Loading...
HomeMy WebLinkAboutWORK ORDER - BID - 7107 CARPENTRY CONTRACTOR 2010 (4)g115 I `� 7 EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND Finishing Touch DATED: August 19, 2011 Work Order Number: Purchase Order Number: Project Title: Running Deer Natural Area Fire Lookout Cab Move and Stabilization Commencement Date: August 29`" 2011 (or as soon as small Siberian elms are trimmed and cut down by Natural Areas Stafo. Completion Date: October 14, 2011 (move) and November 15, 2011 (stabilization/repair) Maximum Fee: (time and reimbursable direct costs): $9,250 Project Description: Move the West White Pine Fire Lookout Cab Y miles north (see map) by October 14, 2011 and then stabilize and repair as per the drawings prepared by Weeks and Associates Structural Engineers dated 6117111. Scope of Services: Install concrete piers and move cab to new location by October 14, 2011; stabilize and repair cab as per the proposal dated &12/i l by November 15, 2011. Acceptance: n %� User Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of two (2) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given City of Fort Collins By: Profe al: �- �� _ Director of Purchasing and Risk By: "'� Management (over $60,000.00) Da �'�4, —`� Date: Finishing Touch PO Box 1303 Phone: 970-834-1764 Ault CO 80610 Email: FinishingTouch@Skybe Fax: 970-834-2734 com Date: 8-12-11 PROPOSAL TO: Karen Mancy Re: Running Deer Open Space City Of Ft. Collins Ft. Collins, Colo. Karen, Listed below is our scope and pricing for the moving and repairs to the viewing platform at Running Deer Open Space; Crane time: 6hrs. At $195.00 per hr. $1,170.00 Labor & mat. to move platform and install 7 concrete piers. $3,400.00 Material to repair platform as per drawings. $2,600.00 Labor to repair platform.5 men 2 days @ 26.00 per hr. $2,080.00 $9,250.00 Exclusions: 1. Tax 2. Permits We have estimated the crane and labor time. If it takes less time we will credit the overage in this bid. We have used 2 x 6 southern yellow pine (syp) for the decking since there was no spec on what to use. If you have any questions please feel free to call. The lumber pricing is good for 30 days. We are in the busy time of the year so please keep this in mind if you choose to move forward with this project. Thank 'You george Moore Fo�tColllns CITY OF FORT COLLINS CLYc( Fort Collins as >. PARKS AND NATURAL AREAS '�� Legend �ry cMtlnu LeafeO rvauY Net ��Camjry EaX wt ndd W LWxy La TbSl Q INdi+CNWA Ama B..,Ory d F. CW'm NabNNta ,_era CpMq 4..1 Nea MW Fu.. S... C.1y n C..P fj. N Tail ?eni C.aCMO Ls I:�in3t CMu Cw Crm .. E.d O 0070M1AklbS .OJSD.OT 0.14 I inn = 9m Icel