HomeMy WebLinkAboutWORK ORDER - RFP - P1066 ENVIRONMENTAL SERVICES (3)Rp, 40 16 z
FACILITIES REQUISITION FORS[ po .90 5 i q 3
VENDOR Walsh Environmental Scientists&Engineers. Inc. DATE 8/23111
REQ BY: Ron Kechter Work Order # 426489 STANDING CONTRR WO # FAc-EN-05-2011
CHARGE# 400501000.521160.1 TOTAL COST: $36.590.00 - BUYER: Opal Dick
OTY DESCRIPTION
COST
1 Amend P.O.9 t04006 to add additional Construction Spotter Services, per your Proposal dated June 2, 2011. S36,590.00
COMPUTER INPUT INFORMATION:
VENDOR# REQUISITION # DATE ENTERED:
EX,41BrT ''A"
WORK ORDER FORM
2URSJAN7 TO AN AGREEMENT 9ETW7ZH
THE CITY OF FCRT COLLINS
ANC
97AL5 EN'7=3OCC4ENTAL SCL:N^_iSTS & ENGINSERS, 22IC.
DA^ED: June r, 2007
Work- Order Number: FAC-EN-05-201.1
Purchase order Number: 9104006
Project Title: Ulicoyerymmeum
Commencement Date: August01,2011
Comoletior. Date: November 05, 201t
Maximum Fee (time and reimbursable direct costs): 576,590.00
Project Description: Censtructinn nfa DiscoveryMuscum at the Slaaicez Park aropa[y, complete wide the associated
site worS, curb & gutter, paving, sidewalks, utilities, fencing and landscaping.
Scope of Services: Additincal 27 days of excavation uversiehl and materials management services for tLe South and
Last Phases of the project and reporting for the fma! pease at the Discovery btuseum. site, per your Proposal dazed June 2, 2011.
Service Provider agrees to perform
the services identified above and on
the attached forms in accordance
with the terms and conditions
contained herein and in the Services
Agreement between the parties. In
the event of a conflict between or
ambiguity in the terms of the
Services Agreement and this work
order (including the attached (ores)
the Services Agreomer.t shall
control.
SERVrCE PROVIDER
0v: G
Cate: 815- z0I (
T
CC: Purchasing
ACCEPTANCE RonKechrar
USER
The attached forms consisting
of rcur (!L) pages are hereby
accepted and incorporated
herein by this reference, and
Notice to Proceed is hereby
given -
CITY Ce T Co' rIMS ^-�—
x�X
0a [e: Augur: 02, 2011
Director of Purchasing er.d Risk Maragement over
SGO,COG.
l 'alsL
F nvinm nlcnrd SCIC110115:1nd lar;inccn. LLC
an cnd.�:p• anA anvinmmou enmpnnj
June 2, 2011
Mr. Ron Kechter
City of Fort Collins
Operations Services Department
300 LaPorte Avenue
P.O. Box 580
Fort Collins, Colorado 80522-0580
RE: Request for Contract Value Increase for Excavation Oversight and Materials
Management Services
Discovery Museum Project, Fort Collins, Colorado (South and East Phases)
WALSH Project Number: 900055.7983.010
Dear Mr. Kechter.
At your request, WALSH Environmental Scientists and Engineers, LLC (WALSH) is pleased to
provide this request for contract value increase for excavation oversight and materials management
services for the Discovery Museum project. This document provides a summary of estimated
project -related costs based on a soil disturbing schedule of twenty-seven (27) days for the phases
identified above.
A spreadsheet identifying estimated charges is included as Attachment A. WALSH respectfully
requests a contract value increase for this phase of the project in the amount of $36,590 which
includes a ten (10) percent contingency on labor hours. Actual project costs may be more or less
depending on the final schedule, actual site conditions encountered, and available personnel
assigned to the project. Labor and other direct costs will be billed on a time and materials basis
according to established 2011 rates identified in WALSH's General Environmental Services
Contract (P 1066) with the City. This proposal assumes a standard eight (8) hour workday on site
with additional time [one (1) hour] allotted for field equipment calibration, maintenance, etc. for a
total of nine (9) hours daily. For daily oversight consisting of four (4) hours or less per day, a half
day rate will be charged. For daily oversight consisting of more than four (4) hours but less than or
equal to eight (8) hours per day, a full day rate will be charged. A half day rate will be charged for
work cancellations (i.e., due to weather conditions, scheduling conflicts, etc.) where notice is
received less than the end of business the day in advance.
