HomeMy WebLinkAboutCHANGE ORDER - BID - 7223 DIRECTIONAL BORING (4)07/19/2011 08:28 FAX 9704944449 COLORADO BORING COMPANY
[a 002
Change Order Form
PROJECT TITLE: Directional Boring
PROJECT NUMBER: /7223
CONTRACTOR: / G�aado Bodng
CHANGE ORDER NUMBER: i
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change In contract time.
1&2. Contract Work hours and Safety
Standards Act are added to Original contract.
Disadvantaged Business Enterprise (DOE) Is
updated.
3. The contract coat will not be effected. $
4. There will be no change In contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change ordep appreyed)
ACCEPTED BY:
0.00%
0.00%
KOO
$0.00
$0.00
$0.00
$0.00
DATE: :2 - - O!/
AF'f'HUVEO BY: DATE:
(Ci of MAPPROVED BY: DATE:
u hasing Agent over $60,000) —f Of
a: Coruracmr
Purchasing
Roles Fde
7. DISADVANTAGED BUSINESS ENTERPRISE (DBE)
a. This contract is subject to the requirements of Title 49, Code of Federal Regulations,
Part 26, Participation by Disadvantaged Business Enterprises in Department of
Transportation Financial Assistance Programs. The national goal for participation of
Disadvantaged Business Enterprises (DBE) is 10%. The agency's overall goal for DBE
participation is 7.2%. A separate contract goal [has not] been established for this
procurement.
b. The contractor shall not discriminate on the basis of race, color, national origin, or sex
in the performance of this contract. The contractor shall carry out applicable
requirements of 49 CFR Part 26 in the award and administration of this DOT -assisted
contract. Failure by the contractor to carry out these requirements is a material breach of
this contract, which may result in the termination of this contract or such other remedy as
City of Fort Collins deems appropriate. Each subcontract the contractor signs with a
subcontractor must include the assurance in this paragraph (see 49 CFR 26.13(b)).
The successful bidder/offeror will be required to report its DBE participation obtained
through race -neutral means throughout the period of performance.
c. The contractor is required to pay its subcontractors performing work related to this
contract for satisfactory performance of that work no later than 30 days after the
contractor's receipt of payment for that work from the City of Fort Collins. In addition,
[the contractor may not hold retainage from its subcontractors.
d. The contractor must promptly notify City of Fort Collins whenever a DBE
subcontractor performing work related to this contract is terminated or fails to complete
its work, and must make good faith efforts to engage another DBE subcontractor to
perform at least the same amount of work. The contractor may not terminate any DBE
subcontractor and perform that work through its own forces or those of an affiliate without
prior written consent of City of Fort Collins.
18. CONTRACT WORK HOURS AND SAFETY STANDARDS ACT
Background and Application
The Contract Work Hours and Safety Standards Act is codified at 40 USC 3701, et seq. The Act
applies to grantee contracts and subcontracts "financed at least in part by loans or grants from
... the [Federal] Government." 40 USC 3701(b)(1)(13)(iii) and (b)(2), 29 CFR 5.2(h), 49 CFR
18.36(i)(6). Although the original Act required its application in any construction contract over
$2.000 or non -construction contract to which the Act applied over $2,500 (and language to that
effect is still found in 49 CFR 18.36(i)(6)), the Act no longer applies to any "contract in an amount
that is not greater than $100,000." 40 USC 3701(b)(3) (A)(iii).
The Act applies to construction contracts and, in very limited circumstances, non -construction
projects that employ "laborers or mechanics on a public work." These non -construction
applications do not generally apply to transit procurements because transit procurements (to
include rail cars and buses) are deemed "commercial items." 40 USC 3707, 41 USC 403 (12).
A grantee that contemplates entering into a contract to procure a developmental or unique item
should consult counsel to determine if the Act applies to that procurement and that additional
language required by 29 CFR 5.5(c) must be added to the basic clause below.
The clause language is drawn directly from 29 CFR 5.5(b) and any deviation from the model
clause below should be coordinated with counsel to ensure the Act's requirements are satisfied.
Clause Language Contract Work Hours and Safety Standards
(1) Overtime requirements - No contractor or subcontractor contracting for any part of the
contract work which may require or involve the employment of laborers or mechanics shall
require or permit any such laborer or mechanic in any workweek in which he or she is employed
on such work to work in excess of forty hours in such workweek unless such laborer or
mechanic receives compensation at a rate not less than one and one-half times the basic rate of
pay for all hours worked in excess of forty hours in such workweek.
(2) Violation; liability for unpaid wages; liquidated damages - In the event of any violation of
the clause set forth in paragraph (1) of this section the contractor and any subcontractor
responsible therefor shall be liable for the unpaid wages. In addition, such contractor and
subcontractor shall be liable to the United States for liquidated damages. Such liquidated
damages shall be computed with respect to each individual laborer or mechanic, including
watchmen and guards, employed in violation of the clause set forth in paragraph (1) of this
section, in the sum of $10 for each calendar day on which such individual was required or
permitted to work in excess of the standard workweek of forty hours without payment of the
overtime wages required by the clause set forth in paragraph (1) of this section.
(3) Withholding for unpaid wages and liquidated damages - The (write in the name of the
grantee) shall upon its own action or upon written request of an authorized representative of the
Department of Labor withhold or cause to be withheld, from any moneys payable on account of
work performed by the contractor or subcontractor under any such contract or any other Federal
contract with the same prime contractor, or any other federally -assisted contract subject to the
Contract Work Hours and Safety Standards Act, which is held by the same prime contractor,
such sums as may be determined to be necessary to satisfy any liabilities of such contractor or
subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in
paragraph (2) of this section.
(4) Subcontracts - The contractor or subcontractor shall insert in any subcontracts the clauses set
forth in paragraphs (1) through (4) of this section and also a clause requiring the subcontractors
to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible
for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in
paragraphs (1) through (4) of this section.