INVITATION TO BID
7245 Transformer Repair
BID OPENING: 3:00 P.M. (our clock), JUNE 14, 2011
Sealed bids will be received and publicly opened at the office of the Director of Purchasing and Risk
Management, PO Box 580, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80522, at the
time and date noted on the bidproposal and/or contract documents. If delivered, they are to be sent
to 215 North Mason Street, 2n Floor, Fort Collins, Colorado 80524. If mailed, the address is P.O.
Box 580, Fort Collins, 80522-0580.
Bids must be received at the Purchasing Office prior to 3:00 p.m. (our clock), June 14, 2011.
Questions concerning the scope of the bid should be directed to Project Manager Kraig Bader
(970)416-2481.
Questions regarding bid submittal or process should be directed to Opal F. Dick, CPPO, Sr. Buyer
(970) 221-6778.
A copy of the Bid may be obtained as follows:
Download the Bid from the Purchasing Webpage, Current Bids page, at:
http://fcnov.com/eprocurement
2. Come by Purchasing at 215 North Mason St., 2nd floor, Fort Collins, and request a
copy of the Bid.
Special Instructions
All bids must be properly signed by an authorized representative of the company with the legal
capacity to bind the company to the agreement. Bids may be withdrawn up to the date and hour set
for closing. Once bids have been accepted by the City and closing has occurred, failure to enter into
contract or honor the purchase order will be cause for removal of supplier's name from the City of
Fort Collins' bidders list for a period of twelve months from the date of the opening. The City may
also pursue any remedies available at law or inequity. Bid prices must be held firm for a period of
forty-five (45) days after bid openings.
Submission of a bid is deemed as acceptance of all terms, conditions and specifications contained
in the City's specifications initially provided to the bidder. Any proposed modification must be
accepted in writing by the City prior to award of the bid.
Only bids properly received by the Purchasing Office will be accepted. All bids should be clearly
identified by the bid number and bid name contained in the bid proposal.
No proposal will be accepted from, or any purchase order awarded, to any person, firm or
corporation in default on any obligation to the City.
Bids must be furnished exclusive of any federal excise tax, wherever applicable.
Rev. D
a) This Specification
b) Applicable industry standards
c) Purchase order terms and conditions
The City reserves the right to perform a facility inspection upon award of contract or at any time
after award of the contract. The City also reserves the right to perform or witness any of the
quality control procedures, tests, or inspections where, in the sole opinion of the City, such
inspections are deemed necessary. The City reserves the right to cancel the purchase contract at
any time, if in the sole opinion of the City, the product, service or delivery does not meet
specifications, even if non -conforming material or service has previously been accepted. At the
discretion of the City, a supplier providing non -conforming material or service may be removed
from the Approved Suppliers list for an indefinite re-evaluation period of not less than three years.
3.4. Shipment
Bid pricing shall include pick up and delivery at the City's Warehouse facility. The minimum
number of transformers per pick up must be stated in the bid. Thirty (30) day turn around is
required for non -emergency repair. Emergency repair turn around will be determined at the time
repair is requested. Any extra charges for emergency turn around must be included in the bid.
3.5. Payment
Payment will be made in accordance with Purchase Order Terms and Conditions. The repair
facility shall furnish certified copies of the results of tests prior to payment. Copies shall be sent
with each transformer at delivery as well as with the invoice. Unsigned copies are not acceptable
even if accompanied by a signed cover letter. Work shall not be considered complete until
certified test reports are received.
3.6. Quality Control
3.6.1 It is preferred that the Bidder's repair facility have an electronic work order management
system that maintains customer transformer information, tracks a transformer's progress
through the various stages of repair, and keeps track of work performed to each unit.
Bidder shall describe in the bid their process or system for work order tracking and
management and how each transformer unit is entered into that system.
3.6.2 Electrical testing of transformers, core and coil repair and/or re -winding, and any kind of
welding, shall be done in separate, isolated areas of the plant to avoid contamination or
damage to the units under repair. A description of the bidder's facility shall be included in
the bid and shall state how these processes are protected from each other.
3.6.3 Bidder should have a documented policy on its repair and re -wind procedures. Bidder
shall state in the bid their repair and rewind procedures for transformer core and coil.
This shall include, but is not limited to:
3.6.3.1 The type of paper used In coil winding,
3.6.3.2 The standard oven temperature and bake time for core and coil dryout,
3.6.3.3 How long after baking until the lank is filled with oil, and
3.6.3.4 The method in which the tank is filled with oil.
3.6.4 Bidder's repair facility should have a procedure for leak testing any units before they are
shipped back to the user. Visual inspection alone is NOT considered an acceptable
means of leak testing. Bidder shall state in the bid, tcurrent procedure or practice for
leak testing of transformers.
Page 5 /16
368-595
Rev. D
3.6.5 If the Bidder's facility accepts and/or repairs transformers that are PCB contaminated, the
facility shall have a procedure for prevention of cross -contamination between PCB and
non -PCB oil. The Bidder shall state in the bid whether it accepts and/or repairs PCB
contaminated units and if so, shall include their cross -contamination procedure.
3.6.6 The Bidder shall state in bid whether an Environmental Audit has been performed on the
Bidder's facility and property. If an audit has been performed, the findings of that audit
shall be briefly explained and included in the bid.
4. TECHNICAL REQUIREMENTS
4.1. Oil
Oil shall meet the requirements of ASTM D3487 and ANSI/IEEE C57.106. Oil and oil handling
equipment shall be certified PCB free and certification must accompany delivery. The City
reserves the right to refuse any unit(s) not certified PCB free.
4.2. Repair and Test
4.2.1. Minor repairs shall include, but are not limited to:
4.2.1.1. Complete external and internal inspection.
4.2.1.2. Diagnosis, including testing as required.
4.2.1.3. Replacement parts shall be:
4.2.1.3.1. Electrically equivalent and visually acceptable
4.2.1.3.2. Secondary bushings on modified overhead and submersible transformers shall
be of thermoplastic material (bushings manufactured using a thermoset material
will not be accepted).
42.1.3.3. Overcurent protection devices on rectangular horizontal submersible
transformers shall be Cooper Power Systems Magnex interrupter
4.2.1.3.4. Overcurent protection devices on modified overhead units and round -tank
submersible shall be secondary breakers.
4.2.1.4. Repair leaks.
4.2.1.5. Bake core and coil.
4.2.1.6. Oil filtration for water and carbon removal. Add oil as needed, charged at prevailing
price at time of shipment. Oil must be certified PCB free, and such certification must
accompany delivery.
4.2.1.7. Tank painted to our specification listed in Bid Proposal Forms, repainting of the
transformer number; custom NEMA safety tag will be replaced by the City.
4.2.1.8. Testing, including full voltage, core and coil losses, insulation hi -pot to ground,
transformer turns ratio, megger testing, dielectric withstand strength of oil.
4.2.1.9. Complete certified test report must accompany each unit at delivery.
Page 6 /16
368-595
Rev. D
4.2.2. Rewinds shall include, but are not limited to, the technical requirements identified in section
4.2.1 in addition to rewinding of the coil.
Page 7 116
368-585
APPENDIX A — .
This page intentionally left blank
Page 8 /16
368-595
Rev. D
Rev. D
BID PROPOSAL FORM: SCHEDULE I -A
OVERHEAD TRANSFORMERS, minor repair - (includes modified units for underground vault installation)
Paint requirement: light grey, ANSI No. 70, Munsell 50G 7.0/0.4
Voltage: 7620 volt, 95 BIL transformers
KVA
, SEC
.'$ w/TAPS
$ w/o TAPS
$ Adder for CSP
10
1201240
25
1201240
350
350
0
50
120240
5 0
550
0
50
240/480
550
75
120240
675
675
0
100
277
800
800
0
100
120240
800
800
0
100
1 240014160Y
800
800
0
167
120240
167
277
1
167
416 rdY2400
1 1 0 0
1 1 0
0
0
250
120240
250
277
1450
1 4 5 0
0
Page 9 /16
368-595
Rev. D
BID PROPOSAL FORM - SCHEDULE I-B
OVERHEAD TRANSFORMERS, minor repair - (includes modified units for underground vault installation)
Paint requirement: light grey, ANSI No. 70, Munsell 50G 7.0/0.4
Voltage: 7620/13200 x 2400/4160Y transformers
KVA
SEC
$ w/TAPS
$ w/o TAPS
$ Adderfor CSP
10
120/240
225
2 5
25
120/240
275
25
240/480
2 7 5
2 7 5
50
120/240
p
50
240/480
550
550
100
120/240
800
Boo
0
100
277
800
800
0
Page 10 /16
368-595
Rev. D
BID PROPOSAL FORM -SCHEDULE II -A
OVERHEAD TRANSFORMERS, rewind in addition to minor repair - (includes modified units for
underground vault installation)
Paint requirement: light grey, ANSI No. 70, Munsell 5013 7.0/0.4
Voltage: 7620 volt, 95 BIL transformers
W
SEC
$ w/rAPS
$ w/o TAPS
$ Adder for CSP
10
120/240
450
450
25
120/240
50
120/240
1275
1275
50
2401480
1 2 7
1 2 7 5
0
75
120/240
1 6 7
100
277
2 0 5 0
0
100
120/240
2 0 5.Q
2050
0
100
2400/4160Y
2050
2050
0
167
1201240
167
277
167
4160 rdY/2400
250
1201240
3750
3750
0
250
277
Page 11 /16
368-595
Rev. D
BID PROPOSAL FORM -SCHEDULE II-B
OVERHEAD TRANSFORMERS, rewind in addition to minor repair - (includes modified units for
underground vault installation)
Paint requirement: light grey, ANSI No. 70, Munsell 60G 7.0/0.4
Voltage: 7620/13200 x 2400/4160Y transformers
KVA
I SEC
'•$ w/rAPS
I $ w/0 TAPS
$ Adder for CSP .
