Change Order Form
PROJECT TITLE: 2011 KFCGIStreet Maintenance Program, A6Phalt Owday PrQJad
PROJECT NUMBER: 902120 ( Bid 07222)
CONTRACTOR: Lafarge Northem (PO 99112453)
CHANGE ORDER NUMBER: 4
n preparing change o ere show In order as separate numbered paragraphs
n
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change In Contract time.
1. See attached document Change Order No. 4
3. The contract cost W11 increase. hY $89,256.60
4. There is no change In contract time. ., .
.
ORIGINAL CONTRACT COST
$3,254,586.75
TOTAL APPROVED CHANGE ORDERS
$342,333.11
TOTAL PENDING CHANGE ORDERS
$D•00
TOTAL THIS CHANGE ORDER
$891260.60
TOTAL % THIS CHANGE ORDER
274%
TOTAL C.O. % OF ORIGINAL CONTRACT
73.269e
ADJUSTED CONTRACT COST
$3,688,176.46
ACCEPTED BY: / / ' V DATE is 41
APPROVED BY: 4:�: — /��✓�' - DATE e—W
moment Management Manager- Streeta
ec C011lmclm
Pmhasing
PMIW Fft /
APPROVER BY:
Dire V
of Purchasing and Risk Mana a nt
Change Order No: 4
Date: 8/9/2011
1 Reason for Change:
A. Additional Traffic control for change in contractual scope of work for Huntington Hills project
Description Of Change:
2 a. Changed from a patching orgy In Huntington Hills area to a complete overlay
Change In Contract Amount:
3 Item
a.
b.
C.
d
e.
f.
9
h.
210.01
Adjuv Valve Box
210.03
Adjust Valve Box -Tyler 6860 Series, Item R 69, Screw Type
Adjustable Riser
210.09
Adjust Standard Manhole S24"
210.12
Adjust Manhole with Ring w/Locks 524" dia, <_ 3" height
403.05
HMA - Grading S. 64-22 Binder (20r90 RAP)
420.01
Gcotextile Paving Fabric
630.00
lAdditional Construction Zone Traffic Control
Lafar a mark-up on additional QTC traffic control costs
TOTAL CHANGE IN CONTRACT AMOUNT
Change In Contract Time
4 a. No Change
TOTAL CHANGE IN CONTRACT TIME
Oty Unit Unit Cast Tntal Cn
14
Fach
$ 141.95
$ 1,987.30
5.00
Each
S79.35
$396.75
10.00
Each
$325.00
$3,250.00
12.00
Each
S160.55
$1,926.60
1411.47
TON
$49.30
$69,585.47
6682.58
SY
$1.25
$8,353.23
1.00
EACH
1 S5.471.00
S5,471.00
5.00%
Mark-up
1 $5.471.00
$273.5.
0 1DAYS
TOTAL 1 $09,256.60
I
CjyOf gg
1s
F®Aggg++t Collins
Planning, Development & Transportation
Streets
S1r®ef5
P.O. Box 58)
Pon Corns. 00 805a 0563
970.221.6616
970 221.6270, lax
Change Order Form
PROJECT TrrLE 2011 KFCGISVW Maintenance Program, Asphalt Overlay Project
PROJECT NUMBER: 902120 ( Bid 87222)
CONTRACTOR: Lafarge Northern (PO 49112453)
CHANGE ORDER NUMBER: 5
1. -Reason for change. 2. Description of change.
3. Change In contract cost. 4. Change in contract time.
1. See attached document Change Order No. 6
3. The contract cost will Increase by $16.086.14
4. There Is no charge in contract time.
ORIGINAL CONTRACT COST
$3254,586.75
TOTAL APPROVED CHANGE ORDERS
- - ,. $342,333A I
TOTAL PENDING CHANGE ORDERS
$89.256.60
TOTAL THIS CHANGE ORDER
$15,086.14
TOTAL % OF THIS CHANGE ORDER
0.46%
TOTAL C.O. % OF ORIGINAL CONTRACT
1172%
ADJUSTED CONTRACT COST
$3,701,262.60
ACCEPTED BY: ..DATE
ConVa epresentative �J^
APPROVED BY: DATE:
cc C Unctor
Purim 9
Pmlecn FRO
Change Order No: 5
Date: 8/9/2011
1 Reason For Change:
a. Need for additional Variable message Boards and flaggers, along with other devices to Increase
awareness and safety on project
2 Description Of Change:
a. Due to high traffic volume on Horseiooth Rd, and at the request of Traffic Operations as well as Streets
City Representative, additional traffic control dtrvices were needed.
