HomeMy WebLinkAbout492167 TETRA TECH CONSTRUCTION SERVICES INC - PURCHASE ORDER - 9115207PURCHASE ORDER PO Number Page
City of , of 2
Fort Collins Thls9 number must appear
alfinvoices,dllpacking
slips and labels.
Date: 09/08/2011
Vendor: 492167 Ship To: ENGINEERING DEPT-MASON
TETRA TECH CONSTRUCTION SERVICES INC CITY OF FORT COLLINS
5401 E 48TH AVE ENGINEERING DEPT-MASON_
ENVER Colorado 80216
281 N. COLLEGE AVE
FORT COLLINS Colorado 80524
Delivery Date: 09/07/2011 Buyer: JOHN STEPHEN
Note:
Line Description Quantity UOM Unit Price Extended
Ordered Price
I Downtown Conduit Work 1 LOT .LS 796,303.40
Mason SB1 Downtown
PER TERMS AND CONDITIONS OF BID 7263 AND
AGREEMENT DATED SEPTEMBER 19, 2011
City of Fort Collins Director of Purchasing and Risk Management
This order Is not valid over $5000 unless signed by James B. O'Neill II, CPPO
City of Fort Collins Purchasing, PO BOX 580, Fort Collins, CO 80522-0580
Phone:970-221-6775 Fax:970-221-6707 Email:purchasing@fcgov.com
Total $796,303.40
Invoice Address:
City of Fort Collins
Accounting Department
PO Box 580
Fort Collins, CO 80522-0580
time.
50) Piggybacking
NO
1) The file contains: Assignability
provisions.
2) The procurement file contains: Price
reasonableness determination.
56) Clauses
YES Check list of clauses made
This contract contains the appropriate
and correct clauses included with
FTA required clauses.
bid solicitation and will be
included with contract.
Page 1 of 1
John Stephen
From: Erika Keeton
Sent: Thursday, August 18, 2011 5:43 PM
To: John Stephen
Cc: Terry Tyrrell; Tracy Dyer; Michael Lopez; Ward Stanford; Britney Sorensen; Janet Mctague;
Eric Dahlgren; Jim O'Neill; Kryste Korf-Bartsch; Kurt Ravenschlag; Helen Migchelbrink
Subject: 7263 Recommend Award
Attachments: Bid Comparison.pdf; Buy American Compliance.pdf; Response to Questions related to Bid
7263.pdf; Tetra Tech Schedule.pdf; Tetratech Reference Check 8-18-11.pdf
John, please find attached the bid comparison for Bid No. 7263 Downtown Conduit Backbone and Laterals. I
have reviewed the bids for accuracy, and Tetra Tech is the apparent low bidder. The bid prices are reasonable and
I recommend award to Tetra Tech Construction Services, Inc.
Also attached are the results of my conversations with various references, correspondence with Tetra Tech,
proposed schedule, and.the revised Buy America statement.
Please let me know if you need any other information. I am expecting a stamped set of final plans from the
consultant next week.
Thanks, Erika
Erika Keeton, P.E.
Special Projects Engineer
City of Fort Collins Engineering Department
o. 970.221.6521
c. 970.222.0787
ekeeton@fcgov.00m
9/7/2011
From: Vaughn, Katie
To: Erika Keeton;
CC:
Subject: RE: Questions related to Bid 7263
Date: Monday, August 15, 2011 11:20:31 AM
Attachments:
Sorry this took so long, see below for answers to your specific questions. Let me
know if you have any additional questions/concerns. We look forward to working
with you to the successful completion of this project.
From: Erika Keeton [mailto:EKEETON@fcgov.com]
Sent: Thursday, August 11, 2011 8:19 AM
To: Vaughn, Katie
Subject: RE: Questions related to Bid 7263
Thanks Katie — as soon as you can as I can't recommend award until I have
the information. Could you send the references sooner? I can be working on
that while you assemble the other items.
From: Vaughn, Katie[mailto:Katie.Vaughn@tetratech.com]
Sent: Thursday, August 11, 2011 7:42 AM
To: Erika Keeton
Subject: RE: Questions related to Bid 7263
1 received your email from out Project Manager Scott. I will go over all the
questions and should be able to get you everything you need by Monday. Is that
timeframe alright? Thanks!
From: Delaroy, Scott
Sent: Wednesday, August 10, 2011 5:05 PM
To: Vaughn, Katie
Subject: FW: Questions related to Bid 7263
Help..... I think you may be in a better position to help out the city with their
questions.
Scott Deraroy
Senior Project Manager
Tetra Tech Construction Services Inc.
DIA Field Office
26775 E. 72nd Ave
Denver, Co. 80249
Direct: 303.342.6789
Cell: 303.901.9761
Fax: 303.342.6796
Email: scott.delaroy a,tetratech.com
www.tetratech.com
From: Erika Keeton (mailto:EKEETON@fcgov.com]
Sent: Wednesday, August 10, 2011 4:49 PM
To: Delaroy, Scott
Subject: Questions related to Bid 7263
Scott, I left you a voice mail too — I have a few questions related to your
bid. Thought it might be helpful if you had these in advance before we
talk. Please give me a call or respond to this email. If you are not the right
person, please forward this along. Understand that this is a small part of a
much larger ($82 million) project, so I'm trying to make sure we have all
our ducks in a row. Thanks for your help, and I look forward to working
with you. Erika
1. Please provide names and phone numbers of references for recent
comparable work. CDOT project listed is several years old. No dates
were provided on other projects.
City of Greeley — Traffic Signal Maintenance Project — Ongoing —
Mike Comstock (970) 539-6211
CDOT-170 ITS Installation — Close Out Phase —Mat Flores (303) 807-7475
City of Centennial — Solar School Beacons — Close out Phase — Craig
Faessler (720) 570-6154
SEMA Construction — Pecos Street Bridge ARRA Funded — Ongoing — Bill
Harris (720) 284-7860
2. What obligations/contracts do you currently have?
Current Construction:
Zayo Bandwidth — Start Up — Fiber Optic Division
SEMA Construction —Ongoing —Traffic Division
CDOT— Close Out —Traffic Division
City of Centennial — Close Out —Traffic Division
DIA Runway Lighting — Ongoing — Electrical Division
3. Both the compliance and non-compliance Buy America statements are
signed. Which should be applied?
Compliance
4. Please describe specifically what work is being performed by Tetra
Tech staff on this project.
Trenching, Setting Vaults, Setting Pull Boxes, Dig & Flow Fill Bore
Pits, Supply Material, Project Management
5. What percentage of the work is going to be performed per
subcontractor? By Tetra Tech staff? Please provide a detailed cost
breakdown that totals 100% of the project.
Northern Colorado Traffic Control (DBE) — $31,250 3.92%
SSD (Sure Shot Drilling) — $36,000 Potholing 4.52% & $175,810 Boring
22.07%
A to Z Cable — Civil Work - $165,659.00 20.80%
Communication Design Engineering— plan & profile boring - $11,600.00 1.46%
Tetra Tech - $375,984.40 47.22%
6. What is Tetra Tech's experience providing federal paperwork, Davis
Bacon wages, etc?
We are currently working on 3 projects that are Davis Bacon and we
have current ARRA funded and RUS projects in our other divisions
7. The Schedule of Subcontractors lists "Engineering" performed by
Communication Design Group? What is the scope of this work?
Plan & Profile for the boring
8. Who will be on site daily during the project and what is their
experience?
Adan Huerta — 15 years experience in the fiber/directional boring/traffic/
electrical industry
9. What experience does the crew/SSD/PM have working in an urban
environment?
Rebuild for Xcel energy via directional boring, right-of-ways, rear &
front lot easements
10. Please describe your understanding of the surface restoration required
for this project.
Area disturbed by construction will be restored to original state if not
better.
11. Are you familiar with the Larimer County Urban Area Street
Standards as they pertain to surface restoration, potholing, and traffic
control? Yes, we understand the project specs.
