HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9114782'P-)ecle�. A101I-,4
,
EXHIBIT "A"
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
INTERWEST CONSULTING GROUP
DATED: July 15, 2008
Work Order Number:
Purchase Order Number:
Project Title: SE Community Park Bridge Profile Plans
Commencement Date: 7-22-11
Completion Date: I-1-12
Maximum Fee: (time and reimbursable direct costs): $34,300
Project Description: _ See Attached
Scope of Services: See Description
Acceptance
Professional agrees to perform the services
identified above and on the attached forms in
accordance with the terms and conditions
contained herein and in the Professional
Services Agreement between the parties. In the
event of a conflict between or ambiguity in the
terms of the Professional Services Agreement
and this work order (including the attached
forms) the Professional Services Agreement
shall control.
Professional
M-L�-o al(/L�
7-22-11
0
1-740,ro6
P LLUI( �
The attached forms consisting of _ U pages
are hereby accepted and incorporated herein, by
this reference, and Notice to Proceed is hereby
given.
City of Fort Collins
By:
James B.O'Neill II, CPPO, FNIGP
Director of Purchasing and Risk Management
(over $30,000.00)
Date:
vvorK uroer rvumoer:
Purchase Order Number:
Project Title: SE Community Park Bridge Profile Plans v J
Commencement Date: 7-22-11 D�
Completion Date: 1 1 12
v� 6
F LLuu �i v" p
Maximum Fee: (time and reimbursable direct costs): $34,300 �fy
Project Description: _ See Attached
Scope of Services: See Description
Acceptance W-
Professional agrees to perform the services
identified above and on the attached forms in
accordance with the terms and conditions
contained herein and in the Professional
Services Agreement between the parties. In the
event of a conflict between or ambiguity in the
terms of the Professional Services Agreement
and this work order (including the attached
forms) the Professional Services Agreement
shall control.
Professional n
AA - A .
User
The attached forms consisting of _ (, pages
are hereby accepted and incorporated herein, by
this reference, and Notice to Proceed is hereby
given.
City of Fort Collins
By:
INTEI�Mur cons U Lr ING caouv
July 22, 2011
Mr. Craig Foreman
City of Fort Collins Park Planning and Development
PO Box 580
Fort Collins, CO 80522-0580
Fossil Creek Trail - Trilby Road Underpass
Project Description and Scope of Services
Dear Craig -
Attached is the project scope and description that we discussed:
Description
Interwest will provide engineering services necessary to create plans for a trail connections on the north side of
Trilby Road between Lemay and the Power Trail as well as the plans for a Tx14' underpass of Trilby on the west
side of Fossil Creek.
Scope of Services
Topographic and Utility Survey — King Surveyors will provide a topographic survey of the attached area on
City of Fort Collins Vertical Datum and will show platted lots and easements on the base survey. Additionally,
private utility locates will be provided in the vicinity of the box culvert.
Estimated Fee: $5,000
Easements — King Surveyors will provide trail and temporary construction easements as needed for the project
for a fee of $400 per easement. At this time, we anticipated 5 easements for the project.
Estimated Fee: $2,000
Trail Plan and Profile — Interwest will prepare a plan and profile for approximately 0.5 miles of at grade trail.
Estimated Fee: $8,000
Box Culvert Plan and Profile — Interwest will prepare a plan and profile for the proposed underpass. At this
time, it is assumed Biala C:t)lll' M Standard Box Culvert and Wing Walls will be used (no structural engineering
will be provided. No lighting or pumping is currently anticipated.
Estimated Fee: $7,500
Utility Coordination and Potholes — Interwest will meet with affected utility companies and work to determine
the required relocations throughout the design process. The fee below includes meeting and coordination time as
well as 10 utility potholes by Colorado Boring Company and one day of Traffic Control.
Estimated Fee: $6,000
Floodplain process assistance — Interwest will assist the City with the Floodplain Use Permit required for the
project. It is our understanding that the area will not need HEC modeling, but an analysis of the cut and fill
proposed below the Fossil Creek "pool" elevation will be required. Additionally, the work will be in the erosion
buffer and we will work to determine a way to keep the crossing higher than some minor, flood event.
Estimated Fee: $3,500
1218 W. ASH, STE. C, WINDSOR, COLORADO 80550
TEL. 970.674.3300— FAX 970.674.3303
SWMP — Interwest will prepare an erosion control plan and a stormwater management plan for the initial
application to the State for the project.
Estimated Fee .• $2,000
Reimbursables—for prints, mileage, and deliveries, etc...
Estimated Fee: $300
Total Estimated Fee: $34,3W
Assumptions-
1. No changes to the through lanes or grade of Trilby Road are included.
2. Specifications, quantities, and contract documents provided by others.
3. Environmental, structural and geotcchnical engineering provided by others.
4. No CA or CM work (including construction or as built surveying) is included.
Schedule
Interwest will begin work on the project immediately. Depending on the cooperation of the affected utility
companies, the project can be completed prim to 2012.
Please call on, a[ 970-631-2671 if you have any questions or need any additional information
Thanks,
M,,P-PJ twvv,
Michael Oberlander, PE
PROTECT SURVEY ARF,A