Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 7089 WATER WW AND SW UTILITIES INFRASTRUCTURE DESIGN AND CONSTRUCTION SERVICES (6)EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND CONNELL RESOURCES, INC. DATED: FEBRUARY 16, 2010 Work Order Number: SCP-CC-07-31-2011 Purchase Order Number: 4II u Project Title: Choice Center Sanitary Sewer Utilitv Improvements Commencement Date: July 31, 2011 Completion Date: December 31. 2011 Maximum Fee: (time and reimbursable direct costs): $11,690.00 Project Description: Scope of Services: see Connell Resources, Inc. Work Plan Attached Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of Exhibit B, consisting of one (1) page are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Profession By: �- Date: 7 2� City of Fort Collins Submitted By: u _ Projec nager Date:_ Reviewed by: Chief Engineer .> Date: Approved by: < .-- Water Engineering & Field Services Operations Manager Date: 7 r� EXHIBIT B Choice Center - CONNELL RESOURCES, INC. WORK PLAN te0or GI a5ubcrosmmm P M r ConstmcWn r Cnnslm Mane IrMxhol Dan G. cam, / Curtis R JOM W. INVESTIGATION AND PRELIMINARY DESIGN PHASE SERVICES Meetin s EHeS Pm11ue Cmw cups Cgnneg ssa TASK TOTAL TOTAL Task 1 1.1 1.2 L3 Kkkctf Meeen 1) BIAY Twn MaelLIW ) W1ghb.rtwad Mamhlg (rlar r.glied N/INf pMse alrm wwkJ she ld. g. (2) 1 4 4 9 1 4 q 9 2 2 q 0 0 $171 $898 80 $898 Task 1 wmmal: $1,967 La sub tel: Task 2 Field Investigation 2.1 Me Loralf, 2 1 4 7 2 10 1 13 0 0 0 15 5 20 500 500 $342 $4002 1,957 ask 2 sumaml: 6,301 23 Po llelldas as MW .uMi. earavall.n end arasbga la n.ed.d) Submml: Task 3 PreliminaryDesi n 3.1 . and Ca Wd.mtbna 2 1 3 1 3 I 1 $365 $87 $513 3.15 M.Ilad 6MMl (P4. M,mrlalw,nnol,f) m S.v "n s Gelno 3.3 3.5 W Wamr Maln.0 s rlmlancn 3.e m abml bbm I M.nh.bs I WOV I Cunn.ctbn b Wall sulfmMl: S iflcalions 6 4 1 Q 0 0 $0 S0 Task 3 fubtdaC $985 Task 4 4.1 Atw.uf.m (Payment submmL 0 5 5 10 2 Q 1 1 9 1 1 2 0 0 0 0 0 0rusk 0 this may be $0 $0 4 suetoml: $435 $626 asksS WMk $368 $Q $t A61 Tasks Preliminary Drawings 51 Esu.0 w Prkbg aPnikninery Phn.s eon. 5.15 FJem MW Pr g of Mml FUn. Suatoml: Task6 Administration 6.1 uamn 6.15 P—he fSWMPI Coneau. OewamAna APEN) suhdaml: 2 0 2 2 2 D 900 900 $1,008 askasudaW: $1,396 leve/a effort 2ertabor ca hours: (Drat costs r labor cat sub -consult B expenses: stall -weeks: 34 $ 2 858 0,85 27 $ 2,268 0.88 8 $ 856 0.20 2 $ 108 0.05 20 S 4100 test $ 1 400 Total Man -weeks: 97 Total Costs» 2.28 «total Mlanhouts 1 E 11 690 Pegs 1 3 D c a Q C � 9 mm p 3 S v o y S FL m � O y — p n O �. o n m 0 9 n o c. m e $ o m m � o � 3 (a N ' F � C � m (D 9 0 7, 0 0 0 0 0 N A qW A d O fa o = c N 3 C N O a o m 0 ovv� mmmm °fDe vvZ m G a o