Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7136 LINCOLN CENTER ADDITION AND RENOVATIONS (7)• OPERATION SERVICES Cityof Project Management, Planning & Design Fort Collins 300 LaPore Avenue P.O. Box 580 oTer a-4io Fort Collins. CO 80522-0.:80 Services 970-221.6610 970 721.6534 - fax Change Order Form PROJECT TITLE: Lincoln Center Additions and Renovations PROJECT NUMBER. Bid #7136 CONTRACTOR: Bryan Construction Company CHANGE ORDER NUMBER: 4 In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change 2. Description of change 3. Change in contract cost 4. Change in contract time. 1 &2 See attached sheet for detail. Changes compensation from fixed fee to time and direct cost basis with a not to exceed. • 3 The contract cost will not be effected. 4 There will be no change in contract time. ORIGINAL CONTRACT COST $5,514,309.00 TOTAL APPROVED CHANGE ORDERS $173,477.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $98,123.00 TOTAL % OF THIS CHANGE ORDER 1.78% TOTAL C.O. % OF ORIGINAL CONTRACT 4.93% ADJUSTED CONTRACT COST $5,785,909.00 (Assuming all change orders approved) ACCEPTED BY: �w y i.� + n�?cN i rt . �� DATE: /q .1 ' (Company Name & Person's Name) APPROVED BY: APPROVED BY: • cc: Contractor Purchasing Project File ry of Ft. Collins`') Agent over $60,000) DATE: �'/ f 7 I L DATE: f—tO • Ci Lincoln Center Additions & Renovation X Owner CO#4=-A5TFLC', As of 2/1 T2011 Base Contract $5,514,309 Description Change Order #1 (Partial) $460,000 Partial CO issued - Structural Fixes at Performance Hall Change Order 92 Total $70,732 ASI #1, 2 and 3, Trespa Changes Change Order #3 Total $102,744 C.W. Fire Suppression and Misc. ASIs, RFIs, etc. Change Order #4 Total $98,123 F.P. in Perf Hall B W Option 4: Misc. RFls & Owner Req'ts Revised Contract $6,245,908 Item # Reference Description of Item Cost Approved Comments APPROVED ITEMS 4.O Discussion Controls b) Long Controls Invoice for Software & Admin Time $1.185 5.0 RFI #5 - 5.2 Potential Add for Additional SF of Joist & Deck at Area C $0 37.0 RFI #79 Pipe elevator sump to Storage 104, provide 3" floor sink $1,917 38.0 RFI #87 Add lighting in Control Booth 182-A, 116 and 116-A $4.143 4-6 wk lead time from marl release 43.0 RFI #toe Light Pole Conflict - Add new fixture, stock old fixture $868 44.0 Discussion Fire Protection Changes - West Side Option 4 $46,117 45.0 Discussion Fire Protection Changes - Performance Hall $35 227 Scaffolding included „1V1 Awosimai We,x 48.0 RFI #95 Credit for deleting underdram system at NW corner 52,516 49.0 Owner Rep'si Add new li hts in Admin Restroom Vestibules one each $570 50.0 Owner Reg'st Add ceilino over existinq louver in Mini Theater Control Booth $506 51.0 RFI 9110 Reroute Existing Gas Line to avoid new structural steel $1.619 52.0 Owner Reg'st Add new GFCIS in Admin Restrooms $0 53.0 Owner Reds) Retexture wall in Admin Restrooms $875 54.0 Field Issue Install new valve for Admin area water shutoff, raide existing floor drains for new tile, and install Owner Furnished Urinals. $1,824 55.0 RFI M& 105 Reroute storm drain piping out of existing building. $3.171 56.0 Owner Regst Add new additional access door in soffit in Canyon West $378 58.0 8abmibal Per submittal comments from Garth on RTUopenin s, upsize steel $2,240 CO #4 - Approved Items Total: $98,123 OPEN ITEMS 15.0 Discussion Future Acoustical Work in Performance Hall TBD 39.0 Field Issue Sewer Line - Camera and Clean out Roots $9,635 TO -DATE Cost. Issue on -going. 46.0 ASI #9 Performance Hall Structural Wall Fixes TBD 47.0 Owner Rw'w Add new ACT & Grid in Admin RR, delete painhnq ceilings $1,503 57.0 owner Reg st Carpel Changes (Green Rm from Aflas to Milliken), price increases $5 792 59.0 ASI #10 Exterior Artwork Lighting TBD 60.0 ASI #11 Forthcoming. Columbine Rm Work, 2nd Floor Bar, Door in CW Rm TBD 61.0 ASI #12 Forthcoming Performance Hall Acoustical - see Item 15. TBD 62.0 RFI in 19 Dimensional / Framing Issues in Area C TBD 63.0 Future RFI Drywall I Framing I Finish of Exist. Brick Wall in N Lobby / Condor 179 TBD Open Items Total: $16,930 Approved hems Total: $98,123 Contractor: Owner: Todd Blanks, Project Manager Steve Seefeld, Project Manager City of Fort Collins