12. Please explain how you have accounted for the surface restoration
costs in the various bid items.
We based our restoration qty/costs on previous experience in similar
projects and review of the project prior to bidding
13. Does Tetra Tech have a local crew/facility/staging area? Yes
14. Tetra Tech is $160,000+ below the next lowest bidders. Are you
comfortable that the project can be completed for this bid amount?
Absolutely
15. Do you foresee any potential change order items not covered by the
contract documents?
Not at this time, as construction progresses this could change
16. Please provide an anticipated schedule (days per intersection or other
logical sequence) to show how the work will be completed in the
given time frame and by October 31.
Progress schedule will be given at precon
Erika Keeton, P.E.
Special Projects Engineer
City of Fort Collins Engineering Department
o 970.221.6521
c. 970.222.0787
ekeetonC�fcaov. corn
Reference Check: Tetra Tech, Bid No. 7263 Downtown
Conduit Backbone and Laterals
CDOT
Dave Judy, ITS Project Manager
425 C Corporate Circle
Golden, CO 80401
303-880-0784
Performed comparable work but on the highway, in a rural setting in 2008-2009.
Contractor provided sufficient manpower and equipment for the job. Total project
cost was $5,300,000, and was complete under or at budget, and on time. Some
change orders were necessary. Contractor was cooperative. No federal paperwork
was required, but general paperwork was completed in a timely manner. The same
project manager was on the job for the duration, Scott Delaroy. No liquidated
damages. Restoration was required - seeding, and patching. One year later
manholes had settled and Contractor returned to adjust and replaced asphalt.
Stated he would hire this contractor again. ERK 8-10-11
Utah Telecommunications Open Infrastructure Agency (UPTOPIA)
Kirk Sudweeks
2175 S Redwood Road
West Valley City, Utah 84120
801-990-5450
503-620-8202 ext8840
Performed comparable underground and above ground utility work from 2004
through 2008. Contractor provided sufficient manpower and equipment for the
job. Contracts ranged in the several million dollar range, and were complete under
or at budget, on time with no liquidated damages.
Kirk did note that they were low bid but felt Tetra Tech "Nickel and Dimed "
them on the change orders. No Federal monies involved except RUS loans. Kirk
only worked with them from 2006-2008 but the Contractor kept the staff
consistent. No warranty work needed. The contractor had bid on work since but
has not won any. He would hire them again. ML 8-17-11
City of Greeley — Traffic Signal Maintenance Project
Mike Comstock 970-539-6211
Not comparable work. The Contractor performed on call sign erection work. The
Current ongoing contract has set price schedule of $5000 maximum per call out.
No change orders, or Federal money. He has no problems with their work.
ML 8-16-11
CDOT I70 Installation
Matt Flores 303-807-7475
Tetra Tech performed over $1 M of conduit installation work and ITS equipment,
radar detectors in Summit County in 2010-2011. In ground work and quality of
work was excellent. Main operator for trenching was exceptional — saved the
company $10k or 15k due to experience in the industry. Contractor did provide
sufficient manpower and equipment for the job. Project was a little over on time
due to location of project site in the mountains, which is common for this area.
Contractor commuted to and from Denver each day. Project was on budget.
CDOT did add extra work, 9-10 additional traffic cameras, and negotiated a
change order. Matt did not enjoy working with Scott Delaroy, as it took a long
time to negotiate the change order for new work and Matt felt the prices could
have been much more reasonable. Matt requested that Scott be replaced as the
project manager on the project and this request was accommodated. No payrolls
or other federal paperwork was required for this project. Other typical submittals
and paper work were fine. Office people were pretty good, Katie Vaughn is a
good quality office person, and provided good communication. No surface
restoration required. No liquidated damages. Matt would hire this contractor
again. ERK 8-16-11
City of Centennial — Solar School Beacons
Craig Faessler 720-570-6154
Tetra Tech performed installation of 17 solar school zone beacons in June through
August of 2011. They had sufficient manpower and equipment on site to complete
the project, finished the work on time, within budget and with no liquidated
damages. There were no change orders. The project was a Davis Bacon job.
Craig's Junior Engineers ran the project and he could not recall the Tetra Tech
Project Manager. The project was recently completed and still under warranty
period but there hasn't been any problems. Craig did note that during construction
there was problem with the wiring of beacons but Tetra Tech responded quickly
fixing the issue. They would hire this contractor again. ML 8-17-11
SEMA Construction — Pecos Street Bridge ARRA
Bill Harris720-395-7860
Did not return calls 8-16-11 and 8-17-11
CUSTnucTlaNReglOnal Publications AFFIDAVIT
INVOICE # A316313 01
ACCOUNT # A30027004
INVOICE DATE 07/27/11
INQUIRIES TO:
TEL 800-648-3045 FAX 609-426-7143
ADVERTISER/AGENCY:
BILL TO: CITY OF FORT.COLLINS
BETH DIVEN
P 0 BOX 580
FORT COLLINS CO 80522
The McGraw-Hill companies
PUBLICATION: DENVER DAILY JOURNAL
STATE OF COLORADO
COUNTY OF DENVER
I, DOTTY MONTANTI, OF THE CITY AND COUNTY OF MERCER, STATE OF NEW JERSEY,
HAVING DULY BEEN SWORN, DEPOSES AND SAYS:
I AM NOW AND AT ALL TIME HEREINAFTER MENTIONED A CITIZEN OF THE UNITED STATES
OF AMERICA, OVER TWENTY-ONE YEARS OF AGE, AND COMPETENT TO BE A WITNESS ON THE
HEARING OF THE MATTERS MENTIONED IN THE ANNEXED PRINTED COPY NOTICE HEREINAFTER
SET FORTH; I HAVE NO INTEREST WHATSOEVER IN ANY OF THE SAID MATTERS; I AM NOW
AND DURING ALL TIMES EMBRACED IN THE PUBLICATION HEREIN MENTIONED WAS THE
CHIEF CLERK OF THE NEWSPAPER, A NEWSPAPER OF GENERAL CIRCULATION PRINTED AND
PUBLISHED IN SAID CITY AND COUNTY; AS CHIEF CLERK DURING ALL TIME MENTIONED
IN THE AFFIDAVIT I HAVE HAD AND I STILL HAVE CHARGE OF ALL ADVERTISEMENTS AND
NOTICES PUBLISHED IN SAID NEWSPAPER; THAT SAID LEGAL NOTICE OF WHICH THE
ANNEXED IS A TRUE PRODUCTION COPY OF THE PRINTED PAGE IN WHICH THE ADVERTISEMENT
WAS PUBLISHED IN THE ABOVE NAMED NEWSPAPER ON THE FOLLOWING DAYS TO WIT:
DOWNTOWN CONDUIT BACKBON - 07/22/11 07/25/11
I CERTIFY (OR DECLARE) UNDER PENALTY OF PERJURY THAT THE FOREGOING IS TRUE AND
CORRECT.
SIGNED,
CHIEF CLERK
AF233B
• Get YWI bidding into FASTERI Call 8868373459
MorMay, July 25. 2011 1)3zllca, Jruunx^a, 11
is ,n, nwnenr no. en n--s r•.a
p-II.,�1 CONSTRUCTION MANAOEMEBT/GENERAL
CONTRACTOR
fUTE OF COLORADO
UNIVERSRT OF NORTHERN COLORADO
NOTICE NUMBER: UNCRFP-II4001
Prole[t No. gOate,
Pmjm-ode: Butler Hancock Ea eeim Clean Wall
Pard lit"Cmnenl
Boosted
(:tin rv[Ilon LastF9W,BOo
•AFRA FUNDING? : NO
SNYemen4 If reJmlrcd, well be a&e "at Uravermnlc .,it..