It should be noted that asbestos soil inspection is considered a limited screening activity conducted
to comply with the requirements of the MMP, SCMP, and State regulations, but is not exhaustive
and cannot guarantee or warranty soil to be tree of asbestos debris or contamination.
Rw Coflini Wr¢c: ]0.'1 rcdain9 hind • Suilc _'40 • Fnn Cu!lir... Colar.,du tif1.J26 B"I • f'hnnc (910) ':'.J 5.F55 • FAX 0711) _:. 3377
t:orp,v:uc Vffcc: 4NM lb:ul Gait Cinic • S.WC 108 • (4:aldc�, CtdwaJn • r4l itll -'!:: - I'lumetitlh a?.779" . FY\ ;(lij :41' 036'
Mr. Ron Kechter
City of Fort Collins
June 2, 2011
Page 2 of 2
If you have any questions regarding the information included in this document please contact me
at (970) 223-5655 or tsanders@walshenv.com.
Sincerely,
Troy C. Sanders, PG, CHMM
Branch Manager/Senior Geoscientist
Attachment (Cost Spreadsheet)
LLC
au ccnlu.{-and owinmmem mmpanr
&wasii
Environmental Scientists and Engineers, LLC
an ecology and environment company
ESTIMATED DIRECT HOURS AND COSTS
Client: City of Fort Collins
Project: Discovery Museum - Excava5on OS and MMS - South and East
Tasks
Task 1 Planning/Project Management
Task 2 Oversight
Task 3 Reporting
Rate/Hr
Title
Project Assignment
Name
Total
Task 1
Task 2
Task 3
WALSH TEAM
$126.20
Scientist VI - 1
Project Management/Senior Inspector Sanders, Troy
63
32
18
$126.20
Scientist VI - 1
Senior Technical Advisor
Butts, Tom
3
3
3
$89.40
Scientist IV-1
Feld Team Leader/Senior Inspector
Castell, Michael
214
8
198
8
$76.88
Scientist III -1
Inspector
Hoskinson, Jack
20
2
18
$71.75
Field Tech IV - 1
Inspector
Jaramillo, Philip
11
2
9
$71.75
Field Tech IV - 1
Inspector
Levy, William
11
2
9
$76.88
GIS Specialist
GIS/CADD
Jessen, Chris
2
2
$51.25
Word Processing
Administrative Support
Hernandez Bernadette
2
2
TOTAL HOURS
316
49
252
15
2a)
Total Other Direct Costs: Details below
$765
$765
Fed Ex - Small or Medium Package (each) - Unit Cost: $15
Fed Ex - Large Package (each) - Unit Cost $25
$30
Miscellaneous Feld Supplies (by job) - Unit Cost $100
$100
Per Diem - Lodging (by day) - Unit Cost $50
$100
Hotel (specify rate) - Unit Cost: $80
$50
Field Supplies Hit (per kit) - Unit Cost: $15
$80
$$80
2b)
Markup on Other Direct Costs
10% $77
$77
3)
Subtotal ODCs (Lines 2a 6 2b)
$842
$842
4a)
Subcontractors: Details below
$375
$375
Reservoirs Environmental, Inc. - 2-hour Bulk PLM - Unit Cost $20
Reservoirs Environmental, Inc. - 2-hour Air PCM - Unit Cost: $15
$300
$75
4b)
Markup on Subcontractors
10% $38
$38
5)
Subtotal Subcontractors (Lines 4a 6 4b)
$413
$413
CONFIDENTIAL
900055.7983.010 Cost Esemele - South and East 6.2.11
6) Equipment Usage: Details below
WALSH 4WD Vehicle (per day- plus: see next line) - Unit Cost: $15
Air Sampling Kit (sample media extra) (per day) - Unit Cost: $35
Multi-RAE (per day) - Unit Cost: $75
Calibration Device (per day) - Unit Cost $50
Gilair Pumps (per day) - Unit Cost: $15
Personal Mileage (per mile) - Unit Cost: $0.5
Black and White Copies (per page) - Unit Cost $0.1
Color Copies (per page) - Unit Cost: $1.25
7) Subtotal All Expenses (Lines 3, 5, & 6)
8) Total Labor & Expenses (Lines 1 & 7)
9) Contingency on WALSH Labor
10) Total Labor & Expenses with Contingency
CONFIDENTIAL
$2,808
$2,787
$21
$405
$70
$1,650
$100
$150
$375
$6
$15
$31
$6
$4,062
$4,041
$21
$33.633
$5,573 $26,689
$1,371
10% $2,957
$557 $2.265
$135
$36,590
$6.130 $28.954
$1,506
900055.7983.010 Cost Estimate- South and East 8-2-11