Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7222 ASPHALT OVERLAY (2)C�jtggof Collins Streets planning, Development IN Transportation F}y,.�W 625'ff"h Su08t Streets P.O. ea. sea Forl rdi nor• CO e0SM0580 970221.6615 970.221.5270. la. Change Order Form PROJECT TITLE: 2011 KFCG Street Maintenance Program, Asphah Overlay Project PROJECT NUMBER: 902111 ( Bid #7222) CONTRACTOR: Lafarge Northern (PO 09112453) CHANGE ORDER NUMBER: 1 n prepanng charge orders show in order as Separate nUmered paragraphs the folloyArg 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change In contract time 1. See attached document Change Omer No. 1 3. The contract cost w10 Increase by $239,981.91 4. There is n0 change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST ACCEPTED BY: APPROVED BY: APPROVED BY: Contractor Plectrasfiv Project Fie _. ..._... _...___. _:._._.___._......777%%- 7.37% $3.264,588.76 $0.00 $0.00 $239,981.91 $3,494,568.66 Change Order No: 1 Date: 7/1912011 1 Reason For Change: a. Bid Alternate 1 Horsetooth Rd -College to Timberline Grinding and Traffic Control b. Additional Traffic control for patching and milling on Horsetooth c. Additional Grinding for paver patches 2 Description Of Change: a. Lafarge Bid Altemate additional grinding and Iraffic controlfor l-imelooth Rd 3 Change In Contract Amount: Item Oty Unit Unit Con Total Cast a. 202.10 Grinding (planing) Surface Reparation <1" 74000.00 SY $2.65 $196,100.00 630.00 Conswction Zone Traffic Control 1.00 E eh 59,078.00 $9,078.00 b. 630.00 Tefic Control additional patches on 14T 1.00 Each $9.862.00 $8,862.00 C. 202.10 Grinding (planing) Surface Prcparalion <3" 9789.40 SY $2.65 525,941.91 TOTAL CHANGE IN CONTRACT AMOUNT TOTAL $239,981.91 4 Change In Contract Time a. No Change TOTAL CHANGE IN CONTRACT TIME 0 <9- City Of Collins Planning, Development & Transportation stmFort 25 rann Stmn 025M Street$ P.O, eek M Fo#.. Coffins. CO 80622.05eD ' 9ro.22t,9ei5 er0,221,52M fax Change Order Form PROJECT TITLE: 2011 KFCG/Street Maintenance Program, Asphalt Overlay Project PROJECT NUMBER: 9=120 ( Bid 97222) CONTRACTOR: Lafarge Northern (Pb #9112453) CHANGE ORDER NUMBER: 2 1. Reasonlorchange. 2. Descripilonolchar 3. Change In contract cost. 4. Change In combed 1. See attached document Change Order No. 2 3. The contract cost will Increase by $79,97320 4. There is no change in contract tine. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % ORIGINAL CONTRACT ADJUSTED CONTRACT COST ACCEPTED BY. APPROVED BY APPROVED BY 00: contrw Purowsty Proles Fft 2.42% 9600% S3254,WS.75 $239,981.91 $78,873.20 $3,5T3,44148 )ATE DATE. C7 DATE: 7,----- a Charge Order No: 2 Dale: 7/19/2011 1 Reason For Change: a. Harmony crossing patching milling and traffic control 2 Description Of Change: a. Time and materials for Harmony Crossing 3 Change In Contract Amount: Item Qty Unit Unit Cost Total Coal a. 630.00 Construction Zone Traffic Control 1.00 Each S17.787.00 $17 787 00 40.1.07 HMA - Hand Patching - Remove&Replace 513.20 Ton $I 19.03 $61,086.20 TOTAL CHANGE IN CONTRACT AMOUNT TOTAL $78,873.20 4 Change In Contraet Time a. No Change TOTAL CHANGE IN CONTRACT TIME g C/ Of Fort Collins Planning, Development & Transportation suft' ✓s MMn slwgt ��hee~. P.O. BOR 580 - _ Fan CdOns. 0000522.0500 970.221.0619 970.221.6270- I" Change Order Form PROJECT TITLE 2011 KFXIIStrem Maintenance Program, Asphalt Overlay Project PROJECT NUMBER: 902120 ( Bid 87222) CONTRACTOR: Lafarge Northern (PO 09112453) .. - .... . CHANGE ORDER NUMBER: 3 1. Reason for Mange. 2. Description OL Mange 3. Charge in contract cost. 4. Change in contract time. 1. See atiachad document Change Order No. 3 3. The contract coat will bxrease Dy $23.478.00 4. There Is no charge In convect time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % THIS CHANGE ORDER TOTAL C.O. % ORIGINAL CONTRACT ADJUSTED CONTRACT COST O.M% f0.M $32S4,588.75 $318,855.11 $23,478.00 83,598,919.88 ACCEPTED BY: DATE: Can r s Represaftilve Q APPROVED BY: DATE: Paftwlent Management Manager - / m OMR00tOr PLnmaibq (� PM)w FOR Change Order No: 3 Dale: 7/19/2011 1 Reason For Change: a. Prospect T S M SY Petromat 17400SY b. Prospect Ftow Boys 2 Description 01 Change: a. Time and materials for Petronat on W Prospect b. Adclitonal trucking needed on Prospect Project 3 Change In Contract Amount: Item Qty Unit Unit Con Total Cost a. 420.01 Deotextile Paving Fabric _ 1740000 SY $1.25 $21,750.00 b. Trucking Prospect Flow Boys 24.00 HR $72.00 $1,728.00 TOTAL CHANGE IN CONTRACT AMOUNT TOTAL $23.478.00 4 Change In Contract Time a. No Change TOTAL CHANGE IN CONTRACT TIME 0