Frouracced in Iva, has been remwaled
a tthough IM1e pail 31 years 'he
on-amm, pom .].ransoms, locker moms,
and ap-ampus "re, .up
rls and large grevent for hnl
1Te on, ina, weathering arel'COB TEN' meal panels on if
t
bap r Portion mine gym rile. have been dmelloadng fc
yass. and haec
cu a r,sars m eFlan, In the pmrexs I
edscu—nooftbepama,i ,Col afore unbenit, 1.
• Impmsre Ne wathering pe.fommnam(IM1is system and
anchor future dealer ...... n .,Fri.,, and air an0lmrcen
• Increase Ne insulation mrfnromera of foh,ordnn adshe
buildingwith the use of msuland metal panels.
• Candder a more refined visual apperme-C thaunnns the
overall Junk of the surks,, hm mmPlememx the ors rnI
..].]Hens I. Ne noun side of me building
Sink Combs Dethlefs will p,m'.d, amh ncian l se es for It
ormrse Shk Cartons Dem eh will rediscount with Mardodar,
A col mpY of rfte Faces, (hati,c F Is a
I the RFP A Guaranteed Maamnm Pere Ira.?)
at the comakads, of Drops Devempmmr phase.
roam I. all mteresud Paine, that all firm: wan he
III mminmer qualmarla ve,, be unirdead for
be considered as yun6fird, increased firea shall
For
Mann a JCeneal Commerce, ale
e. (33)) Y®n s a least ram (1) Pmhras Faith in
LLUll (hard FiaW in lo.oR In, allmtne Pmenl In
Rfe and
:J specific Construction Monaga ens/General
m Deiem mfwmtfar scrousnd mmpl 1w, and
d bonding apa cloy up to f 2Jku 000 for an
nddsomfy won m and s icipmed
P1
laep1
Inter bet aurerymvlvmmis houndiday
obtain
me rrea omnememr.m tMaln me
m[
l,.mebrm ans
gemeal Consarunlmn Servlcea
639
hand
p)35L13B3
be upern in Comrade reddens bidders and for
as Prmided by law.
./I'/" at 1: W PM
Usher", of Nmrmvn Colorado
Fad110a Managemar4
am ye k sen BeMvea
,or CO0
era N D eo63r
lkan: No. µnonvd
d c,l,m1r Mil be re
Late, am. is rhll be tensed without
Thee no r, or Norman or oado and me Mae
rrvyonpb111tY for cords, Mated 10 Line
Nate Rnlnbaed
UNC
970,351-23e3
te Nareashardroo-o.edu
'..]able on on web at
O DENVER INTERNANONAL AIRPORT
REQUEST FOR PROPOSALS
INSIDE / OUTSIDE PLANT
CONTRACT NO. 201101111
Oenvec Col do July ]5. ]Oil
The Denanm emuff, .....a, Denver Iratemaruanl Abnpv
Rn. MnnitorinR and Maintenance xe The
FP a twofold. Pon One of Ise Stone serves me
or multiple Freedom with eligible'on
i contract C
IA has me abinem anage, ptom.e and
plemenm0nn of'Food and worde- pbmt soprvs
duped try uthui) on a tl mrly 113111 w1111 a 2Bw.
If national for No One only Pan Two of the
for
,ropotala Uoe' I§apmals in response Rude µFP will be due
no Inter Ihim '1'.00 PM, LOCAL TIME AUGUST 16, 1011 and
s be submined to Nathan Inner, Ter aril Semen Office,
Room islo, Denver Imerants ... I Airport, B5001'ma tlled,
Denver CO 60249.
p.e Prupaaal Conferenec A Ile-I'rupnssl Conference-11 be
you,al der [ AM. LOGFTIME IA Saudi 4, r In the 01 F.
wide laibv Iooaled wi Drove,
me CIA SPUN Campus at 2I301 F.
Minority
Business
es pEnte CO 801a9.
Mlmtlty BMBEI a Enterprise and Women Business
mayI
,do Comeat (MBE/WBE) Pammus, tr d: Prufes...Far design
antl arty and n nvic contra Is male and eto All II hY
iM1e City and Cuunly o! Denver a the Y e, iclelll,
Namim,m 1 and M1 of .M.C.)r ]B of iM1e Denver Revised
Munir...v CDJe, ea nt Basin. and all ts, LhilY Business
[ p J ' P Concepts, 11 l n and
EqualEmployment Opportunity si J Repulsions
adopted hY the D f M1 Divis ! 5 II Business
nap ry(Dsno)
ern t, ul D ... 1 e5 ofChapter2e ran D.tm.(1
I the Dlmner of the Division of Small Huslness
Dapm tonesg addcaparedgoalfore ork...tr an
p. teas pal design and naenver se work.tn turned
by, acry one r,.umy of Denver ... orood etas fee
One only of his 0mle.l Is ]B% prise (y Businm Ellerpdr
protect and Women BnanaFa Enterprise (N'PE).
n protect
emen 29 65. DR. MC. o Nmvgh ed the demnmlatinnts Is set f D(a
suffiGenl good falter effort under Section 2t-6'1DR M C For
reph( with goodfaitheffort segment under Section
d1] chit(y)ea it,, ar Mtl'.e red IWtFril the rote.... of 100^,fi
I the ronlvnrt a in l smpd of work
The Director of the Division f Small Business opportunity
urges all participants In ON, prefiemonal Jura and mmnposam
-Iscon. pmjms to merit'. udnerlaµ dose gnah
Ise hmdmm area Join 11. 16 a n, ImI .o[Dj
Invitation for Bid
Bids will he received by me Ciry of Fon Collins of Fee office
of the Purchasing Division, 215 North Mason end Floor.
Fun Culllns, Women until 3:00 I'.M. our dud on Ai,ua
B, 2011 forme Dmxnnevn Ckenha l Backhone and laleals,
Bid Number 7263.
'lire War, anduds, excavation, i analln ion, backnll, not
m.Ind and arms Is rcamnnion of a mvllipl. mndual dual
hank in downtown Fon Cullim related to the carol
nimeresm.
of Mason StreM e1 and me MAX Buy Ral Transit
P.oleaFederal requirements and Davi,even wages apply
wmnlr.poll be eby 11-1 nit, 1110. Tni, cu
Formally Poohmproles with a ❑DIIF, requirement of ad a
For information call ( .say farm cos or download a
copy of Bid Number 7363 at www.f[grn [tom/purchasing.
Zama B. O'Neill IF (TPO, FNICP
Director of (Iurdmajng 9 Risk Management
tiny 1B ]ell
yerinms, Darn Jury 21 IF as, lob tin oe
q0,µr�, STATE OF COLORADO
1,,y' OFFICE OF THE STATE ARCHITECT
vim'
STATE BUILDINGS PROGRAMS
NOTICE OF CONTRACTOR'S SETTLEMENT
Institution/Agenrycohnery and Vneans Affairs
Noll ee Num her: I'0369
Project Nn/Fl de. P036B Building at lO Remodel and For
Suppression
Nmice is he¢by FIvan chat For Amebae 11, yell at 6... S.
on nt of the Contract for IM1e construction 01
IECT as Mmmend above
Any pstion,
pmpanmennlp.a coma. ah
has tin! the furnto ishingnst the ofalaboratm project.
cam but
sustenance ponyourns, pru enJea rental machinery, tool'.
equipment andothersupplies used or consumed b
such Contractor or any of his submnnaftors In or after
the perform of said work, may at any timeup to an
mdrmten avidhen¢ofnt localsettlement,file nountI
statement of me amount due and unpaid on .aeons .
]. All such claims shall be filed with the Authority
College Intention Department or Agenry
3- Fadmenn the Pan ofo creditor it) file%in Innocent
as such final ammmlent will relieve me Sum of (solo(
from any and all Lability far .in ].ins
AUNoresed Cadillac Manager or AUNotlzed Individual
Name. Inner, lone.
