Change Order Form
PROJECT TITLE: 2010 Street Maintenance/2011 GID Project
PROJECT NUMBER: 590106 (Bid No. 6046)
CONTRACTOR: Vogel Concrete (PO #9111335)
CHANGE ORDER NUMBER: 14
n preparing change orders show in order as separate numbered paragraphs me o owing:
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change in contract time.
1.&2. Increase contract to include handicap ramp parking spaces in Downtown.
3. There will be no change in contract cost. $0.00
4. There is no change in contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
0.00%
4.72%
$317,679.16
$15,000.00
$0.00
$0.00
$332,679.16
ACCEPTED BY:
DATE:^1
ntative)
/
APPROVED BY:
DATE:
n
(Project Manager - Engl ing)
APPROVED BY:
DATE:
a'L•LI
Depa ment Head)
APPROVED BY:
DATE:
(Purchasing Agent over $60,000)
cc: Contractor
Purchasing
Project File
City of Fort Collins
2010 Concrete Project
Vogel Concrete
Bid No. 6046 Renewed
Change Order No: 14
Chad: 7NW2011
1 Reason For Change:
A. Adtlilional work required Thal extended beyond the mope of work.
B. Radiation of quantilea to offset items expended boyeM the scope of work and shown below in tl3.
2 Description Of Chang.:
A. Description of work beyond scope of contract
Cell for additional Use protect and the direction of And. City Forrester. hand removal of concrete, hand digging around
a rout systems anti
b. cast red plasma cuts to Bl noddetl dome access ramp panels over exeMg curbs stops
Use d toms, Inch to remove deledomled steel boards inati Bed to support sidewalk (N C. Puts
J. Oecoats. cover resets at Cupbrord home wde Glare
a. Resat towns pbce Thal was entered wet Des sid.wek, once removed as to not damage piece.
f Removed by contacts, to expedite prated all reduce Iffish m burnmea operations. (Beall Housa, Subway, Comes
PW Lulu Moms. Blsellye anal Rikviia
g. humsialdet 0 Ped, Bagslane pieces wish the use of cram/boon M Escondido I Wear it Again Sam
h Pau n plots W raeforced carcreb well at foundation to ratan Ikov fJ In advances or covets sidmvok
j, Pau in pace W mentonced corcrom wall M foundation to retain now 81 n advance of mandete sddevark
J. Pour n place m reiJwced cuourele.1 el foundation to ratan now 08 in advas of cwveto s uesank
it. Removal of miry land lips on flagstone sot, and vip hamrda that use'I wanent cariM. remwel.
I. Clearing supplies, ... hardware, temporary tamps and wedges l6 cations)
IT FlowNl coding of Cupboard, Essentuallals and Crown Pub
n. Tree well pdedon dud, grate manubwimk, all modification
B. Reduce contract amount by $22,228.85
3 Change In Contact Amount:
A. Itemized Cast
Item
ray
fruit
cost
Unit
Total Cost
a. Additional Tree Protection
1
$
178.00
LS
$
178.00
b. Trusted dome allemrliurs to adapt m held
1
$
85.00
LS
$
85.00
v. Beam removal l cutfng twin
1
S
85M
LS
S
85.110
it. Decorative pavan resets at Cupboard store
1
$
10.00
LS
S
7D.00
e. Stand [.,domeet
1
$
➢O.00
LS
$
7000
L Rose/resin patio.11, 1 fumilu'e as repo
1
$
460.00
LS
It
460.00
g. Flagstone nstakilion
1
3
1,681.25
LS
S
1,661.25
h Facedown oval bock off I Cupboard
1
3
4,981.18
LS
S
4.961.18
i. Poullddion oval bock off /Essentials
1
$
945.00
LS
$
945.00
j, Foundation wa961ock off/Cram Pub
1
3
1,245.00
LS
$
1,245.00
k. Sldemak/nagstwe ,we,
1
$
90.00
LS
$
90.00
I. smorwwrie
1
$
288A7
L5
S
288.17
Ifs. Flown)
139.00
S
34.21
LS
$
11,713,53
n. Tree well protection
IM
S
376.72
LS
$
326.22
$
22,228.85
B. Items Reduced
a 608.10 Flalwwk 6 R 8 R
-25M
G.09
SF
$
(15,225.Oo)
b. BOB ZL- Concrete Pavement W-R8R
-514.18
8.03
SF
$
(4,128.85)
C. 608.26-Exposed Ag9regabs4-upcharga
-25W
1.15
SF
S (2.BT600)
S
(22.228.65)
TOTAL GRANGE IN CONTRACT AMOUNT
TOTAL
$0_80
4 Chang. In Contract rime
A. No CM1angc
B. Nn CM1angc
TOTAL CHANGE IN CONTRACT TIME