Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7186 FENCING OF LR PASTURE AT SOAPSTONE PRAIRIE NATURAL AREALCHANGE ORDER NO. PROJECT TITLE: Soapstone LR Fence CONTRACTOR: Rising Sun Fence & Construction LLC PROJECT NUMBER: DESCRIPTION: 1. Reason for change: The constructed fence was 3,454 feet longer than bill, increased number of H braces (28). Wire gates (9), 12' metal gates (2), 6' metal gates (1),,and corner/end brace(18) 2. Description of Change: 3. Change in Contract Cost $7,565.86 4. Change in Contract Time: NIA ORIGINAL CONTRACT COST $_26,038.00 TOTAL APPROVED CHANGE ORDER _33,003.86 TOTAL PENDING CHANGE ORDER — 7,585.86 TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O.% OF ORIGNINAL CONTRACT ADJUSTED CONTRACT COST $ _33,603.86 (Assuming all change orders approved) p ACCEPTED 6 ED�e � �DATE: e� Cvn �� at �S4r� tcc. Contractor's Representative 1 ACC /BY: a lwj� c� DATE: 7 (Z 1, Project Manager BY: DATE: Title: APPROVED BY: DATE: Title: APPROVED BY: DATE: Purchasing Agent over $30,000 Contractor Project File Architect