HomeMy WebLinkAboutCHANGE ORDER - BID - 7186 FENCING OF LR PASTURE AT SOAPSTONE PRAIRIE NATURAL AREALCHANGE ORDER NO.
PROJECT TITLE: Soapstone LR Fence
CONTRACTOR: Rising Sun Fence & Construction LLC
PROJECT NUMBER:
DESCRIPTION:
1. Reason for change: The constructed fence was 3,454 feet longer than bill,
increased number of H braces (28). Wire gates (9), 12' metal gates (2), 6' metal gates
(1),,and corner/end brace(18)
2. Description of Change:
3. Change in Contract Cost $7,565.86
4. Change in Contract Time: NIA
ORIGINAL CONTRACT COST
$_26,038.00
TOTAL APPROVED CHANGE ORDER _33,003.86
TOTAL PENDING CHANGE ORDER — 7,585.86
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O.% OF ORIGNINAL CONTRACT
ADJUSTED CONTRACT COST $ _33,603.86
(Assuming all change orders approved) p
ACCEPTED
6 ED�e � �DATE:
e� Cvn �� at �S4r� tcc.
Contractor's Representative 1
ACC /BY: a lwj� c� DATE: 7 (Z 1,
Project Manager
BY:
DATE:
Title:
APPROVED
BY:
DATE:
Title:
APPROVED
BY:
DATE:
Purchasing Agent over $30,000
Contractor
Project File
Architect