Approval Date'. 07/21/2011
Agenry'. Department ofa,finsry
Find VNeana Affairs
Phone (720) 750-1541
Fu: (]20)Inp, 5a9
Carol Ianid-uhroamermaaem 1.a
frimbrance froos]my 15 A A.,, 1,"" 13
PRNOWOW
Invitation for Bid
Sealed Bads will be accepted by the City of Aur ra painful
Depart umdl Aom�u Ill:00 nor fit, Hampden
Aven tie as + a if SuCon, Removal, project 11167A
General Gunrooms have beenprequalified for this p mica
Jawing. and \pefilirlainna are awtilahle for f]5. ind (t'.11
formal only) in the Purchasing Department at 15151 Fast
Alameda parkxay, Sol,, 4400, 103-]39-Cop . For additional
Informbon please go to oweveroweasedion and select Rocky
Mounain 6Punhase's,em.,
Ivnlintion Dam: July lR zm i Ia1 RO
D D NOTICE OF
n FINAL SETTLEMENT
In n[roult— with p la uium Contained in 38-26.1117,
C.P S. 1973, the Regional Tanspnrtnti or Diduat hm
esmhInhed AURust Mr 2011,as the date of Final
Settlement with Tower One Construction, for the
protect known as the flour Drivers End Addition Jo
learned finger Cuntan NumSec 30FD001.
life maiml wins drys nrl ,up,....... saraY.
Scia ly, and Van "Ill" "lartmenL Negn'nal
Tmnapnnat inn Dlsrrir1.I a00 Blake Alter.. C....
Colorado 80,02,
Steve Butcher (:use (gnlrol Sup wise r.
Safety, Se tin,, and Facilities Department
Tariff l[alino Danes: July 25 ® Augurs 3, 2011 13EV5
Advertise in
The Daily Journal Call: 888-814-0513
FOR CONSTRUCTION NOTICES, CALL: 888-814-0513
Purchase Ordcf Terms and Conditions
Page 2 of 2
1. COMMERCIAL DETAILS.
Tax exemptions. By stature the City of Fort Collins is exempt from state and local taxes. Our Exemption Number is
11. NONWATVER.
98-04502. Federal Excise Tax Exemption Certificate of Registry 84-6000587 is registered with the Collector of
Failure of the Purchaser to insist upon strict performance of the tears and conditions havo( failure or delay to
Internal Rcvermc, Deaver, Colorado (Ref. Colorado Revised Statures 1973. Chapter 39-26, 114 (a).
exercise any rights or remedies provided herein or by law, failure to promptly notify the Seller in the event of a
breach, the acceptance of or payment fro goods hereunder or approval of the design, shall nor release the Seller of
Goods Rejected. GOODS REJECTED due to failure to men specifications, either %ben shipped or due to defects of
any of the warranties or obligations of this purchase order and shall nor be deemed a waiver of any right of the
damage in transit, may be resumed to you fro credit and are nor to be replaced except upon receipt of written
purchaser to insist upon strict performance hffeofor any of its rights or remedies as to any such goods, regardless
instructions from the City of Fort Collins.
of when shipped, received or accepted, as to any Prot or subsequent default hereunder, not shall any purported
oral modification or rescission of this purchase order by the Purchaser operate as a waiver of any of the terms
Inspection. GOODS are subject to the City of Fort Collins inspection on arrival.
hereof.
Final Acceptance. Receipt of the merchandise, services m equipment in response to this order can result in
12. ASSIGNMENT OF ANTITRUST CLAIMS.
authorized payment on the pan of the City of Fort Collins. However, it is to be understood that FINAL
Seller and the Purchaser recognize that in actual economic practice, overcharges resulting from antitrust
ACCEPTANCE is dependent upon completion of all applicable required inspection procedures.
violations are in fan bore by the Purchaser. Theretofore, for good cause and as consideration for executing this
purchase order, the Seller hereby assigns to the Purchaser any and all claims it may now have or hereafter
Freight Terms. Shipments must be F.O.B., City of Fort Collins, 700 Woad St., Fort Collins, CO 80522, unless
acquired under federal or state antitrust laws for such overcharges relating to the particular goods m services
otherwise specified on this order. If permission is given to prepay freight and charge separately, the original freight
purchased or acquired by the Purchaser pursuant to this purchase order.
bill must accompany invoice. Additional charges fro packing will no be accepted.
13. PURCHASERS PERFORMANCE OF SELLERS OBLIGATIONS.
Shipment Distance. Where manufacturers have distributing points in various parts of the country, shipment is
If the Puna. directs the Seller to correct nonconforming or defective goods by a date to be agreed upon by the
expected from the nearest distribution point to destination. and excess freight will be deducted from Invoice when
Purchaser and the Seller, and the Seller thereafter indicates its inability or unwillingness to comply, the Purchaser
shipments are made from greater distance. .. _ _ _ _
may cause the work to be pMormed bythe most expeditious mains available to it, and the Seller shall pay all
costs associated with such work.
Permits. Seller shall procure at sellers sole cast all necessary permits, certificates and licenses required by all
applicable laws, regulations, ordinances and roles of the state, municipality, territory or political subdivision where
the work is performed, or required by any other duly constituted public authority having jurisdiction over the work
of vendor. Sella further agrees to hold the City of Fart Collins harmless from end against all liability and loss
incurred by them by reason of an asserted or established violation of any such laws, regulations, ordinances, rules
and requirements.
Authorization. All parties to this contract agree that the representatives am, in fan, bona fide and possess full and
complete authority to bind said parin.
LIMITATION OF TERMS. This Purchase Order expressly limits acceptance to the terms and conditions stated
herein act forth and any supplementary or additional terms and conditions annexed hereto or incorporated herein by
reference. Any additional m different terms and conditions proposed by seller are objected to and hereby rejected.
2. DELIVERY.
PLEASE ADVISE PURCHASING AGENT immediately if you cannot make complete shipment to arrive on your
promised delivery date as noted. Time is of the essence. Delivery and performance must be effected within the time
stated on the purchase order and the docmneats attached hereto. No acts of the Purchasers including, without
limitation, acceptance of partial late deliveries, shall operate as a waiver of this provision. In the event of any delay,
the Puichasm shall have, in addition to other legal and equitable remedies, the option of placing this order elsewhere
and holding the Seller liable for damages. However, the Seller shall not be liable fro damages as a result of delays
due to causes not reasonably foreseeable which are beyond its reasonable central and without its fault of negligence,
such acts of God, sees of civil or military srthorities, governmental priorities, fires, strikes, flood, epidemics, wars or
riots provided that notice of the conditions causing such delay is given to the Purchasff within five (5) days of the
time when the Sella first received knowledge thereof In the event of any such delay, the date of delivery shall be
extended for the period equal to the time actually lost by reason of the delay.
3. WARRANTY.
The Seller warrants that all goods, articles, materials and work covered by this order will conform with applicable
drawings, specifications, samples and/or other descriptions given, will be fit fro the purposes intended and
performed with the highest degree of care and competence in accordance with accepted standards fro work of a
similar nahtte. The Sella agrees to hold the purchaser harmless from any loss, damage or expense which the
Purchaser may suffn at inar on account of the Sellers breach of warranty. The Seller shall replace, repair or make
good, without cost to the purchasa, any defects or faults arising within one (1) year err within such long" period of
time as may be prescribed by law or by the terms of any applicable warmly provided by the Sella after the date of
acceptance of the goods famished hereunder (acceptance not to be unreasonably delayed), resulting from imperfect
or defective work done or materials famished by the Seller. Acceptance or use of goods by the Purchaser shall not
constitute a waiva of any claim under this warranty. Except as otherwise provided in this purchase order, the Sellars
liability hereunder shall extend to all damages proximately caused by the breach of any of the foregoing warranties
or guarantees, but such liability shall in no event include Ioss ofmofnts or loss of use. NO IMPLIED WARRANTY
OR MERCHANTABILITY OR OF FITNESS FOR PURPOSE SHALL APPLY.
4. CHANGES IN LEGAL TERMS.
The Purchaser may make changes to legal terms by written change order.
