HomeMy WebLinkAboutWORK ORDER - RFP - 7084 CONSULTING ENGINEERING SERVICES (13)EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND Anderson Consulting Engineers. Inc. DATED: June 7. 2011 Work Order Number. SB- 2011-3yE-W LiL3 % Purchase Order Number. Charge # 504-5040452804-521210.3 Project Tdle: Magnolia Outfall Feasibility Investigation Commencement Date: June 8, 2011 Completion DateL-July 1, 2011 Maximum Fee: (time and reimbursable direct costs): $ 19,958.00 Kext�#to c t Am -0/fii Project Description: Analyze the Magnolia Outfall alternative alignment for feasibility and constructability and complete a hydraulic model to determine actual Dioe sizes. Scope of Services: See attached scope of work Service Provider agrees to perform the services identified above and on the attached fortes in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity In the terms of the Services Agreement and this work order (including the attached fortes) the Services Agreement shall control. The attached forms consisting of three (2) pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. CC: Purchasing Service Provider ey'Wf° Date: City of Fort Collins: Submitted By: ",_ & Project Manager Date: / % Reviewed By: SW M1ster Planning & 0 In. Mngr. Date: 8 D AI Reviewed By: ter Eng. and Field Se�rv.. Mngr. Date: / Approved By: N/A Utilities General Manager Date: Approved By: Dir Purchasing & Risk Mgt Data: EXHIBIT A June 3, 2011 SCOPE OF WORK for MAGNOLIA OUTFALL FEASIBILITY INVESTIGATION The intention of this scope of work is to define the work effort for Anderson Consulting Engineers, Inc. (ACE) to conduct a feasibility investigation of the alternative Magnolia Outfall alignment east of College Avenue, as identified in ACE's 2009 proposal to the City of Fort Collins. The purposes of this investigation are to refine the current conceptual design and identify potential fatal flaws in directing the Magnolia Outfall through the Udall Property. Task 1. Field Reconnaissance and Review of Available Information This task will include one site visit to be conducted with City staff in order to assess site conditions at the south end of the Udall Property and visually evaluate potential alignments for the Magnolia Outfall. The field reconnaissance effort will include an identification of possible limitations and restrictions with respect to pipe alignment and outlet location/configuration along the bank of the Poudre River. All pertinent available information will be collected and reviewed, including but not necessarily limited to: (a) sanitary sewer survey information along Olive Street, to be provided by the City; (b) the Baseline Hydrology and Selected Plan of Improvements for the Old Town Basin [ACE, 2003]; (c) background Information associated with the plan and profile of the alternative alignment, as identified in the ACE proposal for the Magnolia Street Stormwater Outfall Project [ACE, 20091; (d) the "Water Quality Master Plan, Conceptual Alternatives for the Old Town Basin," [ACE, 20111; and (e) detailed topographic site mapping of the Udall Property [King Surveyors/ACE, 2011]. Task 2. Feasibility Evaluation Based on the field reconnaissance and review of available data, the conceptual -level plan and profile prepared for the ACE proposal will be modified to avoid, if possible, all existing sanitary sewer crossings of the proposed outfall alignment between the river and the Remington/Magnolia intersection. If it appears that construction depths would be excessive in this configuration, consideration will be made for intersecting sanitary sewer lines less than 12 inches in diameter with the proposed storm sewer and protecting the sanitary sewer(s) accordingly. A basic StormCAD model will be prepared using this Initial storm sewer configuration. The proposed storm sewer will be analyzed using 100-year discharges In an effort to optimize pipe sizes by allowing surcharging of the system. Assuming the initial storm sewer can be reduced in size, adjustments will be made to the profile in order to minimize pipe depths to the extent possible. The StormCAD model will be modified and the system re -analyzed to confirm proper performance. Two storm sewer outlet configurations to the Poudre River will be considered at a conceptual level, one pipe outlet customized to local bank conditions and one open channel configuration with a hardened spill to the river. Special consideration will also be given to the 90-degree bends at the Olive/Mathews intersection and the Mathews/Magnolia intersection. The size, depth and location of the specials required to make double 45-degree bends at these intersections will be considered in terms of constructability. Finally, constructability along both Olive Street and Mathews Street will be investigated with respect to the width of disturbance required for the pipe size and depth, along with other possible utility conflicts. A graphical plan and profile of the resulting Magnolia Outfall configuration will be produced. In addition, sketches will be prepared for the areas of special consideration, including the storm sewer outlet at the river and the two 90-degree bends. A brief report will be prepared documenting the feasibility evaluation. Recommendations will be included concerning the viability of the alternative alignment and future considerations for final design of the system. 00FC7011.08 MagnoliaOutfall_ sm.doa Page 1 of 1 ANdERSON CONSubiNq ENq NEERs, INC. Magnolia Oudall Feasibility Investigation EXHIBIT B BUDGET for the MAGNOLIA OUTFALL FEASIBILITY INVESTIGATION June 3, 2011 PROJECT ?Wagnolla Oudall Feasibility InvesBgat/on CLIENT?, •?;City of Fort Collins )Utilities - A1lderson ConsulNng,Engine`m; Inc. Dliect !i"abo[ - ODCs Totals ACEPROJECTNO.: COFC2011.08 PREPAREDBY: GJK DATE: 011MV2011 Principal Engineer $1328u Project Manager $1101hr Project Engineer $82Ihr Senior GISICADO Technician $7716r GISICADD Technician $72I1hr Admin. $72Ihr Admin. Assistant $65Ihr Other Direct Costs TawDescription - Hours l . Hours Hours Hours Hours _ _ Hours Hours Cost Hours Cost 1. Field Reconnaissance and Review of Available Information 8 6 8 I 6 I $0 28 ' $2,834 2. Feasibility Evaluation 36 40 72 ( 12 10 2 2 $150 174 ' $17,124 • - TOTAL PROJECT HOURS _ 44 46 - 80 18 _ 10 _ 2 2 202 • TOTAL -PROJECT BUET DG' _ $5,808 ; _ $-. 5,060 $8,560 $1,386 _ $720 $144 $130 $150 $19,958 COFC2011.08_MagnoliaOudati budgeLxlsx ANEERSON CONSuITING ENGINEERS, INC.