Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - P1074 CITY ARCHITECTURAL AND ENGINEERING WORK ORDER CONTRACT (3)E URBIT'A' WORIS ORDER FORM PURSUANTTO AN AGREEMFNT BETWEEN THE CITY OF FORT COLLINS C ale/ 1� I DATED: Work Order Purchase Ord Project Title: Cotrunencemi Completion D Maomum Fes Project Descri Scope of Services: Service Provider agrees to perform the services identified above and on the attached Forms in accordance with the terms and conditions contained herein and in the Srrvires Agreement between the parties. In the event of a conflict betweea or ambiguity in the terms of the Services Agreement and [his work order (including the attached forms) the Services Agreement shall control. City of Fort Collins By: Date: ROct 31� ` M1 Director of Purchasing and m Risk Manageent Service rovlder 14\`Vn�\ Over$30,000 By:_ Date:�� CC: Purchashig The attached forms consisting of _ U pages arc hereby accepted arul incorporated heroin by dsis reference, and Notice to Proceed is hereby gima. 412001 ALLER• LINGLE• MASSEY ARCHITECTS P.O.-b'':iri ' June 3, 2011 Ms. Eileen Scholl City of Fort Collins Parks Division P. 0. Box 580 Fort Collins, CO 80522-0580 RE: Proposal for Architectural/Engineering Services Rolland Moore Park Tennis Restroom Renovation Fort Collins, Colorado Dear Eileen: Alter •Lingte•Massey Architects P.C. is pleased to provide you with this Proposal for architectural/ engineering services for the Rolland Moore Park Restroom Renovation in Fort Collins. We are happy to be considered for this project. In response to our meeting on May 25, 2011, we propose the following scope of services and associated fees: Project Description Architectural and engineering design, construction document and construction administration services as itemized below for an addition to the south side, heating and exterior insulation with CMU veneer and accessibility upgrades to the existing tennis restroom. All existing site development, including utilities are to remain. The project will be managed for Alter -Lingle -Massey Architects P.C. by Shaun Moscrip, AIA, as a consultant to City of Fort Collins. We propose to provide A/E services, including structural, mechanical and electrical engineering. The project will be competitively bid to General Contractors. Scope of Basic Services The Scope of Basic Services shall be as follows: 1. Field Measurements and Documentation: Limited field measurements of the existing structure and preparation of record drawings of as -built conditions as required to proceed into the design phases of the project. 2. Code Analysis: Verify with the City of Fort Collins in developing a strategy to best meet appropriate code review. 3. Cost Estimate: Prepare an estimate of probable construction cost at the end of Schematic Design. 4. Construction Documents Phase: Prepare construction drawings with specifications on the drawings as required for negotiating the project to Contractors, including architectural, mechanical and electrical engineering. Extent of drawings is estimated as follows: Floor Plans Reflected Ceiling Plans Building Sections Wall Sections and Details Room Finish Schedules Interior Elevations Foundation Plan Roof Framing Plan 712 WHALERS WAY • BLDG. 6, SUITE 100 • FORT COLLINS • COLORADO • 80525 (970) 223-1820 phone • (970) 223-1833 fax • ofrceOaller-lingle-masseycom • www.aller-Tingle-massey.com IN Proposal for Architectural/Engineering Services - 2 HVAC Mechanical Plans and Details Mechanical Schedules and Details Electrical Power Plans and Details Electrical Lighting Plans and Schedules Electrical One -line Diagram and Schedules 5. Deliverables: Review set(s) of Schematic Design submittal, 24" x 36" or PDF Conceptual level cost estimate Review set(s) of Construction Documents submittal, 24" x 36"/PDF Final set(s) of Construction Documents, released for bidding and construction, 24" x 36/PDF 6. Construction Administration Phase: Perform field observations of the work in progress during construction with written reports to the Owner, attend regular site meetings with the Contractor and Owner's representative (Consultants on an as -needed basis), review of shop drawings and submittals, issuance of Architect's supplemental instructions (ASIs) and responses to Contractors requests for information (RFis), final "punch list" inspection and assistance with project close-out. For purposes of this Proposal, the number of field visits during the Construction Administration phase shall be limited to four (4) trips. For purposes of this Proposal, field observations by our Consultants are proposed as follows: a. Structural Engineering: 1 site visit. b. Mechanical Engineering: i site visit. C. Electrical Engineering: 1 site visit. 7. Record Documents: Preparation of record documents upon the completion of construction of this project. All construction documents prepared for this project shalt be generated with our in-house Computer -Aided Design and Drafting (CAD) systems, using AutoCAD Version 2011 and/or Revit 2011 software. Assumptions i. All site planning, use and design approvals, and other required entitlements such as plats, right-of- way and easement dedications, are in place through the City of Fort Collins. 