5. CHANGES IN COMMERCIAL TERMS.
The Puahasa may make any changes to the terms, other than legal terms, including additions to or del"ions from
the quantities originally ordered in the specifications or drawings, by verbal or written change orda. If any such
change affin s the amount due or the time ofpeffmmance hereunder, an equitable adjustment shall be made.
6. TERMINATIONS.
The Purchaser may at any time by written change order, terminate this agreement as to any or all portions of the
goods then not shipped, subject to any equitable adjustment between the panics as to any work or materials then in
progress provided that the Purchaser shall net be liable for any claims for anticipated profits on the uncompleted
portion of the goods and/or work, fro incidental or consequential damages, and that no such adjustment be made in
favor of the Sella with respect to any goods which are the Sellers standard stock No such temdnatim shall relieve
the Purchasa ar the Sella of any of their obligations as to any goods delivered bereunder.
7. CLAIMS FOR ADJUSTMENT.
Any claim for adjustment most be asserted within thirty (30) days from the date the change or termination is
ordered.
8. COMPLIANCE WITH LAW.
The Sella warrants that all goods sold hereunder shall have been produced sold, delivered and famished in strict
compliance with all applicable laws and regulations to which the goods are subject. The Seller shall execute and
deliver such documents as may be required to effect or evidence compliance. All laws and regulations required to be
incorporated in agreements of this character are hereby incorporated herein by this reference. The Seller agrees to
indemnify and hold the Purchaser harmless from all costs and damages suffered by the Purchaser as a result of the
Sellers failure to comply with such law.
9. ASSIGNMENT.
Neither parry shall assign, tramfa, or convey this order, m any monies due or to become due hereunder without the
prior written consent ofthe other parry.
10. TITLE.
The Sella warrants full, clear and unrestricted title to the Purchaser fro all equipment, materials, and items furnished
in performance of this agreement, free and clear of any and all liens, restrictions, reservations, security interest
encumbrances and claims ofothers.
The Seller shall release the Purchaser and its contractors of any tiff from all liability and claims of any nature
resulting from the performance of such work. This release shall apply even in the event of fault of negligent_ c of the parry released and shall extend to the
directors, officers and employees of such parry.
The Sellers contractual obligations, including warranty, shall not be darned to be reduced, in any way, because
such work is performed or caused to be performed by the purchaser.
14. PATENTS.
Whenever the Seller is required to use any design, device, material or process covered by letter, patent, trademark
Or copyright, the Seller shall indemnify and save harmless the Purchase from any and all claims fro infringement
by reason of the use of such patented design, device, material or process in connection with the contract, and
shall indemnify the Purchaser fro any cost, expense or damage which it may be obliged to pay by ransom of such
infringement at any time during the prosecution or after the completion of the work. In case said equipment, or
any part thereof or the intended use of the goods, is in such suit held to constitute infringement and the use of
said equipment or pan is enjoined, the Sella shall, at its own expense and at its option, either procure for the
Purchaser the right to continue using said equipment or parts, replace the same with substantially equal but
noninfringing equipment, or modify it so it becomes noninfringing.
15. INSOLVENCY.
If the Sella shall become insolvent or bankrupt, make an assignment fro the benefit of creditors, appoint a
receiver or trustee for any of the Sellers property or business, this order may forthwith be canceled by the
Purchaser without liability.
16, GOVERNING LAW.
The definitions ofu ns used or the interpretation ofhc agreement and the rights of all parties hereunder shall be
construed under and governed by the laws of the State of Colomdo, USA. '
The following Additional Conditions apply only in cases where the Sella is to perform work hereunder,
including the services of $tilers Rcionvotative(s), on the premises of others.
17. SELLERS RESPONSIBILITY.
The Seller shall carry on said work at Sellers own risk until the same is fully completed and accepted, and shall,
in case of any accident, destruction or injury to the work and/or materials before Seller's final completion and
acceptance, complete the work at Sellers own expense and to the satisfaction of the Purchaser. When materials
and equipment are famished by others fro installation or erection by the Seller, the Sella shall receive, unload
store and handle same at the site and become responsible therefm es though such materials and/or equipment
were being famished by the Seller under the order.
18, INSURANCE.
The Seller shall, at his own expense, provide for the payment ofworkers compensation, including occupational
disease benefits, to its employees employed on or in connection with the work covered by this purchase order,
and/or to their dependents in accordance with the laws of the state in which the work is to be done. The Sella
shall also carry comprehensive general liability including, but not limited to, contractual and automobile public
liability insurance with bodily injury and death limits of at Into $300.000 for any one person, 5500,000 for any
one accident and property damage limit per accident of 5400,000. The Seiler shall likewise require his
contractors, if any, to provide for such compensation and insurance. Before any of the Sellers or his contractors
employees shall do any work upon the premium of othcm. the Seller shall famish the Purchaser with a certificate
that such compensation and insurance have been pmvided. Such certificates shall specify the date when such
compensation and insurance have been provided. Such certificates shall specify the date what such compensation
and insurance expires. The Sella agrees that such compensation and insurance shall be maintained until after the
entire work is completed and accepted.
19. PROTECTION AGAINST ACCIDENTS AND DAMAGES.
The Sella hereby assumes the entire responsibility and liability for any and all damage, loss or injury of any kind
or nature whatsoever to persons or property caused by or resulting from the execution ofthe work provided fro in
this purchase order or in connection herewith. The Seller will indemnify and hold harmless the Pumhas" and any
or all of the Purchasers officers, agents and employees from and against any and all claims, losses, damages,
charges or expenses, whether direct or indirect, and whether to persons or property to which the Purchases may
be put or subject by reason of any act action, neglect, omission or default on the pan of the Seller, any of his
contractors, or any of the Sellers or contractors officers, agents or employees. In case any suit or other
proceedings shall be brought against the Purchaser, or its officers, agents or employees at any time on account or
by reason of any act, action, neglect omission or default of the Sella of any of his contractors or any of its or
their officers, agents or employees as aforesaid, the Sella hereby agrees to assume the defense thereof and to
defend the same at the Sellers own expense, to pay any and all costs, charges, attorneys firm and other expenses,
any and all judgments that may be incurred by or obtained against the Purchaser or any of its or their Officers,
agents or employees in such suits or other proceedings, and in me judgment or other lien be placed upon or
obtained against the property of the Purchases, or said panics in or as a result of such suits or other proceedings.
the Sella will at once cause the same to be dissolved and discharged by giving bond or otherwise. The Seller and
his contractors shall take all safety precautions, famish and install all guards necessary for the prevention of
accidents, comply with all laws and regulations with regard to safety including, but without limitation, the
Occupational Safety and Health Act of 1970 and all mlm and regulations issued pursuannhereto.
Revised 03/2010
cuYsTnucTIUN'Regional Publications
REMIT TO: THE MCGRAW-HILL COMPANIES
75 REMITTANCE DRIVE SUITE 3085
CHICAGO, IL 60675-3085
BILL TO:
NVOICE
TEAR SHEETS 1
INVOICE A316313 01
ACCOUNT # A30027004
INVOICE DATE 07/27/11
INQUIRIES TO:
TEL 800-648-3045 FAX 609-426-7143
ADVERTISER/AGENCY:
CITY
OF FORT
COLLINS
BETH
DIVEN
P 0
BOX 580
The MCGraWHill Companies
FORT
COLLINS
CO 80522
--------ALL
AMOUNTS
ARE IN U.S.
DOLLARS --------
ISSUE/
::DESCRIPTION:.....
:::.:AGENCY
:::;::NET
.PAGE#1
7, DOLLARS
COMMISSION:
DOLLARS
JOB NUMBER
07/25/11
DENVER DAILY JOURNAL FULL RUN
3 X INCHXICOLUMN
069245001
OFFICIAL
PROPOSAL 1 X RATE
153.60
DOWNTOWN
CONDUIT BACKBON
07/22/11
07/25/11
HYLDK
PO# BID# 7263
TOTAL FOR JOB 069245001
153.60
153.60
1
BILLING TERMS:
AYMENT IN FULL DUE
PON RECEIPT OF INVOICE
TOTAL
TAX/VAT
153.60 0.00
153.60
�'I`�.�v�-cam
nMem�orandum.
