HomeMy WebLinkAboutWORK ORDER - RFP - P1074 CITY ARCHITECTURAL AND ENGINEERING WORK ORDER CONTRACT (4)EXHIBIT "A"
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
Aller-Lingle-Massey Architects
Dated: 8/25/2011
Work Order Number:
Purchase Order Number:
Project Title:
Staley Park
Commencement Date:
W25/2011
Completion Date:
8/25/2012
Maximum Fee: (time &
reimbursable direct costs): $27,800.00
Project Description:
Design Services for Park Restroom and Shelters
Scope of Services: See attached scope
Service Provider agrees to perform the services
identified above and on the attached forms in
accordance with the terms and conditions contained
herein and in the Services Agreement between the
parties. In the event of a conflict between or
ambiguity in the terms of the Services Agreement
and this work order (including the attached forms)
the Services Agreement shall control.
Service Provider �
B:
DateDate:310t'
CC: Purchasing
The attached forms consisting of _ U pages
are hereby accepted and incorporated herein by
this reference, and Notice to Proceed is hereby
given.
City of Fort Collins
Date:
Director of Purchasing and Risk Management
if over $60,000
ALLER • LINGLE • MASSEY
ARCHITECTS
RC. l
August 18, 2011
Kathleen Benedict
City of Fart Collins
Park Planning
P. 0. Box 580
Fort Collins, CO 80522-0580
RE: Proposal for Architectural/Engineering Services
Staley Park
Fort Collins, Colorado
Dear Kathleen:
Alter•Lingle•Massey Architects P.C. is pleased to provide you with this Proposal for
architectural/engineering services for the proposed Registry Ridge Park development in Fort Collins. We
are happy to be a part of your design team for this project. In response to our meetings to date, we
propose the following scope of services and associated fees:
Project Description
Architectural and engineering design, construction document and construction administration services as
itemized below for a proposed neighborhood park development of approximately 10 acres. Proposed park
structures shall include restroom building and shelters. It is assumed that the restroom structure will be
custom -designed using a similar floor plan as the restroom at Water's Way Park. Site development,
including playgrounds, sidewalks, plazas, etc., and utilities excluding electrical will be provided by other
members of the design team.
The project will be managed for Alter -Lingle -Massey Architects P.C. by Shaun Moscrip, AIA, as a consultant
to City of Fort Collins. We propose to provide full A/E services, including structural, mechanical and
electrical engineering to the foundation and/or roof eave line of the building. Civil engineering, landscape
architecture and irrigation design shall be provided by the City of Fort Collins or other members of your
design team. The project will be competitively bid to General Contractors.
Scope of Basic Services
The Scope of Basic Services shall be as follows:
Phase 1:
1. Programming: Program for the restroom will be the same as Waters Way Park program.
2. Schematic Design Phase: Develop up to three (3) alternative preliminary designs and submit
preliminary drawings with floor plans and building elevations for review and approval by the
Owner.
3. Cost Estimating: Prepare an estimate of probable construction cost at the end of Schematic
Design, on a unit cost basis.
4. Meetings: Representation at the following meetings:
a. Schematic Design client meetings as necessary.
b. Client meetings for review of Construction Documents submittals.
5. Deliverables:
Review set(s) of Phase 1 Schematic Design submittal, 24" x 36" or PDF
Conceptual level cost estimate
712 WHALERS WAY • BLDG. B, SUITE 100 • FORT COLLINS • COLORADO • 80525
(970) 223-1820 phone • (970) 223-1833 fa • office®alter-lingle-maswy.com • ww ..alter-Iingle-rnmseycom
Proposal for Architectural/Engineering Services - 2
Phase 2:
1. Construction Documents Phase: Prepare construction drawings and the appropriate sections of
Div. 3-16 technical specifications as required for competitively bidding the project to Contractors,
including architectural, structural, mechanical and electrical engineering for the building, to be
incorporated into the project drawings and specification manual prepared by the City of Fort
Collins. Extent of drawings is estimated as follows:
