Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 6046 CONCRETE MAINTENANCE PROJECT (16)/''F�ort Collins �� ngineering Planning, Development & Transportation Engineering 281 North College Avenue P.O. Box 580 Fort Collins, CO 80522.0580 970.221.6605 970.221.6378 - fax Change Order Form PROJECT TITLE: 2010 Street Maintenance/2011 GID Project PROJECT NUMBER: 590106 (Bid No. 6046) CONTRACTOR: Vogel Concrete (PO #9111335) CHANGE ORDER NUMBER: 14 n preparing change orders show in order as separate numbered paragraphs me o owing: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1.&2. Increase contract to include handicap ramp parking spaces in Downtown. 3. There will be no change in contract cost. $0.00 4. There is no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST 0.00% 4.72% $317,679.16 $15,000.00 $0.00 $0.00 $332,679.16 ACCEPTED BY: DATE:^1 ntative) / APPROVED BY: DATE: n (Project Manager - Engl ing) APPROVED BY: DATE: a'L•LI Depa ment Head) APPROVED BY: DATE: (Purchasing Agent over $60,000) cc: Contractor Purchasing Project File City of Fort Collins 2010 Concrete Project Vogel Concrete Bid No. 6046 Renewed Change Order No: 14 Chad: 7NW2011 1 Reason For Change: A. Adtlilional work required Thal extended beyond the mope of work. B. Radiation of quantilea to offset items expended boyeM the scope of work and shown below in tl3. 2 Description Of Chang.: A. Description of work beyond scope of contract Cell for additional Use protect and the direction of And. City Forrester. hand removal of concrete, hand digging around a rout systems anti b. cast red plasma cuts to Bl noddetl dome access ramp panels over exeMg curbs stops Use d toms, Inch to remove deledomled steel boards inati Bed to support sidewalk (N C. Puts J. Oecoats. cover resets at Cupbrord home wde Glare a. Resat towns pbce Thal was entered wet Des sid.wek, once removed as to not damage piece. f Removed by contacts, to expedite prated all reduce Iffish m burnmea operations. (Beall Housa, Subway, Comes PW Lulu Moms. Blsellye anal Rikviia g. humsialdet 0 Ped, Bagslane pieces wish the use of cram/boon M Escondido I Wear it Again Sam h Pau n plots W raeforced carcreb well at foundation to ratan Ikov fJ In advances or covets sidmvok j, Pau in pace W mentonced corcrom wall M foundation to retain now 81 n advance of mandete sddevark J. Pour n place m reiJwced cuourele.1 el foundation to ratan now 08 in advas of cwveto s uesank it. Removal of miry land lips on flagstone sot, and vip hamrda that use'I wanent cariM. remwel. I. Clearing supplies, ... hardware, temporary tamps and wedges l6 cations) IT FlowNl coding of Cupboard, Essentuallals and Crown Pub n. Tree well pdedon dud, grate manubwimk, all modification B. Reduce contract amount by $22,228.85 3 Change In Contact Amount: A. Itemized Cast Item ray fruit cost Unit Total Cost a. Additional Tree Protection 1 $ 178.00 LS $ 178.00 b. Trusted dome allemrliurs to adapt m held 1 $ 85.00 LS $ 85.00 v. Beam removal l cutfng twin 1 S 85M LS S 85.110 it. Decorative pavan resets at Cupboard store 1 $ 10.00 LS S 7D.00 e. Stand [.,domeet 1 $ ➢O.00 LS $ 7000 L Rose/resin patio.11, 1 fumilu'e as repo 1 $ 460.00 LS It 460.00 g. Flagstone nstakilion 1 3 1,681.25 LS S 1,661.25 h Facedown oval bock off I Cupboard 1 3 4,981.18 LS S 4.961.18 i. Poullddion oval bock off /Essentials 1 $ 945.00 LS $ 945.00 j, Foundation wa961ock off/Cram Pub 1 3 1,245.00 LS $ 1,245.00 k. Sldemak/nagstwe ,we, 1 $ 90.00 LS $ 90.00 I. smorwwrie 1 $ 288A7 L5 S 288.17 Ifs. Flown) 139.00 S 34.21 LS $ 11,713,53 n. Tree well protection IM S 376.72 LS $ 326.22 $ 22,228.85 B. Items Reduced a 608.10 Flalwwk 6 R 8 R -25M G.09 SF $ (15,225.Oo) b. BOB ZL- Concrete Pavement W-R8R -514.18 8.03 SF $ (4,128.85) C. 608.26-Exposed Ag9regabs4-upcharga -25W 1.15 SF S (2.BT600) S (22.228.65) TOTAL GRANGE IN CONTRACT AMOUNT TOTAL $0_80 4 Chang. In Contract rime A. No CM1angc B. Nn CM1angc TOTAL CHANGE IN CONTRACT TIME