From: John Clare
To: Donna Douville, FTA, Region VIII
Date: July 21, 2011
Subject: City of Fort Collins — Downtown Conduit Backbone and Laterals - IFB
I have reviewed the documents forwarded to me regarding the IFB issued by the City of Fort
Collins for the Downtown Conduit Backbone and Laterals. I have used the standard FTA PSR
competitive IFB checklist with the construction supplement to review these documents. Below
are my comments and observations.
Independent Cost Estimate
The independent cost estimate is acceptable.
Advertisement of IFB
The City's checklist indicates a location of advertisement, but copies of actual ads were not
provided.
Adequate Number of Sources Solicited
The City's checklist indicates that known DBE firms and other minority interests were notified,
but actual copies of the notifications were not provided.
Clauses
The following clauses are not contained in the IFB document:
• Cargo Preference
The City's checklist indicates that Fly America is not included. However, this clause is included
in the bid documents. This may indicate that a closer review of the checklist signoffs may be
warranted.
Other Potential Issues
The section of the bid documents containing the FTA clauses includes a description of the
Payment Bond requirements that include the minimum FTA amounts based on contract value.
However, the City's standard General Conditions at Section 5.1 include a requirement for a
Payment Bond in the amount of 100% of the contract price. It is recommended that clarification
be provided to bidders regarding this inconsistency prior to bid opening since it may have an
impact on how the contractors develop their bids.
Please let me know if you have any additional questions or comments.
Memorandum
From: John Clare
To: Donna Douville, FTA, Region VIII
Date: July 21, 2011
Subject: City of Fort Collins — Downtown Conduit Backbone and Laterals - lFB
I have reviewed the documents forwarded to me regarding the IFB issued by the City of Fort
Collins for the Downtown Conduit Backbone and Laterals. I have used the standard FTA PSR
competitive IFB checklist with the construction supplement to review these documents. Below
are my comments and observations.
Independent Cost Estimate
The independent cost estimate is acceptable.
Advertisement of IFB
The City's checklist indicates a location of advertisement, but copies of actual ads were not
provided.
Adequate Number of Sources Solicited
The City's checklist indicates that known DBE firms and other minority interests were notified,
but actual copies of the notifications were not provided.
Clauses
The following clauses are not contained in the IFB document:
• Cargo Preference
The City's checklist indicates that Fly America is not included. However, this clause is included
in the bid documents. This may indicate that a closer review of the checklist signoffs may be
warranted.
Other Potential Issues
The section of the bid documents containing the FTA clauses includes a description of the
Payment Bond requirements that include the minimum FTA amounts based on contract value.
However, the City's standard General Conditions at Section 5.1 include a requirement for a
Payment Bond in the amount of 100% of the contract price. It is recommended that clarification
be provided to bidders regarding this inconsistency prior to bid opening since it may have an
impact on how the contractors develop their bids.
Please let me know if you have any additional questions or comments.
Tr
City "y O•
Planning, Development & Transportation
Engineering
Fort
Collins
281 North College Avenue
580
Fortrt CBox
ollins, CO8 522.0580
970.221.6605
970.221.6378 - fax
fcgo v. comiengineering
Pre -Bid Meeting Agenda - Bid No. 7263
City of Fort Collins Downtown Conduit Backbone and Laterals
Monday, July 25, 2011 - 2:00 p.m.
215 North Mason Street, Community Room
INTRODUCTIONS
John Stephen — Senior Buyer, Purchasing 970-221-6777
Erika Keeton - Special Projects Engineer 970-221-6521
BID OPENING
SCOPE
Monday, August 8, 2011, 3:00 p.m.
Purchasing — 215 North Mason Street, Fort Collins
MAX BRT Project - Two-way conversion of Mason
Conduits, vaults for Traffic, BNSF, BRT Communications
Location: City right of way on Mason Street — Laurel to Maple
GENERAL CONDITIONS AND GENERAL REQUIREMENTS
Substantially complete on or before October 31, 2011
Liquidated Damages - $1000.00 per day
Construction Hours - 7:00 a.m. to 6:00 p.m., Monday through Friday.
Sanitary Facilities
PROJECT SPECIFICATIONS - SECTION 02000
Traffic Control
Pedestrian accessibility during construction
Maintenance during construction
Restoration of landscape and hardscape — concrete, asphalt, potholing flowfill, irrigation
Erosion Control
Vault locks
MISCELLANEOUS
Staging
Proximity to BNSF railroad — Safety certification
QUESTIONS
UCP Reports 1 L 6 ✓ Db,,� Page 1 of 1
Unliled Ceartlfication Program
z�
w Reports
a
Qg On-line Directory. I Work Codes I Work Code Map
�E I Updates
Save as Excel IF - Labels/Text Download
Directory of Certified Disadvantaged Business Enterprises (DBEs)
Contractor: AMERICAN INDUSTRIAL & CONSTRUCTION SUPPLY, INC.
Cert.N: 7145
Contact information:
Veronica LeDoux
Phone: 303-292-5424
Fax: 303-292-9036
975 E. 58th Ave., Unit C
County: Denver
Woman Owned: Y
Denver, CO 80216-0000
Ethnicity: Hispanic
Email: veronicaa@aicscolorad_o.com
Website: hitp //help://www.aicscolorado.com
Work Codes: CDOT GFE Eligible:
60903 Yes Broker fee Concrete
60908 Yes Broker fee Sand
61500 Yes Regular Electrical Products, Supplies And
Dealer 60% Components
62000 Yes Regular Fasteners
Dealer 60%
63200 Yes Regular Industrial Supplies And
Dealer 60% Equipment
64400 Yes Regular Mechanical
Dealer 60%
66100 Yes Regular Roofing
Dealer 60% g
67200 Yes Regular Tools
Dealer 60
Email: Page Master regarding information/ comments about this page
Email: Web MaSter regarding website functionality.
http://apps.coloradodot.info/ucp/ucp_report.cfm 08/23/2011
UCP Reports
Page t of I
,PNZAGFD eG@
o � w
�a
AsPO'
Un~ Certification Pr"raw
Reports
On-line Directory WorkCodes I Work Code Map
I Updates
Save as Excet I, labels/rext Download
Directory of Certified Disadvantaged Business Enterprises (DBEs)
Contractor: NORTHERN COLORADO TRAFFIC CONTROL, INC.
Cert.#: 7496
Contact information:
Trish Moran
Phone:970-356-6881
Fax:970-356-5862
PO Box 490
County: Weld
Woman Owned: Y
Greeley, CO 80632-0000
Ethnicily: Caucasian
Email: nctct mora-n@aol.c_om
Work Codes: CDOT GFE Eligible
20700
Yes
Traffic Control
20701
Yes
Flagging
Flagging
20702
Yes
Channelizing Devices
(Vertical Panels, Barrels,
Cones, Glare Screens)
Channelizing Devices
Vertical Panels, Barrels,
Cones, Glare Screens
20703
Yes
Temporary Impact
Attenuators
Temporary Impact
Attenuators
20704
Yes
Construction Signing
Construction Signing
20705
Yes
Pavement Marking
Pavement Marking
20706
Yes
Pilot Vehicle
Pilot Vehicle
20800
Yes
Delineators And Reflectors
Delineators and
Reflectors
23001
Yes
Permanent Signing
Permanent Signing
66700
Yes
Signage
67300
Yes
Traffic Signs
Email: Page_Master regarding information/ comments about this page
Email: Web Master regarding website functionality.
http://apps.coloradodot.info/ucp/ucp_report.cfm 08/23/2011
FINDING:
Element (18) Award to Responsible Contractor
The grantee shall make awards only to responsible contractors possessing the ability to
perform successfully under the terms and conditions ofa proposed procurement,
considering such matters as contractor integrity, compliance with public policy, record
of past performance, and f nancial and technical resources.
