Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 7089 WATER WW AND SW UTILITIES INFRASTRUCTURE DESIGN AND CONSTRUCTION SERVICES (7)EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND CONNELL RESOURCES, INC. DATED: FEBRUARY 16, 2010 Work Order Number: SCP-CRI-BRT-07-31-2011 Purchase Order Number. lltL Project Title: Utilities BRT Water and Sewer Improvements Proiect Commencement Date: July 31, 2011 Completion Date: December 31, 2011 Maximum Fee: (time and reimbursable direct costs): $34,544.00 Project Description: Preliminary and final desiqn of the Worade and me Scope of Services: see Connell Resources Inc. Work Plan Attached Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of Exhibit B, consisting of one (1) page are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Professional: By: Date: City of Fort Collins Submitted : f ��: (+ Date: 7 -Z j— (( 1 Reviewed by: Chief Engineer Date: Approved by: v Water Engineering $ Field Services . O9ratiM rs anager Date: /-t EXHIBIT B BRT - CONNELL RESOURCES, INC. WORK PLAN labor Ca a3ubcrosuaaM Md..*01 Rite/Mur :-".. •� _;'. 'M Dan G. w..'s 3eT.'n Lauuucuon9 C6ra F. / Gunk R iadt'.. Casslrtcem Mara JO W. ,'r S107 ,. EHSS .. ,., i50`>, .', Polhae Craw LaxeO -..:_L3a5- - eructs TASK TOTAL TOTAL INVESTIGATION AND PRELIMINARY DESIGN PHASE SERVICES Task 1 Meetings t.t tz 1.3 1.4 Task gcl:cn uwEno tl 8t Tnm Mwengs s) Nelpitborlrooe Mocun(W mm-w16,ft aheaa of Me world sus mmengs(3) submm: Investigation 3 20 9 32 3 12 1 9 24 3 4 3 10 0 0 0 $834 $3176 ,$0 $1,860 ask t sumetal: 5,870 zt 2.3 2.5 Task 3 W Iftllhy N m ftd est anaaoe Test tale sacavalmn ene of ocrosa Itl natleej submtsl: Preliminary Dazi n 2 1 4 7 2 30 0 32 0 0 0 30 30 60 1 000 1,0 0 $342 $8757 $7,498 ask z subtotal: $16.597 3A 3.15 3.3 3.5 3.6 Opfion,uM ConeWd .e Mem aMetsrlel s (PIPO Matrl.IeUanboles) o mwear Mam a Casing6 mWamr Main. 1—,.- nenilKtl Proaob m Smml Inlets l flenholas/WOV Keene nm man S iflptions subtom: 8 2 6 8 1 6 4 19 8 6 0 p O $2,224 $258 $i 026 $ $0 Task 3 subual: ,366 Task 4 4.1 Yaaaurarrwnt l Prymant submtet: 2 2 0 O O O 0 $174 askesubtwe 174 Task 5 PreliminaryDrawin s 5.1 5A5 Eetlmatlny PKcmg of Prel"May PlansB OpUons Ese wgl Prklee of Final Plane submtsl: 25 25 1 50 4 4 4 4 0 0 0 $2,511 $2,939 ask 5aubloml: 5,450 Tazk 8 Administration et 6.15 drirYsralkn Pmnifa (SWMP/Consbudbn Oewammgl "EN) submtsl: 4 1 5 1 0 4 4 0 6 6 0 900 0 $776 $1,311 Tnk6saueet $2,087 level of effort perfabo categoty fhours: ! mfal casts rM[tar ca , subconsurc 6 a rases: sfa/f-streaks: 118 ji $ 10 268 2.95 83 8 972 2.081 26 $ 2,782 0.651 6 $ 324 0.15 60 $ 12 300 1.50 S 1 900 Total Man -weeks: 1 293 Total CosW> 7.33 «rcUJldanho rs $ 3q 5q4 Page 1 Vendor: Connell Resources Inc. /094ys Reauisition Form Today's Date: Ship To: Date Required: Special Instructions: July 31, 2011 Requisition No.: Date Entered: Date Approved: Date Denied: 05 4 20d town Item# Quantity Unit Description Unit Price Total Charge Numbers 1 1 Preliminary and final design of the Utilities sanitary $17,255.50 $17,255.50 5026430010.521210.3 sewer and water line crossings of the downtown $17.255.50 $17,255.50 5036430010.521210.3 Engineedng BRT Project Total $34.511.00 Rea d By: f/ -C '2S v wwox�mr,m.