10
120/240
450
4 5 0
25
1201240
25
240/480
8 0
0
50
120/240
50
2401480
1275
1275
100
1201240
2050
2050
0
100
277
Page 12 116
368-595
BID PROPOSAL FORM - SCHEDULE III
PAD -MOUNTED TRANSFORMERS
Single Phase
Paint Requirement: Equipment Green, Munsell 9GY 1.5/2.6
Voltage 7620 volt, 95 BIL transformers, 120/240 secondary, vhth taps:
Rev. D
Page 13 /16
368-595
BID PROPOSAL FORM - SCHEDULE IV
PAD -MOUNTED TRANSFORMERS
Three phase, loop feed except as noted
Paint requirement: Desert tan, Munsell 10YR 6.0/3.0
Voltage: 7620 volt, 95 BIL transformers, with taps:
KVA
$,Minor Repair
Sec Voite a
$ Rewind Adder.
Sec Volta a • ,
208Y/120
480Y/277
208Y/120
48OY277
75 radial
2525
2525
3700
3700
75
150
2
300
3575
3575
7175
7175
Soo
750
1000
6 7
500
14500
1500
2000
1 1350
-.11350
2500
13650
13650
22725
22725
Rev. D
Pape 14 /16
368-595
Bidders must be properly licensed and secure necessary permits wherever applicable.
Bidders not responding to this bid will be removed from our automated vendor listing for the subject
commodities.
The City may elect where applicable, to award bids on an individual item/group basis or on a total
bid basis, whichever is most beneficial to the City. The City reserves the right to accept or reject any
and all bids, and to waive any irregularities or informalities.
Sales prohibited/conflict of interest: no officer, employee, or member of City Council, shall have a
financial interest in the sale to the City of any real or personal property, equipment, material,
supplies or services where such officer or employee exercises directly or indirectly any decision -
making authority concerning such sale or any supervisory authority over the services to be rendered.
This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity, favor,
entertainment, kickback or any items of monetary value from any person who has or is seeking to do
business with the City of Fort Collins is prohibited.
Freight terms: unless otherwise noted, all freight is F.O.B. Destination, Freight Prepaid. All freight
charges must be included in prices submitted on proposal.
Discounts: any discounts allowed for prompt payment, etc., must be reflected in bid figures and not
entered as separate pricing on the proposal form.
Purchasing restrictions: your authorized signature of this bid assures your firm's compliance with
the City's purchasing restrictions. A copy of the resolutions is available for review in the Purchasing
Office or the City Clerk's Office. Request Resolution 91-121 for cement restrictions.
Collusive or sham bids: any bid deemed to be collusive or a sham bid will be rejected and reported
to authorities as such. Your authorized signature of this bid assures that such bid is genuine and is
not a collusive or sham bid.
Bid results: for information regarding results for individual bids send a self-addressed, self -stamped
envelope and a bid tally will be mailed to you. Bid results will be posted in our office 7 days after the
bid opening.
James B. O'Neill II, CPPO, FNIGP
Director of Purchasing and Risk Management
Rev. D
BID PROPOSAL FORM - SCHEDULE V
SUBMERSIBLE TRANSFORMERS (includes round tank and horizontal rectangular tank designs)
Single Phase
Paint Requirement: Light grey, ANSI No. 70, Munsell 50G TWA
Voltage 7620 volt, 95 BIL transformers, 120/240 secondary:
KVA
$ Minor Re air
$Rewind Adder
50
8
]lM
75
100
*Price only valid provided the lids do not have to be cut off.
Submersible Type Transformers with welded on lids can only be
painted.
Page 15 116
368-595
Rev. D
BID PROPOSAL FORM - SCHEDULE %A
Would your firm accept transformers in exchange for any labor expended prior to discovery of need to
rewind if rewind option is not accepted by City?
Yes X
tM
inspection fee if rewinding not approved
Page 16 /16
368-595
Purchase Order Terms and Conditions
1. COMMERCIAL DETAILS.
Invoice Address. To ensure prompt Payment mail Invoices in duplicate
to:
City of Fort Collins Accounting Division
P.O. Box 580
Fort Collins, CO 80522
Tax exemptions. By statute the City of Fort Collins is exempt from slate
and local taxes. Our Exemption Number is 98.04502. Federal Excise Tax
Exemption Certificate of Registry 84-6000587 is registered with the
Collector of Internal Revenue, Denver, Colorado (Ref. Colorado Revised
Statutes 1973, Chapter 39-26, 114 (a).
Goods Rejected. GOODS REJECTED due to failure to meet
specifications, either when shipped or due to defects of damage in
transit, may be returned to you for credit and are not to be replaced
except upon receipt of written instructions from the City of Fort Collins.
Inspection. GOODS are subject to the City of Fort Collins inspection on
arrival.
Final Acceptance. Receipt of the merchandise, services or equipment in
response to this order can result in authorized payment on the part of the
City of Fort Collins. However, it is to be understood that FINAL
ACCEPTANCE is dependent upon completion of all applicable required
inspection procedures.
Freight Terns. Shipments must be F.O.B., City of Fort Collins, 700 Wood
St., Fort Collins, CO 60522, unless otherwise specified on this order. if
permission is given to prepay freight and charge separately, the original
freight bill must accompany invoice. Additional charges for packing will
not be accepted.
Shipment Distance. Where manufacturers have distributing points In
various parts of the country, shipment is expected from the nearest
distribution point to destination, and excess freight will be deducted from
Invoice when shipments are made from greater distance.
Permits. Seller shall procure at sellers sole cost all necessary permits,
certificates and licenses required by all applicable laws, regulations,
ordinances and rules of the state, municipality, territory or political
subdivision where the work Is performed, or required by any other duly
constituted public authority having jurisdiction over the work of vendor.
Seller further agrees to hold line City of Fort Collins harmless from and
against all liability and loss incurred by them by reason of an asserted or
established violation of any such laws, regulations, ordinances, rules and
requirements.
Authorization. All parties to this contract agree that the representatives
are, in fact, bona fide and possess full and complete authority to bind
said parties.
LIMITATION OF TERMS. This Purchase Order expressly limits
acceptance to the terms and conditions stated herein set forth and any
supplementary or additional terms and conditions annexed hereto or
incorporated herein by reference. Any additional or different terms and
conditions proposed by seller are objected to and hereby rejected.
2. DELIVERY.
PLEASE ADVISE PURCHASING AGENT Immediately if you cannot
make complete shipment to anive on your promised delivery date as
noted. Time is of the essence. Delivery and performance must be
effected within the time stated on the purchase order and the documents
attached hereto. No acts of the Purchasers including, without limitation,
acceptance of partial late deliveries, shall operate as a waiver of this
provision. In the avant of any delay, the Purchaser shall have, in addition
to other legal and equitable remedies, the option of placing this order
elsewhere and holding the Seller liable fordamages. However, the Seger
shall not be liable for damages as a result of delays due to causes not
reasonably foreseeable which are beyond Its reasonable control and
without its fault of negligence, such acts of God, acts of civil or military
authorities, governmental priorities, fires, strikes, flood, epidemics, wars
or riots provided that notice of the conditions causing such delay is given
to the Purchaser within five (5) days of the time when the Seger first
received knowledge thereof. In the event of any such delay, the date of
delivery shall be extended for the period equal to the time actually lost by
reason of the delay.