FTA C4220.1 F, CH. VI, 8.b.
Discussion
The City of Fort Collins is deficient with respect to this element. The City was also
deficient with respect to this element in the Procurement System Review performed in
FY2010.
In one of the 35 files reviewed (Wilson -Mohr), there was no evidence that the City made
a determination regarding the contractor's responsibility.
RESPONSE:
Element 18 Award to Responsible Contractor. The City disagrees that it is deficient in
the Wilson -Mohr ($16,028) contract for this element. Info from licensed vendors needed
FINDING:
Element (23) Price Quotations [Small Purchase)
!f small purchase procedures are used, price or rate quotations shall be obtained from an
adequate number ofqualified sources.
FTA C4220. IF Ch. VI, 3.b
Discussion
The City of Fort Collins is deficient with respect to this element. The City was also
deficient with respect to this element in the Procurement System Review performed in
FY2010.
In one of the files reviewed (Colorado Boring), there was no evidence that competitive
price quotations were requested or received from multiple sources.
RESPONSE:
Element 23 Price Quotation (Small Purchase). The City disagrees with this finding. This
was a purchase to Colorado Boring ($4,538) which was part of the overall City blanket
for directional boring work which was bid. A bid tally sheet is attached (Attachment 4)
This was the same type of purchase as made with CTL Thompson and which was met the
requirements for Small Purchase as reviewed by the auditors.
FEDERALLY REQUIRED AND OTHER MODEL CLAUSES
APPLICABILITY OF THIRD PARTY CONATRACT CLAUSES
(excluding micro -purchases, except for construction contracts over $2,000)
TYPE OF PROCUREMENT
Clause
Professional
Operations/
Rolling Stock
Construction
Materials &
Services/A& E
Management
Purchase
Supplies
No Federal Government
Obligation To Third Parties
/
All
All
All
All
All
(by Use of a Disclaimer
False Statements or Claims
All
All
All
All
All
Civil and Criminal Fraud
Access To Third Party
✓
All
All
All
All
All
Contract Records
Changes to Federal
All
All
All
All
All
Requirements
Termination
All
All
All
All
All
Civil Rights Title VI, EEO, ADA
>$10,000
>$10,000
>$10,000
>$10,000
>$10,000
Disadvantaged Business
All
All
All
All
All
Enterprises DBEs
Incorporation of (FTA) Terns
All
All
All
All
All
Suspension and Debarment
I>$25,000
>$25,000
>$25,000
>$25,000
>$25,000
Buy America
>$100,000
>$100,000
>$100,000
Resolution of Disputes,
✓
>$100,000
>$100,000
>$100,000
>$100,000
>$100,000
Breaches, or Other Litigation
Lobbying
>$100,000
>$100,000
>$100,000
>$100,000
>$100,000
Clean Air
>$100,000
>$100,000
>$100,000
>$100,000
>$100,000
Clean Water
>$100,000
>$100,000
>$100,000
>$100,000
>$100,000
Cargo Preference
Involves property
Involves property
Involves property
transported by
transported by
transported by
ocean vessel
ocean vessel
ocean vessel
Fly America 4.
�1
Involves foreign
transport t travel
Involves foreign air
Involves foreign
Involves foreign
Involves foreign air
transport or travel
transport or travel
transport or travel
transport or travel
b air
Davis -Bacon And Copeland Anti-
>$2,000 (including
Kickback Acts
fe vessels
Contract Work Hours And Safety
>$2,500 (except
>$2,000 (including
Standards Act
transportation
>$2,500
ferry vessels)
services)
Bonding
$100,000
Seismic Safety
A & E for New
Buildings &
New Buildings &
Additions
Transit Employee Protective
Transit Operations
Agreements
Charter Bus
All
School Bus
All
Drug Use - Testing and Alcohol
Transit Operations
Misuse - Testing
Patent Rights and Rights in Data
Research &
and Copyright Requirements
Development
Energy Conservation
All
All
All
All
All
Recycled Products
Contracts for items
Contracts for items
Contracts for items
designated by
designated by
designated by
EPA,when
EPA, when
EPA,when
procuring $10,000
procuring $10,000
procuring $10,000
or more er ear 1
1
or more er ear I
or more er ear
Conformance With ITS National
Architecture I
ITS Projects
ITS Projects
ITS Projects
ITS Projects
ITS Projects
ADA Access
A & E
All
All
All
All
Bus Testing
All
Pre -Award And Post Delivery
Audits
All
OPINION OF PROBABLE COSTS
EARLY CONSTRUCTION
ITEM NO
WORK ITEM/DESCRIPTION
UNIT
CITY
COST
ST
nnrrn
CITY
COST
TOTAL PRICE
203-00000
TRENCHING
LF
640
$ 876.80287.70
125
$ 171.25
$ 1,335.75
601-00000
CONTROLLED LOW STRENGTH MATERIALCY
640
$ 52,480.00220.00
65
$ 5,330.00
$ 75,030.00
613-00001
DIRECTIONAL BORING
LF
4,515
$ 71.550.74728.71
1,955
$ 34.325.94
$ 207,605.38
613-000 22
2" HDPE SDR11
LF
17,192
$ 52,703.50-
gl
2,600
$ 8,239.90
$ 60,943.40
61300003
3" HDPE SDR11
LF,514.90
4.400
$ 26.770.00
$ 61,284.90
613-00004
4- HDPE SDRI I
LF
$ -
.776.20
$ -
$ 70,776.20
613-00005
2-PVC SCH 40
LF
550
$ 14,159.88,829.44
114
$ 5.227.16
$ 28,216.48
613-00005
2" PVC SCH 4045' RADIUS 10XINTERNAL DI
EA
17
$ 646.00$
13
$ 494.00
$ 1,140.00
813-00005
2' PVC SCH 40.90' RADIUS 10XINTERNAL DI
EA
17
$ 731.00
$
13
$ 559.00
$ 1,290.00
613-00 006
3" PVC SCH 40
LF
1
325
$ 2,778.75
145
$ 1,239.75
$ 4,018.50
613-00006
3' PVC SCH 4045' RADIUS 10XINTERNAL DI
EA
$
13
$ 598.00
18
$ 828.00
$ 1,426.00
613-00006
3" PVC SCH 40-90' RADIUS 10XINTERNAL DV
EA
$ -
13
$ 663.00
18
$ 918.00
$ 1,581.00
613-00007
4" PVC SCH 40
LF
$
325
$ 4,D46.25
$
$ 4.046.25
613-00007
4" PVC SCH 4D45- RADIUS 10XINTERNAL DU
EA
$ -
13
$ 741.00
$
$ 741.00
613-00007
4" PVC SCH 40-90- RADIUS 10XINTERNAL DU
EA
$ -
13
$ 806.00
$ -
$ 806.00
613-00013
36"X48'
EA
$ -
11
$ 25.300.00
11
$ 25.300.00
$ 50.600.00
613-00010
365 i4 COMM SPLICE VAULT
EA
11
$ 25,300.00
$
$
$ 25,300.00
613-00011
36"X48" COMM SLACK STORAGE VAULT
EA
6
$ 13,800.00
$
$
$ 73,800.00
61300014
18"X31' TRAFFIC VAULT
EA
$ -
$
6
$ 7,650.00
$ 7,650.00
613-00015
13'X24' TRAFFIC VAULT
EA
$ -
$ -
7
$ 6.965.00
$ 6,965.00
613-00016
COMM RANDHOLE
EA
3
$ 2,985.00
$
$
$ 2,985.00
203-01596
POTHOLING
HR
100
$ 30,000.00
100
$ 30,000.00
100
$ 30,000.00
$ 90,000.00
626-00000
MOBILIZATION
LS
0.333333
$ 3,333.33
0.333333
$ 3,333.33
0.333333
$ 3,333.33
$ 10.000.00
630-00000
FIA TRAFFIC CONTROL
Lb
0.3 1
$ 7,200.00
0.4
$ 9,600.00
0.3
$ 7.200.00
$ 24.000.00
TOTAL ESTIMATED COSTS 5287,121.13 E320,052.72 5169197.09 E751,540.85
to°lo cw 1S corn
lMCA
TCFA-c,
j
1-
Bid 7263 Downtown Conduit Backbone and Laterals
CONTRACT CHECKLIST FOR SEALED BIDS
Checklist Item
Contract File
Comments
Location
7) Independent Cost Estimate
In efile and file
Date 7-14-11 by Erika Keeton
The City made and documented an
independent cost estimate before
receipt of proposals.
