CHANGE ORDER NO. 2
PROJECT TITLE:
Registry Neighborhood Park
CONTRACTOR:
J•2 Contracting Co.
PRQIECTNUMBER:
7209
PURCHASE ORDER NO.:
9111342
DESCRIPTION:
Miscelaneous Small Contract Changes
1. Reason for charge: Sawcul Existing 4' Walk at 6" wide to gel consistent cross slope on adjacent walk. Repour newwalk
at 4.5'. Modify plating for Restrcom Roof Rake for 2:12 root. Paint Equipment Room (Interior).
Change Bluegrass sod to Kerby Vortex Sod. Charge Bluegrass Seeding to Korby Vortex Seed. Add
landscape area in playground walk section with (1) Honey Locust, (5) Karl Forester Gasses, and
associated drip irrigation. Thicken sand section to 10" for'diggee playground equipment.
2. Description of Charge;
1) Refer to CWRN2 Dated A29/11 for details S 15,528.20
3. Change in Contract Cost:
4. Change In Contract Time: Extend by 3 Days
TO IAL APPROVED CHANGE ORDER
3 22.003.20
TOTAL PENDING CHANGE ORDER
S
TOTAL THIS CHANGE ORDER
28.20
S 15,528.20
TOTAL % ORIGINAL CONTRACT, THIS C.O.
TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S
3.59%
ADJUSTED CONTRACT COST
f1,081,831.40
(Assuming all charge orders approved)
ACCEPTED BY: ',�G•Ce /� DATE: = t OI I
Conracloes Represonl�llvo ------
/ (�
ACCEPTED BY: /ram t— DATE:
Project Manager
REVIEWED BY:
Tille:
APPROVED BY:
Title:
DA
PLU=11
APPROVED BY: DATE:
Purchasing Agent over $30,000
«: city aenr ArehNw
Conlmclor EgInear
PMjW FI4 Pw .slna
CHANCE IN WORK RE.QU¢ST "2"
Initiation Date:
7n9Q0/1
Project)
Rcipi Neighborhood Park
Owner:
City of Fort Collins
To:
J4 Counsellog Co.
Requested by
Craig Killing
Authorized by:
Craig Kisling
Please furnish change in contract sum lot the change in work described below. Do not order material or start any work until approval is received, Every effort will be made to
incorporate this change gran the work without afpecling the conlracr dale.
Description of Proposed Changes -
amount
1)
Sawwt e' Concrete on 4' Walk In ROW (700 LF Q $3 0015F)
$2.100.00
2)
Demo- Existing Concrete Flatwork (390 SF Q $4.00/SF)
$1,500.00
3)
Standard Grey Concrete Flatwnrk (390 SF ® $2.801
$1,014.00
4)
Paint Equipment Room (Intedor)
$920.00
5)
Additional 2"x B" Plating Material for 2:12 Rake Roof to malmaln wnsistant 2.12 around lower roof
$138.00
given inconsistent Top of Child elevations
8)
Addition be Landscape Bed In Playground Area- Irrigation Staining under Side milk/Sand Area, Drip Irrigation In Tree/Grasses
$315.00
7)
Addition of Landscape Bed In Playground Area- 5 Karl Forester Grasses at $27D0hEA
$135.00
8)
Addition of Landscape Bed In Playground Area- 1 Honey Locust at 3250.00 EA
$250.00
9)
Change all Sod to Kerby Vortex Sod (No Additional Cost)
$0.00
10)
Change all bluegrass seed to Korby Vortex Seed
E8,897.00
11)
Add 4" Sand to 'Digger area (484 SF/l0 Tons @ 535,00Ron)
$350.00
12)
Deduct 58 SF Grey Concrete Flatwork for in Playground Landscape Island (5B SF @ $2.801
4150,810
TOTAL $15,528.20
J-2 Cuomcfi.e C.. , egrens to change the work described above for the change to price shown below. 1 have
attached a brcul down which lists all costs of labor, materials, taxes, overhead, profs) and all other changes and/or charges involved. Signature oflhc Contractor indicates his
agreement herewith, including any adjustment in the Contract Sum or Contract Time.
The Controct Time will be Increased by 3 Days.
No change in Contract SUM (Inital ifna chsnse) _
ADD to the Contract Sum S 15.528.20
DLUUCf form the Contract Sum S
Phis information shall be valid for thirty, (30) calendar days from die date of signature below.
CON TRACTOR'S SIGNATURE—,---' 'oxi-n: 7129R011
Contractor Than hero one copy and mmm ORIGINAL te O r
APPROVED BY OWNER: (�/� / / I"� )
t
Accepled Chung, ra work request will be included in a future formal change order DO NOTbill for this change anti a forum! change aide, has been exec and by all
purdi . Acceptance is direction toproceedwtrh the work describedherefe. Nor valid unless signed by the owner and the contractor.