3 Change In Contract Amount:
Item
630.00 Additional Construction Zone Traffic Control
Lafarge 5% mark-up on sub conuwtots work
TOTAL CHANGE IN CONTRACT AMOUNT
4 Change In Contract Times
a. No Change
TOTAL CHANGE IN CONTRACT TIME
Qly Unit Unit Cost Total Crest
Z' 1
Each
$ 14,367.75
$ 14,367.75
Ipercent
1 $14,367.7.5 1$
718.39
TOTAL $15,086.14
0
CitOf
Faryt C®[Ilns
825 W r planning, Development & Transportation
ts
65WON 5lfeel
Bl(eets
PA Bat 580
Forl CUINR CO 80522 0580
970221.6616
970.221.5270-lax
Change Order Form
PROJECT TITLE: 2011 KFCGISbvet MaInIw nce Program, Asphalt OVeday Project
PROJECT NUMBER: 902120 ( Bid 67222)
CONTRACTOR: Lafarge Northam (PO 09112463)
CHANGE ORDER NUMBER: 6
n —Preparingchange orclers show in order as separate numbered paragr the tolloveng
1. Reason for change. 2. Description of change.
3. Change in contract cost 4. Change In contract gme.
1. See attached document Change Order No. 6
3. The contract cost will Increase by $25.009.72
4. There is no change in contract gme.
ORH31MAL CONTRACT COST
$3,254,586.75
TOTAL APPROVED CHANGE ORDERS
$342,383.11
TOTAL PENDING CHANGE ORDERS
$104.342.74
TOTAL THIS CHANGE ORDER
$25•009•72
TOTAL % OF THIS CHANGE ORDER
OV71%
. TOTAL C.O. % OF ORIGINAL CONTRACT
14.49%
ADJUSTED CONTRACT COST
$3,726,272.32
ACCEPTED BY: L. ! �" / DATE:
APPROVED BY:
x Conuada
Pundwing
Pfolerl Fie
r //
Change Order No: 6
Date:
1 Rawson For Change:
a.
b.
2 Description Of Change:
8/9/2011
Additional area added to origional contract
Negotiated Price for hand patching
a. Harmony crossing was onglanally a Slurry area where streets typically pedroms the prep work. With limited resources
streets had to contract this area out to Lalarge and pay additional tragic control accorclingly
3 Change In Contract Amount:
from
a. 403.07 HMA - Hand Patching - Remove &
Re lace
b. 630.00 lConsiniction Zone Traffic Control
c. lafarge 5% mark-up on sub contractors work
TOTAL CHANGE IN CONTRACT AMOUNT
4 Change In Contract Time No Change
a.
TOTAL CHANGE IN CONTRACT TIME
0
Qty Unit Unit Cost Total Cost
208
TON
$ 119.03
$24.758.24
I.00
10
Each
S239.50
$239.50
5
Percent
$219.30
$11.98
TOTAL 1 $25,009.72
CAY of
F®@�9
Planning, Development & Transportation
atraam
Hob
[ t Coffins
625 Ninh StMet
1 $treats
80
P.O. BOX 560
Fnn.Cahms. CO.B_05220560
970.221.6416
970.221.6270- fax
Change Order Form
PROJECT TITLE: 2011 KFCG/Street Maintenance Program, Asphalt Overlay Projed
PROJECT NUMBER: 902120 ( Bid 07222)
CONTRACTOR: Lafarge Northam (PO #9112463)
CHANGE ORDER NUMBER: 7 - ... ` . .. .. . .
-1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change in contract time.
1. See attached document Change Order No. 7
3. The contract cost will decrease by ($2219.41)
4. There is no change In contract lime.
ORIGINAL CONTRACT COST
$3,254,586.75
TOTAL APPROVED CHANGE ORDERS
$342,333.11
TOTAL PENDING CHANGE ORDERS
$129,352.46
TOTALTHIS CHANGE ORDER
($2,219.41)
TOTAL % OF THIS CHANGE ORDER
407%
TOTAL C.O. % ORIGINAL CONTRACT
14.42%
ADJUSTED CONTRACT COST
$3,724,052.91
ACCEPTED HY- DATE:
ConlraU Re resentative
APPROVED BY: DATE:
F409ment Management Kunager- Streets
a: Contree[w
Purchasing
Pmad Fife
Change Order No: 7
Date: 8192011
1 Reason For Change:
a. Removed Portner Rd from origioml contract quantities
2 Description Of Change:
a. Need to receive a credit for OTC traffic control Lump Sum cos, eppmx. 5.23216% of total work to be performed
3 Change In Contract Amount:
Item
a. 1 630.00 lCommuciton Zone Traffic Control Credit (Pmrier td.)
TOTAL CHANGE IN CONTRACT AMOUNT
0
Change In Contract Time No Change
4 a.
TOTAL CHANGE IN CONTRACT TIME 0
Qty Unit Unit Cast Total Girt
0.05232160 1 Each I (542.418.54) 1 ($2.219.41)
TOTAL 1 ($2.219.41)