2. The site is ready for development, with all required off -site Improvements in place, including any required street and roadway improvements adjacent the site, utility extensions and stub -outs onto or adjacent to the site, and any off -site stormwater discharge or infrastructure improvements. 3. The foundation and structural systems anticipated for this project assume concrete slab -on -grade construction. Post -tensioned concrete slabs or other structural ground level floor construction can be provided as Additional Services, if required by soils conditions. 4. The project will not be designed or pursue LEED certification. 5. Document preparation and applications for building permits or other construction permit applications shall be provided by the Owner and/or Contractor. 6. Printing and copying of bid documents, and distribution to Contractors for bidding will be provided by the Owner; we will furnish plots or PDFs of our original drawings and originals of the appropriate technical specification sections. Work Not Included 1. Planning and other related architectural services for taking the project through the development or other site plan approval process with the City of Fort Collins. 2. Submittal and compliance with development permitting requirements of outside agencies, including Environmental Protection Agency (EPA), Colorado Department of Transportation (CDOT), Colorado Division of Wildlife, Division of Natural Resources, etc., as may be applicable to the site. 3. Documentation, certification and notice requirements related to subsurface mineral estate rights that may exist beneath the surface rights held by the Owner. 4. Landscape architecture and civil design and engineering services. 5. Design and preparation of construction documents for other park structures notidentified in the Project Description above. 6. Electrical design and engineering for primary site electrical and secondary site electrical service to all park structures, parking lot and site lighting, and other site electrical systems unrelated to the buildings itemized above. Proposal for Architectural/Engineering Services - 3 7. LEED Consulting during design and construction, including energy modeling, daylighting analysis, coordination with the selected Contractor, and documentation and submittal services for the LEED certification process. 8. Preparation of Division 0, 1 and 2 specifications, including "front end" specifications. 9. Perspectives, renderings, models or other presentation documents. 10. Assistance to the Owner in selecting or prequalifying Contractors or Construction Managers. 11. Document preparation and applications for building permits or other construction permit applications. This will be done by the Contractor. 12. Printing and copying of bid documents, and distribution to Contractors for bidding. This will be provided by the Owner; we will furnish plots of our original drawings. 13. Site visits or field observations beyond those identified in the Scope of Basic Services. 14. Project or building inspection services as required by Chapter 17 of the International Building code (IBC), current edition. 15. Special design of mechanical/electrical systems such as heat pump systems, solar/photovoltaic systems. It is assumed the installation costs and payback period for these systems is not practical. 16. Energy Payback Analysis. Owner- or Prime Consultant -Provided Information 1. Design standards or guidelines for the City of Fort Collins, if applicable. 2. Asbestos or other hazardous material testing and abatement. 3. Copies of all applicable standard documents, forms, specifications or other Information from the City of Fort Collins to be a part of the bidding documents. 4. Copies of all standard specifications for materials, equipment and fixtures to be incorporated into the project design used by the City of Fort Collins, including material cut sheets and sources for sales and technical representatives, if available. 5. Coordination with telephone, electric, natural gas, propane or other independent utility and/or building services providers for infrastructure and equipment installation. 6. Base plan for improvements developed by the City of Fort Collins in AutoCAD Version 2011 format. 7. Coordination drawings and other information from the City of Fort Collins and other consultants during design and construction document phases. 