HomeMy WebLinkAboutCHANGE ORDER - RFP - 7033 DISCOVERY MUSEUM FACILITY (4)SECTION 00950
CHANGE ORDER NO. 3
PROJECT TITLE: Discovery Museum
CONTRACTOR: Hensel Phelps Construction Company
BID NUMBER: 7033
DESCRIPTION: The construction of a 46,928 square feet Discovery Museum facility complete with related site
work, curb & gutter, paving, sidewalks, utilities and landscaping.
1. Reason for change: Incorporation of various Change Estimates (CE) into the Contract.
2. Description of changes: CE035 Unforseen Conditions; Helical Piers not Meeting Refusal - $60,502.00;
CE050R Reduce Height of 12' Double Doors - $675.00; CE056R Unforseen Conditions; Sorting City Provided
Fill Dirt — $2,073.00; CE064 Reduce Asphalt Pavement Add - $1,032.00; CE067 Delete Metal Wall Panel @
North Elevation Tower Add - $1,520; CE068R Reinstate Finishes in Collection Storage - $3,787.00; CE078
Unforseen Condition; Conflict w/ Electrical @ Storm Line - $20,126.00; CE088R Revise Carpet Layout in
Gallery @ Access Flooring - $3,387.00; CE109R Credit for City Furnished Skylights — ($3,667.00); CE179 Add
Panic Alarms to Doors 126D & 127B - $844.00; CE181 Add Rebar for Helical Piers Added - $811.00; CE185
Deletion of Niche w/ New Carpet Style - Mezzanine — ($843.00); CE186 Lighting Control Panel & Routing for
Exhibit Lighting - $43,605.00; CE192 Deletion of Greenscreen & Site Furnishings — ($67,561); CE193 Provide
Electrical Outlets & Switches per Owner Walk — $639.00; CE200 Provide Waterproofing in Mechanical 123 -
$1,277; CE223 Lights @ Observation Deck — $1,718.00; CE226 Outlets @ Observation Deck - $1,357.00;
CE230 Delete Outlets @ Garage Exhibit — ($344.00); CE233 Add Power for Atomic Clock - $1,063.00; CE235
Credit Temporary Electric Budget from GC's — ($11,071.00).
3. Change in Contract Cost: $60,930.00
4. Change in Contract Time: 0 Days
ORIGINAL CONTRACT COST $11,400,000.00
TOTAL APPROVED CHANGE ORDERS 737,171.00
TOTAL PENDING CHANGE ORDERS 0.00
TOTAL THIS CHANGE ORDER 60,930.00
ADJUSTED CONTRACT COST $12,198,101.00
ACCEPTED BY
ACCEPTED BY:
/SK9I=11==[07:ya
Contractor's Representative
Facilities Project Ma
scovery Museum Director (City of Fort Collins)
sad -Z�z
ACCEPTED BY:%?/� a ?z 1
Discovery M 'eum Director (NPC)
APPROVED BY:
rej�tor of Purchasing and Risk Management
Date
7
Date
Datef/
2
Date
_ -7 l 2c) �l
Dat
cc: Purchasing Architect Contractor Project File
unange tstimates
6/6/11
6/30/11
CE #
035
050R
I Description
Unforseen Conditions; Helical Piers not Meeting Refusal
Reduce Height of 12' Double Doors
Cost
$675.00
Contingency
$60,502.00
056R
064
067
068R
Unforseen Conditions; Sorting City Provided Fill
Reduce Asphalt Paving
IDelete Metal Wall Panel @ North Elev. Tower
IReinstate Finishes in Collection Storage
$3,787.00
$2,073.00
$1,032.00
$1,520.00
073
Provide Sprinkler Coverage for Enclosed Exhibits
Cancelled
078
088R
Unforseen Condition: Conflict w/ Electrical @ Storm Line
Revise Carpet Layout in Gallery @ Access Flooring
$3,387.00
$20,126.00
109R
ISkylights
-$3,667.00
179
Add Panic Alarms to Exterior Doors 126D & 127B
$844.00
181
Add Rebar to Accommodate Helical Piers Added
$811.00
185
Deletion of Niche w/ New Carpet Style - Mezzanine
-$843.00
186
Lighting Control Panel and Routing for Exhibit Lighting
$43,605.00
192
Deletion of Green Screen & Site Furnishings
-$67,561.00
193 1
Provide Electrical Outlets & Switches per Owner Walk
$639.00
200 jProvide
Waterproofing in Mechanical 123
$1,277.00
223 ILights
at Observation Deck
$1,718.00
226 10utlets
at Observation Deck
$1,357.00
230 1
Delete Outlets @ Garage Exhibit
-$344.00
233 JAdd
Power for Atomic Clock
$1,063.00
235
Credit Temporary Electric Budget from GC's
-$11,071.00
Total-$25,134.00
Change Order #3 Totall
$86,064.00
$60,930.00