated as follows:
Demolition Plans
Floor Plans
Reflected Ceiling Plan
Interior Elevations
Wall Sections and Details
Foundation Plans, if required
Framing Plans
Plumbing Plan and Details
Mechanical Schedules and Details
Electrical Power Plan and Details
Electrical Lighting Plan and Schedules
MWHALERSWAV`• BLDG.8,SUITE100 • FORrcrILLINS • COLORADO • 80525
(970) 223-1820 phone 0 (970) 223-1833 fax 0 ofaceftllervffngle-ousaeycom • w vvaller-I(ngfe-ma55eycom
Proposal for ArchitecturaVEngineering Services - 2
Electrical Communications/Specialized Systems Plan and Schedules
Electrical One -line Diagram and Schedules
2. Meetings: Representation at the following meetings:
a. Client meetings as necessary.
b. Site progress meetings with the Contractor and Owner during construction.
3. Coordination and Project Management: Coordination with the Owner, Architect and Engineers as
necessary through the design phases.
4. Deliverables:
Review set(s) of Phase 3 Construction Documents submittal, 24" x 36"
Final set(s) of Construction Documents, released for bidding and construction, 24" x 36"
5. Construction Administration Phase: Perform field observations of the work in progress during
construction with written reports to the Owner, attend site meetings with the Contractor and
Owner's representative (Consultants on an as -needed basis), review of shop drawings and
submittals, issuance of Architect's supplemental instructions (ASIs) and responses to Contractor's
requests for information (RFIs), issuance of change orders, review of Contractors pay requests,
final punch list inspection and assistance with project closeout. For purposes of this Proposal, the
number of field visits during the Construction Administration phase shall be limited to three (3)
trips. For purposes of this Proposal, field observations by our Consultants are proposed as follows:
a. Structural Engineering: 1 site visit.
b. Mechanical Engineering: 2 site visits.
C. Electrical Engineering: 2 site visits.
6. Record Documents: Preparation of record documents upon the completion of construction of this
project.
All construction documents prepared for this project shall be generated with our in-house Computer -Aided
Design and Drafting (CAD) systems, using AutcCAD Version 2008 and/or Revit 2008 software.
Assumptions
1. Interior design services, including specifications, selection and procurement of furnishings, fabrics,
upholstery, window coverings and moveable equipment shall be provided by the Owner. These
services are available as Additional Services.
2. The project will not be designed or pursue LEED certification.
3. Document preparation and applications for building permits or other construction permit
applications shall be provided by the Owner and/or Contractor.
4. Printing and copying of bid documents, and distribution to Contractors for bidding will be provided
by the Owner; we will furnish plots or PDFs of our original drawings.
Work Not Included
1. Planning, landscape architecture and other related services for taking the project through the
Planned Unit Development or other site plan approval process with the City of Fort Collins,
including public hearings for the Planning and Zoning Commission and/or City Council.
2. Landscape architecture and lawn irrigation design and engineering. See Additional Services.
3. Electrical design and engineering for primary site electrical service, parking lot and site lighting,
and other site electrical systems.
4. Civil engineering design for on -site improvements, including street and parking lot improvements,
grading and drainage, utility extensions or oversizing, off -site conveyance of storm water runoff,
drainage reports and erosion control reports.
5. Civil engineering design for off -site improvements, including street improvements, grading and
drainage, utility extensions or oversizing, off -site conveyance of stormwater runoff, drainage
reports and erosion control reports, beyond the limits of the project site described under Project
Description above.
6. Design and preparation of construction documents for kitchen equipment hoods.
7. Design and preparation of construction documents for any exterior improvements, including
renovation or remodeling of the exterior of the building, site improvements, landscaping and
signage.
a. Fire sprinkler system design, .engineering and flow calculations. No fire sprinkler system is
proposed.
Aller•Ungle•Massey ArcMtects P.C.
Proposal for Architectural/Engineering Services - *J
9. Building Envelope Energy Calculations: The existing building envelope is assumed to be
"grandfathered" as an existing building.
10. Perspectives, renderings, models or other presentation documents. See Additional Services.
11. Site visits or field observations beyond those identified in the Scope of Basic Services,
12. Project or building inspection services as required by Chapter 17 of the International Building code
(IBC), current edition.
13. Revising final construction drawings for building permit or construction purposes to incorporate
addenda items.
Owner -Provided Information
1. Asbestos or other hazardous material discovery, testing and abatement.
2. Design standards or guidelines for the City of Fort Collins, if applicable.
3. Copies of all applicable standard documents, forms, specifications or other information from the
City of Fort Collins to be a part of the bidding documents.
4. Copies of all standard specifications for materials, equipment and fixtures to be incorporated into
the project design used by the City of Fort Collins, including material cut sheets and sources for
sales and technical representatives, if available.
S. Coordination with telephone, electric, natural gas, propane or other independent utility and/or
building services providers for infrastructure and equipment installation.
6. Copies of final construction documents sets for Alter -Lingle- Massey Architects P.C. and each of
our subconsultants.
7. Owner shall provide, or contract separately for, project or building inspections required by Chapter
17 of the IBC. These services are expressly excluded from this Proposal.