3. WARRANTY.
The Seller warrants that all goods, articles, materials and work covered by
this order will conform with applicable drawings, specifications, samples
and/or other descriptions given, will be fit for the purposes intended, and
performed with the highest degree of rare and competence in accordance
with accepted standards for work of a similar nature. The Seger agrees to
hold the purchaser harmless from any loss, damage or expense which the
Purchaser may sugar or incur on account of the Sellers breach of warranty.
The Seller shall replace, repair or make good, without cost to the purchaser,
any defects or faults arising within one (1) year or within such longer period
of time as may be prescribed by law or by the terms of any applicable
warranty provided by the Seller after the date of acceptance of the goods
furnished hereunder (acceptance not to be unreasonably delayed), resulting
from imperfect or defective work done or materials furnished by the Seller.
Acceptance or use of goods by the Purchaser shall not constitute a waiver of
any claim under this warranty. Except as otherwise provided in this purchase
order, the Sellers liability hereunder shall extend to all damages proximately
caused by the breach of any of the foregoing warranties or guarantees, but
such liability shall in no event include loss of profits or loss of use. NO
IMPLIED WARRANTY OR MERCHANTABILITY OR OF FITNESS FOR
PURPOSE SHALL APPLY.
4. CHANGES IN LEGAL TERMS.
The Purchaser may make changes to legal terms by written change order.
5. CHANGES IN COMMERCIAL TERMS.
The Purchaser may make any changes to the terms, other than legal terms,
Including additions to or deletions from the quantities originally ordered in the
specifications or drawings, by verbal or written change order. If any such
change affects the amount due or the time of performance hereunder, an
equitable adjustment shall be made.
6. TERMINATIONS.
The Purchaser may at any time by written change order, terminate this
agreement as to any or all potions of the goods than not shipped, subject to
any equitable adjustment between the parties as to any work or materials
then in progress provided that the Purchaser shag not be liable for any
claims for anticipated profits on the uncompleted portion of the goods and/or
work, for incidental or consequential damages, and that no such adjustment
be made In favor of the Seller with respect to any goods which are the
Sellers standard stock. No such termination shall relieve the Purchaser or
the Seller of any of their obligations as to any goods delivered hereunder.
7. CLAIMS FOR ADJUSTMENT.
Any claim for adjustment must be asserted within thirty (30) days from the
date the change or termination is ordered.
S. COMPLIANCE WITH LAW.
The Seller warrants that all goods sold hereunder shall have been produced,
sold, delivered and furnished in strict compliance with all applicable laws and
regulations to which the goods are subject. The Seller shall execute and
deliver such documents as may be required to effect or evidence
compliance. All laws and regulations required to be incorporated in
agreements of this character are hereby Incorporated herein by this
reference. The Seller agrees to Indemnity and hold the Purchaser harmless
from all costs and damages suffered by the Purchaser as a result of the
Sellers failure to comply with such law.
9. ASSIGNMENT.
Neither party shall assign, transfer, or conveythis order, or any monies due
or to become due hereunder without the prior writion consent of the other
party.
10. TITLE.
The Seller warrants full, clear and unrestricted title to the Purchaser for all
equipment, materials, and Items furnished in performance of this agreement,
free and clear of any and all lien, restrictions, reservations, security interest
encumbrances and claims of others.
11. NONWAIVER.
Failure of the Purchaser to insist upon strict performance of the terms and
conditions hereof, failure or delay to exercise any rights or remedies provided
herein or by law, failure to promptly notify the Seller In the event of a
breach, the
acceptance of or payment for goods hereunder orapproval of the design,
shall not release the Seller of any of the warranties or obligations of this
purchase order and shall not be deemed a waiver of any right of the
Purchaser to Insist upon strict performance hereof or any of Its rights or
remedies as to any such
goods, regardless of when shipped, received or accepted, as to any prior
or subsequent default hereunder, nor shall any purported oral
modification or rescission of this purchase order by the Purchaser
operate as a waiver of any of the terms hereof.
12. ASSIGNMENT OF ANTITRUST CLAIMS.
Seller and the Purchaser recognize that in actual economic practice,
overcharges resulting from antitrust violations are in fact home by the
Purchaser. Theretofore, for good cause and as consideration for
executing this purchase order, the Seller hereby assigns to the
Purchaser any and all claims it may now have or hereafter acquired
under federal or state antitrust laws for such overcharges relating to the
particular goods or services purchased or acquired by the Purchaser
pursuant to this purchase order.
13. PURCHASERS PERFORMANCE OF SELLERS OBLIGATIONS.
If the Purchaser directs the Seller to correct nonconforming or defective
goods by date to be agreed upon by the Purchaser and the Seller, and
the Seiler thereafter indicates its Inability or unwillingness to comply, the
Purchaser may cause the work to be performed by the most expeditious
means available to it, and the Seller shall pay all costs associated with
such work.
The Seiler shall release the Purchaser and its contractors of anytierfrom
all liability and claims of any nature resulting from the performance of
such work.
This release shall apply even in the event of fault of negligence of the
Party released and shall extend to the directors, officers and employees
of such parry.
The Settees contractual obligations, including warranty, shall not be
deemed to be reduced, in anyway, because such work is performed or
caused to be performed by the Purchaser.
14. PATENTS.
Whenever the Seller is required to use any design, device, material or
process covered by letter, patent, trademark or copyright. the Sellershall
indemnity and save harmless the Purchaser from any and all claims for
infringement by reason of the use of such patented design, device,
material or process in connection with the contract, and shag Indemnity
the Purchaser for any cost, expense or damage which It may be obliged
to pay by reason of such infringement at any time during the prosecution
or after the completion of the work. In case said equipment. or any part
thereof or the intended use of the goods, is in such suit held to constitute
infringement and the use of said equipment or part is enjolned, the Seger
Shall, at its own expense and at its option, either procure for the
Purchaser the right to continue using will equipment or parts, replace
the same with substantially equal but non-infdnging equipmem, ormodi fy
It so it becomes non -infringing.
15. INSOLVENCY.
If the Seller shall become insolvent or bankrupt, make an assignment for
the benefit of creditors, appoint a receiver or trustee for any of the Sellers
property or business, this order may forthwith be canceled by the
Purchaser without liability.
16. GOVERNING LAW.
The definitions of terms used or the Interpretation of the agreement and
the rights of all parties hereunder shall be construed under and governed by
the laws of the State of Colorado, USA.
The following Additional Conditions applyonly in cases where the Seller is to
perform work hereunder, including the services of Sellers Representative(s),
on the premises of others.
17. SELLERS RESPONSIBILITY.
The Sellershail carry on said work at Selleesown risk until the same is fully
completed and accepted, and shall, in case of any accident, destruction or
injury to the work and/or materials before Settees final completion and
acceptance, complete the work at Settees own expense and to the
satisfaction of the Purchaser. When materials and equipment are furnished
by others for installation or erection by the Seller, the Seiler shall receive,
unload, store and handle same at the site and become responsible therefore
as though such materials and/or equipment were being furnished by the
Seiler under the order.
18. INSURANCE.
The Seiler shall, at his own expense, provide for the payment of workers
compensation, including occupational disease benefits, to its employees
employed on or in connection with the work covered by this purchase order,
and/or to their dependents in accordance with the laws of the state in which
the work is to be done. The Seller shall also carry comprehensive general
liability including, but not limited to, contractual and automobile public liability
insurance with bodily injury and death limits of at least $300,000 for my one
person, $500.000 for any one accident and property damage limit per
accident of $400,000. The Seller shall likewise require his contractors, it any,
to provide for such compensation and insurance. Before any of the Sellers or
his contractors employees shall do any work upon the premises of others,
the Seller shall furnish the Purchaser with a certificate that such
compensation and insurance have been provided. Such certificates shall
specify the date when such compensation and insurance have been
provided. Such certificates shall specify the date when such compensation
and insurance expires. The Seller agrees that such compensation and
insurance shall be maintained unfit after the entire work Is completed and
accepted.