8. Owner shall provide, or contract separately for, project or building inspections required by Chapter 17 of the IBC. These services are expressly excluded from this Proposal. Consultants Alter•Lingle•Massey Architects P.C. proposes the following consultants for this project: Structural Engineering Weeks and Associates, Inc. Gary Weeks, P.E. 4700 S. College Avenue, Suite 1 Fort Collins, CO 8525 (970)225-2422 Electrical Engineering ESC engineering, Inc. Kate Hodgson 3540 JFK Parkway Fort Collins, CO 80525 (970)224-9100 Mechanical Engineering Abrahamson Engineering Roger Abrahamson, P. E. 3101 Kintzley Court, Unit D LaPorte, CO 80535 (970) 221-2569 Fees Alter •Lingle•Massey Architects P.C. and our team of Consultants propose to complete the Scope of Basic Services through the Construction Administration phase for an hourly not -to -exceed design fee of $13,900.00, excluding reimbursable expenses. A breakdown of this fee by design discipline is as follows: Proposal for Architectural/Engineering Services - 4 Architectural: $ 8,000.00 Structural Engineering: S 1,700.00 Mechanical Engineering: $ 3,000.00 Electrical Engineering: $ 1,200.00 Reimbursable Expenses: 600.00 TOTAL: $14,500.00 Reimbursable Expenses In addition to Basic Services, the following expenses in connection with this project shall be reimbursable at 1.1 x direct cost: 1. Printing/scanning 2. Copying 3. Long distance telephone/FAX 4. Mileage and travel expenses 5. Postage 6. Federal Express/Express Mail and other delivery services 7. Photography or other miscellaneous expenses 8. Plotting of CAD -generated drawings For purposes of this Proposal, Reimbursable Expenses are estimated not to exceed $600.00, which does not include printing and copying for bid/construction sets. Additional Services If the Owner requests additional services beyond those set forth in this Proposal, or for additional services as described elsewhere in this Proposal, such services shall be agreed to in writing between the City of Fort Collins and the Architect and the fees adjusted accordingly per the following, current hourly rates, subject to annual adjustment: Aller•Lingle -Massey Architects P.C. Consulting: $135/hour Principal: $130/hour Associate Architect: $100/hour Sr. Project Manager/Architect: $95/hour Project Architect: $88/hour LEED AP Consulting: $85/hour Interior Designer: $75/hour Architectural Intern/CAD Technician 2: $70/hour Architecturallntern/CAD Technician 1: $60/hour Clerical/Administrative: $50/hour Weeks and Associates Inc. Principal Engineer: $100/hour Staff Engineer: $70.80/hour Administrative Staff: $35/hour Abrahamson Engineering Inc. Principal: $100/hour Professional Engineer: $85/hour Engineer/Senior Designer: $75/hour Draftsperson: $48/1hour Clerical: $48/hour ESC engineering Inc. Principal Engineer: $94/hour Project Manager: $92/hour Project Engineer: $88/hour Senior Electrical Designer: $72/hour Proposal for Architectural/Engineering Services - 5 Designer 1: $64/hour CAD Technician I: $60/hour Secretarial: $36/hour For purposes of this Proposal the following will be considered Additional Services: 1. Development of multiple bid packages, or otherwise staggering the release of documents to Contractors. 2. Fast -tracked construction schedules, or other acceleration of the construction schedule requiring the release of construction documents to Contractors prior to the completion of all documents. 3. For purposes of this Proposal, it is assumed that construction of all site structures will occur simultaneously, so that Construction Administration phase services including field observations will be performed concurrently. Additional field observations or other services required by staggering of construction sequencing or other delays beyond the control of the Architect shall be considered Additional Services. Schedule Scope of Basic Services for this project will be performed in accordance with the following schedule, assuming return of the signed work order and notice to proceed by July 15, 2011: 1. Design Phase: 4 weeks, proposed completion by September 1, 2011. l 2. Construction Documents Phase: 8 weeks, proposed completion by November 7, 2011. 3. Construction Administration Phase: As required by the proposed bidding/construction schedule. For purposes of this Proposal, these phases of the Basic Services will allow for Owner review and approval periods of one (1) week between each design phase of work. Budget Alter- Lingle -Massey Architects P.C. understands that no firm budget has been established for this project, however construction costs of $100,000 are anticipated, exclusive of land, design and engineering fees, City of Fort Collins building permit and development fees and other soft development costs. The Owner and/or preselected Contractor shall maintain an adequate contingency in the project budget to cover unforeseen site conditions, changes in the work, etc. Refer to Standard Contractual Terms and Conditions. Standard Contract Terms and Conditions All terms of this Proposal shall be in accordance with our 2007 master contract with the City of Fort Collins. Alter. Lingle -Massey Architects P.C. is dedicated to providing quality professional service and creative design solutions. We look forward to the opportunity of working with you an the playground restroom building at Rolland Moore Park. Please call if you have any questions concerning this Proposal. If acceptable to you, please draft the appropriate work order for signatures. We will schedule our work to begin upon receipt of the signed work order. This Proposal is valid for a period of 60 days. Thank you for your interest and consideration Sincerely, ALLER•LINGLE•MASSSSE/Y�ARCHITECTS P.C. Shaun J. Moscrip, AIA SJM:IIs C�Cf7OO��OCO�CCCOOOOO�OOC9.00t7CP,.C�PbOC�PO� e�L�CG3fr7d_" 0"�OCC