Floor Plans
Reflected Ceiling Plans
Roof Plans and Details
Building Elevations
Building Sections
Wall Sections and Details
Room Finish Schedules
Door and Window Schedules, Door Types and Details
Interior Elevations
Foundation Plans and Details
Roof Framing Plans and Details
Plumbing Plans and Details
HVAC Mechanical Plans and Details
Mechanical Schedules and Details
Electrical Power Plans and Details
Electrical Lighting Plans and Schedules
Electrical One -line Diagram and Schedules
2. Coordination: Coordination with the Owner, irrigation and other Consultants as necessary.
3. Deliverables:
Review set(s) of Phase 2 Construction Documents submittal, 24" x 36" or PDF
Final set(s) of Construction Documents, released for bidding and construction, 24" x 36" or PDF
Phase 3:
1. Bidding/Negotiation Phase: Assistance to the City of Fort Collins to acquire and review Contractor
bids, including attendance at Pre -Bid Conference, responding to Contractor questions and issuing
addenda, and assistance in reviewing bids.
2. Construction Administration Phase: Perform field observations of the work in progress during
construction with written reports to the Owner, attendance at Pre -Construction Conference,
attend regular site meetings with the Contractor and Owner's representative (Consultants on an as -
needed basis), review of shop drawings and submittals, issuance of Architect's supplemental
instructions (ASIs) and responses to Contractor's requests for information (RFIs), review of change
orders, review of Contractor's pay requests, final "punch list" inspection and assistance with
project close-out. For purposes of this Proposal, the number of field visits during the Construction
Administration phase shall be limited to four (4) trips. For purposes of this Proposal, field
observations by our Consultants are proposed as follows:
a. Structural Engineering: 2 site visits.
b. Mechanical Engineering: 2 site visits.
C. Electrical Engineering: 2 site visits.
3. Record Documents: Preparation of record documents upon the completion of construction of this
project.
All construction documents prepared for this project shall be generated with our in-house Computer -Aided
Design and Drafting (CAD) systems, using AutoCAD Version 2012 and/or Revit 2012 software.
Assumptions
1. All site planning, use and design approvals, and other required entitlements such as plats, right-of-
way and easement dedications, are in place through the City of Fort Collins.
2. The site is ready for development, with all required off -site improvements in place, including any
required street and roadway improvements adjacent the site, utility extensions and stub -outs onto
or adjacent to the site, and any off -site stormwater discharge or infrastructure improvements.
Alter -Lingle -Massey Architects P.C.
Proposal for Archltectural/Engineering Services - 3
3. The foundation and structural systems anticipated for this project assume concrete slab -on -grade
construction. Post -tensioned concrete slabs or other structural ground level floor construction can
be provided as Additional Services, if required by soils conditions.
4. The project will not be designed or pursue LEED certification.
5. Document preparation and applications for building permits or other construction permit
applications shall be provided by the Owner and/or Contractor.
6. Printing and copying of bid documents, and distribution to Contractors for bidding will be provided
by the Owner-, we will furnish plots or PDFs of our original drawings and originals of the appropriate
technical specification sections. The Owner will provide sets of construction documents for
Alter •Lingle -Massey Architects P.C. and our subconsultants.
Work Not Included
1. Planning and other related architectural services for taking the project through the development or
other site plan approval process with the City of Fort Collins.
2. Submittal and compliance with development permitting requirements of outside agencies,
including Environmental Protection Agency (EPA), Colorado Department of Transportation (CDOT),
Colorado Division of Wildlife, Division of Natural Resources, etc., as may be applicable to the site.
3. Documentation, certification and notice requirements related to subsurface mineral estate rights
that may exist beneath the surface rights held by the Owner.
4. Landscape architecture and civil design and engineering services.
5. Structural engineering for site structures other than buildings and shelters, such as wet wells,
bridges, retaining walls or structured stormwater detention facilities. These are not anticipated at
this time.
6. Design and preparation of construction documents for other park structures not identified in the
Project Description above.
7. LEED Consulting during design and construction, including energy modeling, daylighting analysis,
coordination with the selected Contractor, and documentation and submittal services for the LEED
certification process.