19. PROTECTION AGAINST ACCIDENTS AND DAMAGES.
The Seller hereby assumes the entire responsibility and liability for any and
Sit damage, loss or injury of any kind or nature whatsoever to persons or
property caused byor resulting from the execution of the work provided for in
this purchase order or in connection herewith. The Seger will indemnifyand
hold harmless the Purchaser and any or all of the Purchasers officers,
agents and employees from and against any and all claims, losses,
damages, charges or expenses, whether direct or indirect, and whether to
persons or property to which the Purchaser may be put or subject by reason
of any act, action, neglect, omission or default on the part of the Seller, any
of his contractors, or any of the Sellers or contractors officers, agents or
employees. In case any suit or other proceedings shall be brought against
the Purchaser, or its officers, agents or employees at any time on account or
by reason of any act, action, neglect, omission or default of the Seller of any
of his contractors or any of its or their officers, agents or employees as
aforesaid, the Seller hereby agrees to assume the defense thereof and to
defend the same at the Sellers own expense, to pay any and all costs,
charges, attorneys fees and other expenses, any and all judgments that may
be incurred by or obtained against the Purchaser or any of its or their
officers, agents or employees in such suits or other proceedings, and in case
judgment or other lien be placed upon or obtained against the property of the
Purchaser, or said parties in or as a result of such suits or other proceedings,
the Seller will at once cause the same to be dissolved and discharged by
giving bond or otherwise. The Seller and his contractors shall take all safety
precautions, furnish and install all guards necessary for the prevention of
accidents, comply with all laws and regulations with regard to safety
Including, but without limitation, the Occupational Safety and Health Act of
1970 and all miss and regulations issued pursuant thereto.
9/90
Revised 11191
izzSOLOMOWCORPORAT-10WO
ow4.o-,awumFrca'mu 2377 Leland Avenue www.solomoncorp.com Toll Free 800-234-2867
vowwrw tnmkmwisaua: Grand Junction, Co. 81505 Fax 785-655-2502
CITY OF FORT COLLINS
7245 Transformer Repair
BID PROPOSAL
1. List of Testing Equipment Utilized by Solomon Corporation:
Meg Ohm Insulation Resistance Tester (Biddle)
Turns Ratio Tester (Biddle)
Single and Three Phase Loss Test Equipment (Hypotonics & Solomon) for measuring no-load
losses, excitation current, full -load losses, impedance, induced potential, and applied potential
2. Bid Requirements
2.1 Required Information
2.1.3 Paint & Prep Procedures are attached.
2.1.4
- References
Southeast Colorado Power, LaJunta, CO
Dave Malott @ 719-384-2556
Morgan County Rural Electric Association
Randy Menking @ 970-867-5688
Garkane Energy
Cole Twitchell @ 435-735-4288
Solomon Corporation is an authorized Cooper Power Systems and
United Utility Supply repair shop.
Approximate number of transformers repaired in;
2009 - 14,066 units
2010- 13,292 units
3.1. Warranty
Recondition Repair 24 Months
Rewind Repair 36 Months
3.4. Shipment
A minimum of 15 transformers per pick up.
3.6.1. Quality Control —Work Order Tracking
Each unit is given an IC# when received at Solomon Corporation and the IC# is
tracked through the system (Syspro) from receiving to transportation for
shipment.
3.62. Quality Control — Protected Processes
• Electrical testing of transformers is completed at the end of assembly areas
and is separated by interlocked expandable barriers to insure safe distances
and security from assembly areas.
• Small core and coil repairs are completed in the winding shops separated
from heavy welding operations. This separation is achieved through barrier
walls, engineering controls / separation of buildings.
• Larger windings are completed in an air conditioned environment controlled
facility.
3.6.3. Quality Control — Repair & Rewind Procedures are attached.
3.6.3.1. Solomon Corporation uses thermally upgraded B-Stage Epoxy Coated
insulation paper. Solomon purchases our paper insulation in roll form.
3.6.3.2. The core and coil assembly is placed in the oven and baked
at 250' F.
3.6.3.3. Units are baked for a minimum of 12 hours to insure proper
bonding.
3.6.3.4. Solomon Corporation fills the transformers from the top while the lid is
off the unit. We do not vacuum fill our distribution transformers.
3.6.4. Leak Testing
• Depending on the unit type negative pressure achieved prior to
introduction of nitrogen.
• Units are pressurized and monitored by regulator for possible leaks.
• Soaps or other agents are then utilized for visual inspection as needed.
• Refer to Solomon Corporation quality assurance guide attached.
3.6.5. Procedure for prevention of cross -contamination between pcb and non-pcb oil.
• PCB contaminated equipment are not repaired at this facility.
• PCB contaminated equipment are designated as disposal only.
• PCB oil is not stored at the assembly facilities.
• All incoming equipment (Repair or Recycle) is initially received at our
Commercial Storage facility. Labs verified and oil pumped and segregated
prior to transfer to a repair facility.
• Reference Kansas Audit Package attached.
• Reference receiving procedures attached.
3.6.6 Environmental Audit
e All current audits referenced in Kansas Audit Package attached.
4431 nOMON RATIONZ17
Powerful Transformer Solutions
Emhh.n . 1971 785-655-2191
103 West Main Street FAX 785-655-2502
Solomon, Kansas 67480 w .solomoncorp.com Toll Free 800-234-2867
Paint & Prep Procedures
1. The exterior of the transformer and interior of the cabinet are thoroughly cleaned by
steaming or washing with a combination of soap and water or solvents.
2. After it is determined the tank is clean of all dirt, grease, oil or other contaminants the
gauges, bushings, ground pads and other accessories are masked off.
3. The exterior of the entire unit and cabinet interior are them sanded or sandblasted if
necessary to remove all rust, old paint runs or peeling paint.
4. Prior to applying the primer the unit is thoroughly wiped down to remove all dust
particles resulting from the sanding. The transformer is then inspected to make certain
it is clean and all imperfections have been removed.
5. The entire unit is then primed with one MIL thickness of primer to cover all bare
metal.
6. The unit is then painted with a top coat of ANSI Munsell green paint . A thickness of
2 MIL top coat is applied to the entire transformer. The transformer is required to
have a minimum 3 MIL total thickness.
7. The transformer is air dried until the paint has dried and cured. All masking tape used
in the paint preparation is then removed.
8. Undercoating is applied to the bottom of the tank and three inches up the sides of the
tank and cabinet.
9. All necessary stenciling, decals and nameplates are then applied in the appropriate
places.
10. The transformer is then inspected for missed areas, paint runs and overspray.
�� i DSO OMOHORPO ; A T ONQ
Powerful Transformer Solutions
Esu�sneJ t97t
103 West Main Street 785-655-2191
Solomon, Kansas 67480 www.solomoncorp.com FAX 785-655-2502
DISTRIBUTION TRANSFORMER
RECONDITIONING PROCEDURES
Solomon Corporation transformers are reconditioned to meet the highest quality
standards. Our testing standards meet or exceed the standards of the American National
Standards Institute (ANSI) as well as those of new manufacturers.
The reconditioning process begins by determining the current condition of the
transformer. Two preliminary tests are run on the unit, Turn Ratio Test and Megohm
Test. The first test checks the ratio of primary to secondary turns and polarity. The
Megohm Test gives an indication of the quality of insulation as well as the presence of
moisture in the coil. If the results of these tests and the initial visual internal inspection
are deemed satisfactory, the recondition process begins.
The process starts by removing any remaining transformer fluid. A visual inspection is
then completed to insure that the core and coil assembly is intact, all components are in
good working order and all clearances to ground are up to specifications.
All bushings and external switches are removed and closely inspected for damage
(cracks, chips, carbon, etc.). Any components found to be defective will be, whenever
possible, replaced with original manufacturers' components. If replacement parts are not
available from the original manufacturers, we utilize components manufactured by the
RTE Corporation of Pewaukee, Wisconsin and Warco, Inc. of Marthasville, Missouri.
If needed, the core & coil assembly is untanked and placed in a drying oven for 8-12
hours to remove all moisture.
To insure proper sealing of the transformers new gaskets and o-rings are used in the
reassembly process. New pressure relief valves are added to the transformer to insure
proper venting.
Prior to refilling the transformer, the core and coil assembly is flushed and cleaned. The
flush fluid is then removed and the unit is filled to the proper level. Leak tests are
performed following lid placement and then the unit proceeds to the test area.
Technicians perform the following tests on the transformer prior to releasing it to the prep
and paint area.
* TTR
* Meg Ohm
* Excitation
* No Load Loss
* Full Load Loss
* Impedance
* Applied Potential
* Induced Potential
After successfully passing the required tests the transformer is then released to our prep
and paint area. The first step in this process is sanding and cleaning the tank.
The tank is then primed and painted with acrylic enamel to a minimum of 3 MIL
thickness. All required labels, decals and nameplates are then attached to the transformer.
