Loading...
HomeMy WebLinkAboutRESPONSE - AGREEMENT MISC - ARTSYSTEMSAo,,m Project Proposal Prepared for: Jeanne Shoaff, Lincoln Center Prepared by: Keith Jentzsch Gallery Walls July 18, 2011 Proposal number: 024 Artsystems 1916 Oakwood Drive Fort Collins, Colorado 80521 T 990.308.0890 keith.jenusch@colostate.edu } Arrerekma Project Summary Objective To design and fabricate a moveable and versatile gallery wall system Goals Gallery walls will be lightweight, provide maximum flexibility and function well for the gallery. Solution Design is contingent upon readily available materials, workplace efficiency, ease of implementation, stability and Flexibility. Project description Design: 40 linear feet of movable wall panels with integrated perpendicular hardware and angle connectors. • 8panels -4'w x 9'h • 4panels -2'w x 9'h Specific details of construction: Panels will be constructed with 4' x 8' prefabricated hollow core material (13/8" thick), surfaced with 1/4" MDF on both sides. 1/4" MDF facing will be replaceable; all surfaces paintable. Finished panels: 17/8" thick and 4'w x 9'h Each panel will be edged with 1/8" thick x 1 7/8" aluminum to protect the corners on the bottom and sides of each panel. Dual -sided, center hole magnets will be recessed into edge construction to ensure alignment and stability. Magnets are 1" in diameter by 1/2" thick and configured so that each wall will have a consistent positive and negative attraction. Positive and negative sides will be marked at the top of each panel. Two leveling feet will be included per panel. Panel connectors will be secured by interlocking aluminum sliding channels. Channels will be secured by a threaded bolt connection that can be hand or tool tensioned. Channel connectors will include: 10 - wall "edge" to wall "face" brackets • 6 - 90 degree edge connectors • 6-135 degree edge connectors Rev7/2009 dr m Rev7/200s Am>reu� Payment Schedule • Start-up cost for material purchasing/metal fabrication $7000.00 • Due upon completion of metal fabrication $1000.00 • Due August 22 for sub contracted labor $2500.00 • Due upon completion date/delivery of walls (September 27th) $4027.22 Total project Yost $14527.22