B. Preparation of Divisions 0, 1 and 2 specifications, including "front end" specifications.
9. Perspectives, renderings, models or other presentation documents. See Additional Services.
10. Assistance to the Owner in selecting or prequalifying Contractors or Construction Managers.
11. Document preparation and applications for building permits or other construction permit
applications. This will be done by the Contractor.
12. Printing and copying of bid documents, and distribution to Contractors for bidding. This will be
provided by the Owner; we will furnish plots of our original drawings and originals of the
appropriate technical specification sections.
13. Site visits or field observations beyond those identified in the Scope of Basic Services.
14. Project or building inspection services as required by Chapter 17 of the International Building code
(IBC), current edition.
15. Special design of mechanical/electrical systems such as heat pump systems, solar/photovoltaic
systems. It is assumed the installation costs and payback period for these systems is not practical.
16. Energy Payback Analysis.
Owner- or Prime Consultant -Provided Information
1. Site survey, provided by a licensed, professional surveyor, indicating topography, boundaries,
easements, rights -of -way, off -site and on -site utilities, existing improvements, and trees and
vegetation, provided in CAD disk format (AutoCAD Version 2008).
2. Soils Investigation Report and other appropriate information for foundation design.
3. Design standards or guidelines for the City of Fort Collins, if applicable.
4. Asbestos or other hazardous material testing and abatement.
5. Copies of all applicable standard documents, forms, specifications or other information from the
City of Fort Collins to be a part of the bidding documents.
6. Copies of all standard specifications for materials, equipment and fixtures to be incorporated into
the project design used by the City of Fort Collins, including material cut sheets and sources for
sales and technical representatives, if available.
7. Coordination with telephone, electric, natural gas, propane or other independent utility and/or
building services providers for infrastructi, a and equipment installation.
Alter-Ungle•Massey Architects P.C.
Proposal for Architectural/Engineering Services - 4
8. Base plan for improvements developed by the City of Fort Collins in AutoCAD Version 2008 format.
9. Coordination drawings and other information from the City of Fort Collins and other consultants
during design and construction document phases.
10. Title block from the City of Fort Collins in AutoCAD Version 2008 format.
11. Owner shall provide, or contract separately for, project or building inspections required by Chapter
17 of the IBC. These services are expressly excluded from this Proposal.
Consultants
Alter -Lingle -Massey Architects P.C. proposes the following consultants for this project:
Structural Engineering
Weeks and Associates, Inc.
Gary Weeks, P.E.
4700 S. College Avenue, Suite 1
Fort Collins, CO 80525
(970)225-2422
Mechanical Engineering
Abrahamson Engineering
Roger Abrahamson, P.E.
3101 Kintzley Court, Unit D
LaPorte, CO 80535
(970)221-2569
Electrical Engineering
ESC engineering, Inc.
Kate Hodgson
3540 JFK Parkway
Fort Collins, CO 80525
(970)224-9100
The City of Fort Collins will assemble all other consultants or designers required for this project, including
civil engineering, landscape architecture and site irrigation.
Fees
Ailer•Lingle•Massey Architects P.C. and our team of Consultants propose to complete the Scope of Basic
Services through the Construction Administration phase for an hourly not -to -exceed design fee of
$27,200.00, excluding reimbursable expenses. A breakdown of this fee by design discipline is as follows:
Architectural:
$15,500.00
Structural Engineering:
$ 4,800.00
Mechanical Engineering:
$ 4,700.00
Electrical Engineering:
$ 2,200.00
Reimbursable Expenses:
5 600.00
TOTAL:
$27,800.00
Reimbursable Expenses
In addition to Basic Services, the following expenses in connection with this project shall be reimbursable
at 1.1 x direct cost:
1. Printing/scanning
2. Copying
3. Long distance telephone/FAX
4. Mileage and travel expenses
5. Postage
6. Federal Express/Express Mail and other delivery services
7. Photography or other miscellaneous expenses
8. Plotting of CAD -generated drawings
For purposes of this Proposal, Reimbursable Expenses are estimated not to exceed $600.00, which does not
include printing and copying for bid/construction sets.