The transformer is inspected to ensure the work completed matches the work order and
that there are no external manufacturing defects.
Recondition Procedures Rich Schneider 9/10/09
TABLE OF CONTENTS
Invitation to Bid
2 pages
Bid Sheet
1 page
Supplemental Instructions
1 page
Specification 368-595
16 pages
Terms and Conditions
2 pages
DSO LOMONCORPORATION'
Powerful Translormer Solutions
Esutt 5tXY11971
103 West Main Street 785-655-2191
Solomon, Kansas 67480 %vwi.solomoncorp.com FAX 785-655-2502
REMANUFACTURING PROCEDURES
Solomon Corporation transformers are designed and built to meet the highest quality standards.
Our testing standards meet or exceed the standards of the American National Standards Institute
(ANSI) as well as those of new manufacturers.
The remanufacturing process starts with the removal of the core and coil assembly from the tank.
The core steel is dismantled and the old coil is discarded. The core steel is cleaned and inspected
for damage caused by electrical stresses or general poor quality. If determined to be of good
quality, the design process begins.
The design process is initiated by careful measurement of the existing core steel. Based on these
measurements and loss criteria of the customer, a computer generated coil design is created.
This design is specific to the individual transformer based on voltage and KVA rating, keeping in
mind the original manufacturers specifications. A new coil is then wound to the specific design
criteria.
The winding process utilizes the highest quality materials. We use new Essex copper magnet
wire with a heavy Formvar (105' C) coating. We selected the heavy Formvar coating over the
lighter filmed wire because of the superior turn -to -turn short circuit capability. Essex heavy
Formvar wire is manufactured in Fort Wayne, Indiana exclusively for the transformer industry.
During the bake out process, the epoxy bonds the wire to the paper further increasing the short
circuit strength of each coil.
Following the winding process, the core steel is assembled around the new coil. The core and
coil assembly is then placed in our oven and baked at 250' F for a minimum of 12 hours to insure
proper bonding. The core and coil assembly is then removed from the oven hot and placed
directly into the transformer tank. The tank is then filled with oil to eliminate absorption of
moisture from the atmosphere as it cools. Only new PCB -Free
(0 ppm) oil is used in transformers rebuilt by Solomon Corporation. All oil must pass a 32 KV
dielectric test prior to use. Transformers in voltage classes above 15 KV will be filled under
vacuum.
During the rebuilding process any components (bushings, switches, etc.) found to be defective
will be, whenever possible, replaced with original manufacturers' components. If replacement
components are not available from the original manufacturers, we will utilize components
manufactured by the RTE Corporation of Pewaukee, Wisconsin and Warco, Inc. of Marthasville,
Missouri.
To insure proper sealing of the transformers, new Nitril Buna N-70 gaskets are used in the
reassembly process. New pressure relief valves are added to the transformers, which are
manufactured by Qualitrol Corporation of Fairport, New York. Prior to electrical testing, the
unit will be leak tested.
Solomon Corporation Quality Assurance
Painting
Customer:
0
Sales Person:
0
Unit #:
0
Sale:
Re air:
KVA:0
Recondition:
I Rewind:
Pri. Voltage:
0
Serial Number:
0
Sec. Voltage:
0
I.C. #:
0
Make: 0
Painting Prep
Initial Date
Sandblasted tank if required or requested
(If blasted, primered immediately.)
Look over unit for leaks
Contact Controls to ensure that all excess brackets are removed
and if any brackets need to be added
Final tank prep to paint
Wash
Sand
Bondo
All gauges, bushings, etc. masked off for painting as required:
Look over unit for leaks
Unit inspected before paint by Lead/ Supervisor: Date:
Painting
Initial Date
Look over unit for leaks
Apply rust preventor on all welds
All bare metal has received primer before painting if required:
Applies minimal of 4 coat of paint
Lift unit and paint bottom of radiators, bottom edge of tank
and anything thing that you can't paint otherwise
Ensure that unit is undercoated as needed
Final inspection of paint prior to leaving paint booth.
Unit inspected before stencil by Lead/ Supervisor: Date:
Stenciling
Initial
Date
Match the job to the unit
Inspect unit
Paint errors
Leaks
Prep
Mil thickness
Removed all masking tape from unit,
Paint pg 1 of 2
Apply all stencils Initial Date
Primary
Secondary
Diamond
KVA
Tap Changer
Dual Voltage
Delta -Wye
Enviromental
Any Special labels
All identifying tags have been installed and checked:
Install flag on explosion relief
Re -installed any parts removed for paint
Ensure that all parts are acconted for,pained and ready to ship
according to the special instruction and the parts location list.
Check the oil level
Main
LTC
Check pressure
Main Pressure
LTC Pressure
Ultra violet protectant applied to nameplate:
Unit is now complete and ready for final Q.C. inspection:
Comments:
Completed by: Date:
Supervisor: Date:
Paint pg 1 of 2
Final Prep For Shipment
Customer:
Enter Data
Sales Person:
0
Unit #:
0
Sale:
Re air:
KVA:0
Recondition:
Rewind:
Pri. Voltage:
0
Serial Number:
0
Sec. Voltage:
0
I.C. #:
0
Make: 0
Unit's weight checked
Initial Date
Match job number and IC number to unit
Reviewed pages 1,2 and 3
Perform tests
Initial
Date
Exciting test
Doble test
TTR test
Meg test
Resistance test
Hypot
No Load
400 hurtz
Full Load
Received final test approval before proceeding with final prep:
Final Prep
Initial Date
Pull oil sample and or DGA out of bottom drain valve
Reviewed receiving report & pictures for shipping information:
Unit ships with: Oil Dry Air
Checked to see if bushings and sudden pressure relay
are to be removed:
Removed required bushings, checked condition of gasket
(replaced if damaged) and tied bushing lead to ship plate:
Bushing ship plates bolted down, and bushings installed into
existing or new ship crates, along with gaskets, caps and pins:
Repressure to 3 psi
Fill out Parts Location sheet
Parts Location sheet given to supervisor to send out
If Unit Ships with no Oil
Oil removed
Pressured unit to 3 psi
Check for leaks
Inspection team notified for final inspection:
Test Page 1 of 3
Located & identified all parts & accessories that ship with unit by using the following list:
Customer
Job Number
Qty Emolovee Size whrs pallett unit
HV Bushings
gaskets
caps
pins
bolts
nuts
washers
lock washers
External connectors
LV Bushin s
gaskets
caps
pins
bolts
nuts
washers
lock washers
External connectors
PrimaryArrestor
bolts
nuts
washers
lock washers
Secondary Arrestor
bolts
nuts
washers
lock washers
Primary Arrestor Bracket
bolts
nuts
washers
lock washers
Seconda Arrestorbracket
bolts
nuts
washers
lock washers
Fins
bolts
nuts
washers
lock washers
Fin Braces
bolts
nuts
washers
lock washers
Check Flapper Valves
LTC Free Breather Caps
Bolts screw into ground plate
Buss work
Fans
Number of palletts Number of box's
marked 4 sides Banded
Test Page 2 of 3
now
All accessories that require painting have been sent to
Paint Shop
Main unit has been moved to Paint Shop:
Pallet(s) moved to warehouse
Copy of Parts location sheet attached to pallet
Completed by: Date:
Supervisor: Date:
Page 3 of 3
USOLOMORtORPORATION
00 Powerful Transformer Solutions
Estahllshed 1971 785-655-2191
103 West Main Street FAX 785-655-2502
Solomon, Kansas 67480 www.solomoncorp.com Toll Free 800-234-2867
Facility Audit Package
Solomon, Kansas
Contact: Mike Dahl
Title: Corporate EH&S Manager
Telephone: 1-800-234-2867, Ext 191
Revised: May 16, 2011
Solomon Corporation Faculty Audit Package — Solomon, KS
Page 2 of 20
Mission Statement
We create customized solutions for the electrical distribution industry. Our growth and success
demand a commitment to provide our customers with flexibility, a wide range of products, and
unmatched technical service.
An Overview of Solomon Corporation
Today
Solomon Corporation in Solomon, Kansas, is a premier distribution electrical transformer company
that conducts business with utility companies nationwide. These customers include municipalities,
rural electric cooperatives and investor -owned utilities, as well as industrial users. Solomon
Corporation has contracts with some of the largest utilities in the nation including TXU, Xcel
Energy, Nevada Power, Oklahoma Gas and Electric, and Consumers Energy.