Consultants
Alter- Lingle -Massey Architects P.C. proposes the following consultants for this project:
Structural Engineering
Weeks and Associates, Inc.
Gary Weeks, P.E.
4700 S. College Avenue, Suite 1
Fort Collins, CO 80525
(970) 225.2422
Electrical Engineering
ESC engineering, Inc.
Kate Hodgson
3540 JFK Parkway
Fort Collins, CO 80525
(970) 224-9100
Mechanical Engineering
Abrahamson Engineering, Inc.
Roger Abrahamson, P.E.
3101 Kintzley Court, Unit 0
LaPorte, CO 80535
(970) 221-2569
Fees
Alter -Lingle -Massey Architects P.C. and our team of Consultants propose to complete the project through
the Construction Administration phase for estimated design fees based on an hourly not -to -exceed fee of
$17,700.D0, excluding reimbursable expenses.
A breakdown of this fee by design discipline Is as follows:
Architectural:
$ 6,750.00
Structural Engineering:
$ 950.00
Mechanical Engineering:
$ 5,300.00
Electrical Engineering:
$ 4,700.00
Reimbursable Expenses:
S 250.00
TOTAL:
$17,950.00
Alter-Ungle•Massey Architects P.C.
Proposal for ArchitecturaUEngineering Services - 4
Reimbursable Expenses
In addition to Basic Services, the following expenses in connection with this project shall be reimbursable
at 1.1 x direct cost:
1. Printing/scanning
2. Copying
3. Long distance telephone/FAX
4. Mileage and travel expenses
5. Postage
6. Federal Express/Express Mail and other delivery services
7. Photography or other miscellaneous expenses
B. Plotting of CAD -generated drawings
For purposes of this Proposal, Reimbursable Expenses are estimated not to exceed $250.00, which does not
include printing and copying for bid/construction sets.
Additional Services
If the Owner requests additional services beyond those set forth in this Proposal, or for additional services
as described elsewhere in this Proposal, such services shall be agreed to in writing between the Owner and
the Architect and the fees adjusted accordingly per the following current hourly rates, subject to annual
adjustment:
Aller•Lingle•Massey Architects P.C.
Consulting:
$135/hour
Principal:
$130/hour
Associate Architect:
$100/hour
Sr. Project Manager/Architect:
$95/hour
Project Architect:
$88/hour
LEED AP Consulting:
$85/hour
Interior Designer:
$75/hour
Architecturallntern/CAD Technician 2:
$70/hour
Architecturallntern/CAD Technician 1:
$60/hour
Clercat/Administrative:
$50/hour
Weeks and Associates Inc.
Principal Engineer:
$100/hour
Staff Engineer:
$70-80/hour
Administrative Staff:
$35/1hour
Abrahamson Engineering Inc.
Principal:
$100/hour
Professional Engineer:
$85/hour
Engineer/Senior Designer:
$75/hour
Draftsperson:
$48/hour
Clerical:
$48/hour
ESC Engineering Inc.
Principal Engineer:
$94/hour
Project Manager:
$92/hour
Project Engineer:
$88/hour
Senior Electrical Designer:
$72/hour
Designer 1:
$64/hour
CAD Technician I:
$60/hour
Secretarial:
$36/hour
For purposes of this Proposal the following will be considered Additional Services:
1. Development of multiple bid packages, or otherwise staggering the release of documents to
Contractors.
Aller•Ungle•Massey ArcMtects P.C.
Proposal for Architectural/Engineering Services - 5
2. Fast -tracked construction schedules, or other acceleration of the construction schedule requiring
the release of construction documents to Contractors prior to the completion of all documents.
3. Redesign that may be required by City review, if review comments or requirements are different
than those received at the Conceptual Review meeting, and/or neighborhood opposition of this
project.
Schedule
Scope of Basic Services for this project will be performed in accordance with the following schedule,
assuming return of the signed Proposal and notice to proceed from the Owner by December 10, 2010.
1. Construction Documents Phase: Complete by approximately February 4, 2011.
2. Bidding/Negotiation Phase: As required by the proposed bidding/construction schedule.
3. Construction Administration Phase: As required by the proposed bidding/construction schedule.
Budget
ALLer•Lingle•Massey Architects P.C. understands that a budget of approximately $288,000 has been
established for this project, including design and engineering fees and all City of Fort Collins building
permit and development fees.
Standard Contract Terms and Conditions
All terms of this Proposal shall be to accordance with our 2007 master contract with the City of Fort Collins.
Alter -Lingle -Massey Architects P.C. is dedicated to providing quality professional service and creative
design solutions. We look forward to the opportunity of working with you on the Club Tico renovation.
Give us a call if you have any questions concerning this Proposal. If acceptable to you, please provide the
appropriate City of Fort Collins work order, upon which we will schedule our work to begin.
This Proposal is valid for a period of 60 days. Thank you for your interest and consideration
Sincerely,
ALLER•LINGLE•MASSEY ARCHITECTS P.C.
Shaun J. Moscrip, AIA
SJM:IIs
Alter-Lingle•Massey Archftects P.C.