9) Unreasonable Qualification
NO
Requirements This solicitation did not
contain unreasonable requirements
placed on firms in order for them to
qualify to do business.
10) Unnecessary Experience and
NO Standard requirements
Excessive Bonding
Unnecessary experience and
excessive bonding requirements were
not included in this solicitation or
contract documents.
11) Organizational Conflict of
NO
Interest (OCI)
If there is an apparent or potential OCI
the solicitation contains provisions to
eliminate or mitigate the conflict (e.g.
by inserting a clause that prohibits the
contractor from competing for the
follow-on contract to the current design
or research contact) and OCI
Certification is submitted by the
contractor.
12) Arbitrary Action
NO
There was no arbitrary action in the
procurement process. (An example of
arbitrary action is when award is made
to other than the contractor who most
satisfied all the City requirements as
specified in the solicitation and as
evaluated by staff.
13) Brand Name Restrictions
NONE
Brand Name or Equal. When it is
impractical or uneconomical to provide
a clear and accurate description of the
technical requirements of the property
to be acquired, a "brand name or
equal' description may be used to
define the performance or other salient
characteristics of a specific type of
property. The City must identify the
salient characteristics of the named
brand that offerors must provide. When
using a "brand name" specification, the
City does not need to reverse -engineer
a complicated part to identify precise
measurements or specifications in
order to describe its salient
characteristics. FT A's "Best Practices
Procurement Manual," (BPPM)
contains additional information on
preparation of specifications including
examples with specific language.
14) Geographic Preferences
NO
The solicitation contains no in -State or
local geographic preference except
where Federal statutes mandate or
encourage them.
15) Contract Term Limitation
NO
The contract period of performance for
rolling stock and replacement parts
does not exceed five (5) years inclusive
of options without prior written FTA
approval. For all other types of
contracts, the procurement file contains
evidence that the contract term is
based on sound business judgment.
16) Written Procurement Selection
YES
Procedures
The City has written selection
procedures and the solicitation also
identifies all requirements that offerors
must fulfill and all other factors to be
used in evaluating bids or proposals.
17) Solicitation Prequalification
NO---- POST QUALIFY
Criteria
The solicitation required
prequalification of persons, firms, or
products. The list is current includes
enough qualified sources to ensure
maximum full and open competition,
and potential bidders are not precluded
from qualifying during solicitation
period from issuance of the solicitation
to its closing date.
If the solicitation does not contain a
prequalification requirement, check NA.
18) Award to Responsible
Erika Keeton, Project Manager,
Contractor
reviewed the bids for accuracy, and
The City made a determination that it
Tetra Tech is the apparent low
was awarding to a responsible
bidder. The bid prices are reasonable
contractor considering such matters as
and she recommend award to Tetra
contractor integrity, compliance with
Tech Construction Services, Inc.
public policy, record of past
performance, and financial and
Reference checks are in the file.
technical resources.
19) Sound and Complete Agreement
YES
This contract is a sound and complete
agreement. In addition, it includes
remedies for breach of contract and
provisions covering termination for
cause and convenience.
23) Price Quotations
YES 3 BID RECIEVED
Price or rate quotations were obtained
from an adequate number of qualified
sources.
24) Clear, Accurate, and Complete
YES
Specification
A complete, adequate, and realistic
specification or purchased description
was available and included any
specifications and pertinent
attachments which define the items or
services sought in order for the bidder
to properly respond.
25) Two Bidders
YES Bids were received from 3
Two or more responsible bidders were
contractors
willing and able to compete effectively
for the business.
26) Firm Fixed Price
YES
A firm fixed price contract was
appropriate for this procurement.
27) Selection on Price
YES
The selection of the successful bidder
could be made principally on the basis
of price.
28) Discussions Unnecessary
YES EXCEPT PRE BID WAS
In this procurement, other than a
HELD JULY 25, 2011
prebid conference, discussions with
bidders should not be needed between
solicitation and award.
29) Advertising
YES DAILY JOURNAL AND
The Invitation for Bids was publically
COLORADOAN AND COPIES
advertised.
ARE IN THE EFILE
30) Adequate Number of Sources
YES, Also notice sent DBE
Solicited
vendors from CDOT List for
Bids were solicited from an adequate
Potholing and Traffic Control and
number of known suppliers.
also to the Hispanic Chamber of
Commerce.
31) Sufficient Bid Time
3 WEEKS
Prospective bidders were provided
sufficient time to prepare bids prior to
the date set for opening the bids.
32) Bid Opening
YES
All bids were publicly opened at the
time and place prescribed in the
invitation for bids.
33) Responsiveness
YES
A firm fixed price contract was awarded
in writing to the lowest responsive
bidder.
34) Lowest Price
NA
The bidding documents specified that
factors, such as discounts,
transportation costs, and life cycle
costs, would be considered in
determining which bid was the lowest.
These factors were considered by the
City in determining which bid was the
lowest.
If these factors were not specified,
check NA.
35) Rejecting Bids
NA
A bid (or bids) was rejected for a sound
documented business reason.
If no bids were rejected, check NA.
40) Evaluation of Options
NO
The option quantities or periods
contained in the contractor's bid or
offer were evaluated in order to
determine contract award. (To be
eligible for Federal funding, options
must be evaluated as part of the price
evaluation of offers, or must be treated
as sole source awards.
41) Cost or Price Analysis
WAS A BID
Either a cost analysis or a price
analysis was performed and
documented. The price was
determined to be fair and reasonable.
42) Written Record of Procurement
1. Pricing can be obtained by
History
Sealed Bidding.
The file contains records detailing the
2. Contract will be a firm fixed
history of this procurement. At a
Price.
minimum, these records include:
3. Lowest Responsive
(1) the rationale for the method of
Responsible Bidder
procurement,
4. Firm Fixed Price
(2) Selection of contract type,
(3) reasons for contractor selection or
rejection, and
4 the basis for the contract price.
43) Exercise of Options
Not Applicable
The grantee exercised an option on
this contract adhering to the terms and
conditions of the option stated in the
contract and determined that the option
price was better than prices available
in the market or that the option was a
more advantageous offer at the time
the option was exercised.
If an option was not exercised under
this contract, check NA.
44) Out of Scope Changes
Not Applicable
The grantee amended this contract
outside the scope of the original
contract. The amendment was treated
as a sole source procurement
(complying with the FTA requirements
for a justification, cost analysis and
profit negotiation).
45) Advance Payment Provisions
NO
The contractor did not receive an
advance payment utilizing FTA funds
and the contract does not contain
advance payment provisions or, if it
did, prior written concurrence was
obtained from FTA.
46) Progress Payment Provisions
YES
The contract contains progress
payments based on costs incurred (as
opposed to percent of completion) and
the contract contains a provision giving
the grantee title to property (materials,
work in progress, and finished goods)
for which progress payments are
made. The contract may contain other
security in lieu of obtaining title.
47) Time and Materials Contracts
NO
This is a time and materials contract;
the grantee determined that no other
type of contract is suitable; and the
contractspecifies a ceiling rice.
48) Cost Plus Percentage of Cost
CORRECT
This is not a cost plus a percentage of
cost type contract.
49) Liquidated Damages Provisions
YES
This contract contains liquidated
damages provisions and the
assessment for damages is specified in
the contract at a specific rate per day
for each day of overrun in contract