Products include transformers (polemount, padmount and substation), voltage regulators and oil
circuit reclosers. Other services provided by Solomon Corporation are performed by field service
crews, expanding the company's capabilities within the industry. These crews provide customer site
testing, maintenance and repair of electrical equipment as well as dismantling and reclamation of
oversized transformers, some individually weighing as much as one million pounds.
The Beginning
Three partners went into the business of repairing and selling electrical transformers. They were
seeking a central United States location and began to canvass the Midwest, particularly Kansas, for a
small town in which they could start their shop. The proximity of I-70 for transportation and the
broad customer base offered by many rural electric cooperatives and municipalities in Kansas and
neighboring states supported the choice of Solomon. On April 1, 1971, Solomon Electric Supply
began operations with six employees.
Growing Years
Within three years, the company's employment had risen to 30 people. For a few years the company
struggled while it sought to create a market niche with a high quality transformer product. The early
1980s brought a new focus on quality products and exceptional customer service, the building
blocks of today's Solomon Corporation.
In 1987, the company found its mark and began to achieve considerable growth in sales. Annual
sales reached $3.4 million with 60 employees. This time period also showed a substantial growth in
facilities at Solomon. Buildings were upgraded and new facilities added.
Solomon Corporation Faculty Audit Package — Solomon, KS
Page 3 of 20
Growth in the 90s
1991 saw the opening of a new, state-of-the-art transformer reclamation facility in Solomon. This
31,600 square feet facility alone is over five times the size of the original Solomon Electric building.
Efficiencies have been achieved through streamlined production capabilities and innovative process
development. Today, in addition to sales of remanufactured units, transformer reclamation (the
recovery of metals from salvage transformers) also provides significant revenues to the company.
Metals recovered include copper, aluminum, steel and brass.
The early 1990s also brought three major building projects to the manufacturing facilities. As a
result, this increased the quantity of the units manufactured and expanded our capacity to produce
power class substation -type transformers.
A branch facility in Decatur, Tennessee began operation in January 1996. This was initially
developed to funnel product to the Kansas location to insure continued growth and maintain a
competitive edge in a freight intensive business. Based on customer demand, this facility has
expanded and currently provides transformer, regulators and reclosers sales and service as well as
reclamation services.
New Ownership / Continued Growth
In November of 2000, Solomon Corporation's primary founder sold controlling interest in the
company to his five adult children. All five are actively engaged in the management and operations
of the company. Under the new ownership team Solomon Corporation has continued to grow and
improve.
In January, 2005 Solomon Corporation purchased Western States recloser repair in Grand Junction,
Colorado. This facility focuses on oil circuit recloser and voltage regulator sales and servicing.
In 2007, Solomon Corporation formed an alliance with the Texas Electric Cooperatives for the
operation of its repair and reclamation facility in Georgetown, Texas. Today Solomon Corporation
employs over 430 people at four locations and has annualized sales of over $100 million.
Solomon Corporation Faculty Audit Package — Solomon, KS
Page 4 of 20
Company Information
Corporate Office: 103 W Main Transformer Repair & Remanufacturing
PO Box 245 Operations began April 1971
Solomon KS 67480 75, 000 sq ft
Phone: 785-655-2191
Fax:785-655-2502
Reclamation: 302 W 71h Street Facility constructed September 1991
Solomon KS 67480 39,000 sq ft
Phone:785-655-2191
Fax:785-655-2502
EPA ID No. KSO 002 431 880
PCB Commercial 302 W 71h Street Facility constructed January 2008
Storage Facility: Solomon, KS 67480 23,735 sq ft
Phone: 785-655-2191
Fax: 785-655-2502
EPA ID No. KSO 002 431 880
Permit Renewable: 08/21/2012
Branch Location: Hwy 58 South Transformer Repair
PO Box 1009 OCR & Regulator Repair
Decatur TN 37322 Reclamation
Phone: 423-334-2666 24,000 sq ft
Fax:423-334-2662
EPA ID No. TNO 001 577 485
Branch Location: 2377 Leland Avenue OCR and Regulator Repair
Grand Junction, CO 81505 7, 000 sq ft
Phone:970-241-0721
Fax: 970-243-2902
Branch Location: 100 Cooperative Way Transformer Repair
Georgetown, TX 79626 Reclamation
Phone: 877-869-8610 100, 000 sq ft
Fax:512-763-3360
KS Taxpayer No. 18-0689
Dunn & Bradstreet No. 05-475-7646
Federal ID No. 48-0777539
FIRM NAME:_Solomnn_Corporaton_
CITY OF FORT COLLINS
BID PROPOSAL
BID NO.7245 Transformer Repair
BID DATE: 3:00 p.m. (Our clock) June 14, 2011
We hereby enter our bid for the City of Fort Collins' requirements for TRANSFORMER
REPAIR for one calendar year (July 1, 2011 to June 30, 2012 with an option by the City of Fort
Collins to renew up to four additional years) per the bid invitation and any referenced specifications:
Specification No: 368-595, (consisting of 13 pages).
Bid Proposal Form consists of: Schedule I -A
Schedule I-B
Schedule II -A
Schedule II-B
Schedule III
Schedule IV
Schedule V
Schedule VI
These Bid Proposal schedules are included as Page 9 through 16 of Specification 368-595, Rev. D
and shall be returned with this page of the bid proposal.
In addition, your bid shall include:
1) Include a list of testing equipment utilized by your firm.
2) All items requested in paragraph 2.1 of Specification 368-595, Rev. D.
Clarification: Please include the approximate number of transformers your firm repaired in
2009 - 14,066
2010- 13,292
3) 3.4 shipment. If this requirement is not possible, please state current response and delivery for
non -emergency repair on all units. 2 - 4 weeks
PLEASE BE SURE THAT YOU HAVE INCLUDED ALL ATTACHMENTS REQUIRED WITH THIS
BID PROPOSAL.
Solomon Corporation Faculty Audit Package — Solomon, KS
Page 5 of 20
NAICS Code: 335311 —Manufacturing Facility
NAICS Code: 423930 — Recyclable Material Wholesalers (Reclamation)
Regulatory Contacts
US EPA Region VII
901 N 5`� Street
Kansas City KS 66101
Mazzie Talley, Branch Lead
913-551-7395
Permits
Kansas Dept of Health & Environment (KDHE)
2501 Market Place
Salina KS 67401
Jennifer Nichols, District Administrator
785-827-9639
Toxic Substances Control Act (TSCA) Polychlorinated Biphenyls (PCB)