Additional Services
If the Owner requests additional services beyond those set forth in this Proposal, or for additional services
as described elsewhere in this Proposal, such services shalt be agreed to in writing between the City of Fort
Alter -Lingle -Massey Architects P.C.
Proposal for Architectural/Engineering Services - 5
Collins and the Architect and the fees adjusted accordingly per the following, current hourly rates, subject
to annual adjustment:
Aller•Lingle•Massey Architects P.C.
Consulting:
$135/hour
Principal:
$130/hour
Associate Architect:
$100/hour
Sr. Project Manager/Architect:
$95/hour
Project Architect:
$88/hour
LEED AP Consulting:
$85/hour
Interior Designer:
$75/hour
Architecturallntern/CAD Technician 2:
$70/hour
Architectural Intern/CAD Technician 1:
$60/hour
Clerical/Administrative:
$50/hour
Weeks and Associates Inc.
Principal Engineer:
$100/hour
Staff Engineer:
$70-80/hour
Administrative Staff:
$35/hour
Abrahamson Engineering Inc.
Principal:
$100/hour
Professional Engineer:
$85/hour
Engineer/Senior Designer:
$75/hour
Draftsperson:
$48/hour
Clerical:
$48/hour
ESC engineering Inc.
Principal Engineer:
$94/hour
Project Manager:
$92/hour
Project Engineer:
$88/hour
Senior Electrical Designer:
$72/hour
Designer 1:
$64/hour
CAD Technician 1:
$60/hour
Secretarial:
$36/hour
For purposes of this Proposal the following will be considered Additional Services:
1. Development of multiple bid packages, or otherwise staggering the release of documents to
Contractors.
2. Fast -tracked construction schedules, or other acceleration of the construction schedule requiring
the release of construction documents to Contractors prior to the completion of all documents.
3. For purposes of this Proposal, it is assumed that construction of all site structures will occur
simultaneously, so that Construction Administration phase services including field observations will
be performed concurrently. Additional field observations or other services required by staggering
of construction sequencing or other delays beyond the control of the Architect shall be considered
Additional Services.
Schedule
Scope of Basic Services for this project will be performed as negotiated with the City of Fort Collins.
1. Schematic Design Phase: 4 weeks.
2. Construction Documents Phase: 8 weeks, proposed completion as negotiated with City of Fort
Collins schedule.
3. Bidding/Negotiation Phase: As required by the proposed bidding/construction schedule.
4. Construction Administration Phase: As required by the proposed bidding/construction schedule.
For purposes of this Proposal, these phases of the Basic Services will allow for Owner review and approval
periods of one (1) week between each design phase of work.
Alter -Lingle -Massey Archltects P.C.
Proposal for Architectural/Engineering Services - 6
Budget
Alter. Lingle -Massey Architects P.C. understands that no firm budget has been established for this project,
however construction costs of $250/sq. ft. are anticipated, with approximately 1,200 sq. ft. and a building
budget of $300,000, exclusive of land, design and engineering fees, City of Fort Collins building permit and
development fees and other soft development costs.
The Owner and/or preselected Contractor shall maintain an adequate contingency in the project budget to
cover unforeseen site conditions, changes in the work, etc. Refer to Standard Contractual Terms and
Conditions.
Standard Contract Terms and Conditions
All terms of this Proposal shall be in accordance with our 2007 master contract with the City of Fort Collins.
Alter•Lingle•Massey Architects P.C. is dedicated to providing quality professional service and creative
design solutions. We look forward to the opportunity of working with you on Staley Park. Give us a call if
you have any questions concerning this Proposal. If acceptable to you, please draft the appropriate work
order for signatures. We will schedule our work to begin upon receipt of the signed work order.
This Proposal is valid for a period of 60 days. Thank you for your interest and consideration
Sincerely,
ALLER•LINGLE•MASSEY ARCHITECTS P.C.
�'
Shaun J. Moscrip, AIA
SJM:IIs
Alter -Lingle -Massey Architects P.C.