Commercial Storage Facility
Class 1I KDHE Air Source Operating Permit No. 0410020
Industrial Activity Stormwater Permit — Manufacturing Facility
KS Permit No. G-S039-0001 Federal Permit No. KSR000348
Industrial Activity Stormwater Permit — Reclamation Facility
KS Permit No. G-S039-0002 Federal Permit No. KSR000349
Financial
Bonding Company: Sunflower Insurance Group
217 S Santa Fe Avenue
Salina KS 67401
785-825-0286
Bank Reference: Sunflower Bank Solomon State Bank
2070 S. Ohio St. 126 West Main
Salina KS 67401 Solomon KS 67480
785-827-5564 785-655-2941
Credit Reference: Warco Robson Oil
Route 2 PO Box C
Marthasville MO 63357 Abilene KS 67410
314-433-2212 785-263-2503
Solomon Corporation Faculty Audit Package — Solomon, KS
Page 6 of 19
Powerful TrahSfOrhlOr SOIUflOnS Established 1971
�'�"�"�"^^-rvrvw.rdomoncory.rom
Insurance Coverage
Type of Insurance Carrier
Policy number Limit ESPiration
connnenial General
$2,000,000 General Aggregate omit 5/l/2012
Liability& cham, Specialty
$2.000,000 Products Completed Operations Aggregate Limit
Pollution legal Liability Insurance Company
$1,000,000 Each Occurrence Limit
IM02270 $1,000,000 Personal & Advertising Nlury Limit
$1,000,000 Pollution Legal Liability Limit
$1,000,000 Additional Pollution Legal Liability limit
$300,000 Damage to Rented Premises Limit
$25,000 Mediral Expense Limit
Travelers Property
Automobile Liability casualty Laurance of
America
Workers Compensation hrich American
❑nsurance Company
Umbrella Liability Chants Specialty
Insurance company
5/1/2012
V-810-5172M673-M.-10(ADS &n) $1,000,000 Combined Single Limit
$1.000,000 E.L. Each Accident 5/1/2012
WC6540083-01 $1,000,000 E.L. Each Disease - Each Employee
$1,000,000 E.L. Disease- Policy Limit
IM03417 $15,000,000 Each Occurrence limit 5/1/2012
$15,000,000 Aggregate Limit
rrs ustimz wLmfx prenry
Solomon Corporation Faculty Audit Package — Solomon, KS
Page 7 of 20
List of Active Disposal Facility Customers
Xcel Energy/PSC We Energies
9500 Interstate 76 231 W. Michigan St.
Henderson, CO 80640 Milwaukee, WI 53203
303-628-2874 414-221-4884
Rebecca Dettmering Rob Hubert
Xcel Energy/NSP Consumers Energy
8701 Monticello Lane 1315 Wright Ave.
Maple Grove, MN 55369 Alma, MI 48801
763-493-1868 989-466-4228
Pete O'Keefe Bob Rombach
Sierra Pacific Power Co. OnCor
11 Ohm Place 2471 S. Dallas Avenue
Reno, NV 89502 Lancaster, TX 75146
775-834-7660 972-218-4065
Todd Brackett Rod Kinard
Salt River Project Omaha Public Power
Mail Station KYS102 444 S. 161h St. Mall
Phoenix, AZ 85072-8754 Omaha, NE 68102
602-236-8754 402-636-2304
Kelly D. May Richard Varner
Solomon Corporation Faculty Audit Package — Solomon, KS
Page 8 of 20
Environmental Setting
Solomon Corporation is located in an industrially zoned, 23 acre site on 7`h street in Solomon, Kansas.
The acreage dedicated to transformer reclamation is 5 acres. The previous use of the property was
strictly agricultural. To the North and West of the property is agricultural. A commercial business is
to the East which consists of a propane gas distributor. A residential area is located to the South of the
property.
About 1,075 people live within a one mile radius and 1,175 within a three mile radius. The nearest
public facility is the school which is a one-half of a mile away.
Solomon's reclamation facility is not in the 100-year flood plain. The nearest waterway, the Solomon
River, is approximately one mile from the facility. The nearest lake is Milford Reservoir located 45
miles away. The average annual rainfall is 27 inches. City drinking water comes from five ground
water wells; the closest one is approximately '/4 mile from the facility. The water table is
approximately 60 feet.
Laboratory
The goal of Solomon Corporation Laboratory is to produce data of the highest quality for compliance
with 40 CFR Part 761. The laboratory has a policy to ensure its personnel are free from any
commercial, financial and other undue pressures which might affect the quality of work. The
laboratory has a Quality Assurance Plan and Standard Operating Procedures in place to ensure
laboratory personnel follow standards.
The Kansas Department of Health and Environment has issued NELAP accreditation Certificate No.
E-10345 for EPA Method 8082: PCB-1016; PCB-1242; PCB-1254; PCB-1260.
Solomon Corporation Faculty Audit Package — Solomon, KS
Page 9 of 20
Site Security Measures
Facility Operations
Security is provided by a 6-foot chain -link fence topped with barbed wire which runs along the
facility's boundaries. Routes of entry to the facility are secured by doors and gates. Entry to the
processing areas is through the central office area. The gates accessing the parking area are locked at
the end of each work shift and remain locked throughout the night until normal work starts the next
business day.
In addition, all exterior doors are locked when the facility is not in operation. Keys are issued to
authorized personnel only. Visitors, contractors, sales persons, etc. entering the facility must be
accompanied by an authorized member of the management staff. During business hours, access to
visitors and drivers is provided through the main office area only.
Materials Storage
Due to the above -mentioned security precautions, the threat of vandalism is minimized. Access to
facility storage and handling areas, as well as the equipment and storage devices found in those areas,
is restricted to authorized personnel only. All piping is routed overhead throughout the building.
Storage areas and oil tanks are all above ground and are located within the building itself.
Solomon Corporation Faculty Audit Package — Solomon, KS
Page 10 of 20
Waste Acceptance
Can we
l
PCB -Contaminated (Drained)
PCB -Contaminated Full
10,000 lbs..
YES, if less than
Untested Units
YES, if
1„less. than
,..
,
Clean-up Debris
®�
i Drummed Oil
®�
, ..
CapacitorsPCB
®�
..
•
�®
ppin
RCRA Wastes (solvents, pa int
Asbestos -bearing
INEN
100 INS
Batteries
Automotive Wastes (motor oil ,
etc)
WOMEN
1001
Freon -filled Equipment 0
*If unit weighs more than 10,000 Ibs, we have other options, like sampling onsne, or pumping on site. rtease contact tsnvironmemai wept. for options.
Solomon Corporation Faculty Audit Package'— Solomon, KS
Page I 1 of 20
PCB Commercial Storage Facility
Operational Process Description
The facility is designed to receive electrical equipment, primarily transformers that contain varying
concentrations of PCBs. PCB transformers and equipment are segregated and prepared for shipment to
appropriate disposal companies. Non -PCB and drained PCB contaminated equipment are processed
through the reclamation facility.
Equipment arrives at the facility on trucks. The trucks are unloaded within the covered unloading area,
utilizing overhead cranes to lift the equipment from the truck bed onto conveyors. The conveyors move
the equipment into the containment area of the facility. All waste management activities, including
sampling, draining, and regulated material storage take place within the curbed, sealed containment
area. Access to the containment area is limited to authorized personnel only. Personnel working within
the containment area wear safety apparel appropriate to the activities being performed.
The equipment is received and verified with the shipping documentation. Any discrepancies are noted
and addressed at this time. Each unit is assigned a unique Inventory Control (IC) Number. All pertinent
unit information is recorded and later entered into the database to be maintained as a part of the facility
records.
If the equipment needs to be tested for PCBs a tag is placed on the unit that identifies it as untested. It is
then moved to the PCB testing area for sampling. The units are then sampled and analytical performed
by the PCB testing laboratory. Upon receipt of the analytical results, the unit is re -tagged and moved in
accordance with its classification.
If the unit has been tested for PCBs prior to arrival, it is tagged and moved to an area of the facility
appropriate to its classification.
Equipment classified as Non -PCB (less than 50 ppm), is moved to the Non -PCB conveyor. Any units
containing oil are drained. The oil is pumped into bulk storage tanks designated as Non-PCBJIuid
located within the Oil Storage Berm. Once the units are drained they are evaluated as to their potential
to be rebuilt unless disposal only is specified by the customer. Units determined to be rebuild candidates
move to the rebuild inventory trailer. The remaining Non -PCB units move to the Reclamation facility
via conveyor.
Equipment classified as PCB -Contaminated (50 to 499 ppm), are tagged as PCB- Contaminated and are
moved to the PCB holding area. Each unit is weighed. The generator name, storage date, weight and
ppm is recorded on each unit. Units containing oil are drained. The oil is pumped into bulk storage
tanks designated as PCBJI uid - 50 to 499 ppm, located within the Oil Storage Berm. The quantity of oil
removed from each unit is recorded on the tank log. Once these units are drained, they are moved to the
Reclamation facility 50 to 499 high -part processing line via conveyor.
Solomon Corporation Faculty Audit Package — Solomon, KS
Page 12 of 20
After the contaminated drained units have been moved to the Reclamation facility and placed on the
high -part processing line, they are rinsed three times with an oil volume that is a minimum of 10% of
the unit's total volume. The first of the three rinses consists of the unit being filled to a point above the
normal operating oil level of the unit. A hole is punched in the bottom of the unit allowing the oil to
drain. The unit is then rinsed two more times with a volume of oil that is at least 10% of the total
volume of that unit. Sufficient time is allowed between rinses for the oil to drain from the unit.
Every 15'h unit to be processed on the high part line has two quality control parameters performed. An
aliquot of the rinse oil is taken for analysis by Gas Chromatography (GC) to determine the PCB level. If
the result is greater than 25 ppm, the tank is pumped and filled with fresh rinse oil. A wipe test is
performed to confirm that the decontamination procedure is properly functioning. The 151h unit has the
wipe sample taken after the unit has been rinsed and allowed to drain. The sample is taken below the
normal operating oil level. After each of the above procedures is performed the appropriate log is filled
out. The logbook is checked weekly by the Environmental Department.
Equipment classified as PCB (500 ppm and greater), is tagged as PCB and then moved to the PCB
holding area. The unit is weighed. The generator name, storage date, weight and ppm is recorded on
the unit. All PCB units are held in the PCB holding area pending shipment to a TSCA-approved
disposal facility.
Waste other than oil filled electrical equipment (capacitors, drummed debris) is tracked through the
same receiving, sampling and documentation processes described above.
Pertinent information regarding all equipment and material testing over 50 ppm is recorded for
annual document preparation.
Sampling:
If there is a discrepancy between the unit and the customer provided lab results, the unit will be isolated
and Solomon personnel will extract an oil sample from the unit to verify the original analysis.
Discrepancies are determined by looking for inconsistent information:
• Lab report does not correspond to what is written on the unit
• Lab report does not correspond to labeling of unit
• Lab report does not correspond to nameplate information
• There are two different type of PCB labels on the unit
• Customer says it is nameplated NonPCB, but doesn't qualify under Solomon Corp policy
• Oil has an "off' smell indicating oil is not mineral oil
The samples will be analyzed by individual Gas Chromatography (GC) performed by Solomon
Corporation Laboratory utilizing EPA approved methods for analysis of PCBs.
Solomon Corporation Faculty Audit Package - Solomon, KS
Page 13 of 20
NonConforming Material:
Any equipment received into the facility that does not or is suspected of not conforming to the material
requirements will be immediately isolated, properly labeled and marked, then reported to the
Environmental Administrator's office for notification of the original generator. The unit will be stored
in the PCB Storage Area for disposal pending shipment to an EPA approved disposal facility.
Reclamation Process Description
Disassembly Process (0-49 ppm PCB)
Distribution:
After the draining process is complete, the transformer is moved by conveyor to the untanking area.
Within the untanking area all components are removed from the transformer tank including the core and
coil assembly. The components are forwarded via storage bins to the bushing processing area. The
bushings are crushed. The metals are recovered for shipment to smelters and the porcelain is sent to an
approved landfill.
The core and coil assembly is forwarded via overhead hoist to the teardown area. The transformer tanks
are then dusted with absorbent material and the nameplate is removed. The tanks are crushed and
loaded for shipment to smelters.
Once at the teardown area the core and coil assembly will be dismantled, separating the coil windings
and insulation from the core steel. The core steel will then be loaded for shipment to smelters. The coil
wire and insulation will be moved to the separation area.
Substations:
Substation transformers, due to their size, are placed in the substation untanking pit for the untanking
procedure. This allows for better access when removing the lid and insulators, particularly on taller
units. The unit is prepared for untanking by removal of the lid and insulators, disconnection of all
switches and removal of the mechanisms attaching the core and coil assembly to the tank.
The core and coil assembly is lifted from the tank by means of the 50-ton overhead crane and placed in
a steel containment pan for further disassembly. Any residual fluid is removed. The tank is dusted with
absorbent material and moved to the tank cutting area for cutting to size for shipment to smelters.
The disassembly process continues with further disassembly of the core and coil assembly by removal
of the coils and insulation from the core steel. The top portion of the core steel is removed manually,
and then the coils are pulled off the steel legs utilizing the overhead crane. The coils and insulation are
then moved to the separation area and the core steel is loaded for shipment to smelters.
Solomon Corporation Faculty Audit Package — Solomon, KS
Page 14 of 20
Disassembly Process (50-499 ppm PCB)
The disassembly process is the same as for 50-499 ppm units with these additional steps:
1) The distribution untanking takes place on a dedicated untanking line.
2) Prior to leaving the untanking area, the non -porous surfaces are decontaminated in accordance
with 40 CFR 761.79. This process involves triple rinsing with mineral oil. Each rinse will use
a volume equal to approximately 10 percent of the tank capacity.
3) The residual PCBs from the core and coil assembly and the other porous components will be
disposed in a scrap metal recovery oven in accordance with 40 CFR 761.72.
Separation
The coil wire, comprised of either copper or aluminum, is separated from the paper insulation by one of
two methods. The coils and insulation will be separated mechanically utilizing a process called
granulation. In this process the coils are fed into a Triple/S Dynamics Cable Recycling Plant; this
system performs the separation process by grinding the coils into granules and passing the granules
through a series of air separators yielding clean copper. (The 50 to 499 ppm core/coil assemblies will
be baked in the scrap metal recovery oven prior to granulation.)
In instances where mechanical separation is not feasible, the coil and insulation will be burned in the
scrap metal recovery oven. This process bums the paper off the coil wire. The scrap metal recovery
oven is operated under a permit issued by Kansas Department of Health and Environment. In both
cases the recovered copper and/or aluminum are shipped to smelters.
Waste Streams
Description Vendor Disposition
41 Copper PMX - Cedar Rapids, IA Smelted
Samuels Recycling — Madison, WI
Metal Exchange — St. Louis, MO
Premier Metals — Solon, OH
Bush Wellman — Elmore, OH
Kobe Copper — Pine Hall, NC
42 Copper Metal Exchange — St. Louis, MO Smelted
Manitoba Corporation — Lancaster, NY
Aluminum Metal Exchange — St. Louis, MO Smelted
Premier Metals — Solon, OH
Bodner Metals — Houston, TX
BID NO. 7245 Transformer Repair
SUPPLEMENTAL INSTRUCTIONS
Prices quoted must remain firm for a 30 day period after the opening date.
Freight terms: F.O.B. destination freight prepaid. All freight charges must be included in pricing
submitted on proposal and not entered as separate pricing.
Any discount allowed by Vendor for prompt payment, etc. must be reflected in quoted figure, and not
entered as separate pricing.
The City reserves the right to accept or reject any and all quotes.
Any questions or inquiries regarding this bid should be directed to:
Opal F. Dick, CPPO, Senior Buyer
(970) 221-6778
elf--, ,.ana f-/ Kevin Sweatland - Territory Manager
SIGNATURE AND TITLE TYPED OR PRINTED NAME AND TITLE
Solomon Corporation 800-234-2867/785-655-2502
COMPANY NAME (AREA CODE) TELEPHONE NUMBER/FAX NUMBER
103 W. Main, Po Box 245, Solomon, KS 67480 6/10/11
ADDRESS: STREET, CITY, STATE, ZIP DATE
ksweatland@solomoncorp.com
E-MAIL
Solomon Corporation Faculty Audit Package — Solomon, KS
Page 15 of 20
Brass Maher International — Barnaby BC Canada Smelted
Green Bay Inc. — Walnut, CA
AA Resources — Vancouver, BC, Canada
Aicon — Vancouver, BC, Canada
Mild Steel Glickman Recycling LLC — Wichita, KS Smelted
Silicone Steel
Cast Iron
Bushing Porcelain N.R. Hamm Landfill Class "D" Landfill
Paper Fluff PO Box 17
Ash Perry, KS 66073
KDHE Permit No. 394
Industrial Solid Waste Disposal Authorization
<50 ppm Oil Environmental Management of KC, Inc. Chemical Detoxification
Kansas City, KS 66111
EPA ID No.KSR 000 007 229
Hydrodec North America, LLC
2021 Steinway Blvd SE Canton, OH 44707
G&G Partners
306 Greeb Oaks Drive
League City,
50 - 499 ppm Solomon Corporation Scrap Metal Oven
Carcasses Source Permit No. 0410020
> 49 ppm Oil Clean Harbors (PPM) LLC
Debris >49 ppm Rt 3, Box 65
Coffeyville, KS 67337
EPA ID No.KSD 981 506 025
Veolia ES — Technical Solutions LLC
5736 W Jefferson Street
Phoenix, AZ 85043
EPA ID No. AZ0000337360
Capacitors US Ecology
Bushings PO Box 578
Beatty, NV 89003
EPA ID No. NVT 330 010 000
Energy Recovery
Incineration
Decontamination
Chemical Detoxification
Incineration
Chemical Detoxification
Incineration
TSCA Landfill
Solomon Corporation Faculty Audit Package — Solomon, KS
Page 16 of 20
Field Service
Solomon Corporation has performed field service work on thousands of transformers without incident.
We would welcome the opportunity to have you discuss your specific requirements prior to any decision
you make concerning our capabilities for meeting your needs. In large measure, the specific answer
would be dictated by the size and the contamination level of the equipment.
In general, our preferred method of operation would be to do as much of the work as possible in our
facility to limit the possibility of spill or exposure incidents at the customer's site. Where work must be
done at the customer's site to allow for rigging and removal of equipment or to facilitate transportation
of materials, any field dismantling is performed in accordance with the customer's specifications.
Transportation
Solomon Corporation maintains complete capabilities for transportation of electrical equipment.
Generally, the most convenient means of addressing our transporter and delivery requirements is to
utilize our own fleet. Scheduling requirements are relatively flexible compared to much of the
industry. These vary by type of service required and may be obtained through your normal Solomon
contact.
Transporter Permits
EPA ID No. KSD 054 757 646
US DOT ID No. 072332
US DOT Hazardous Material Certificate of Registration No. 052311 556 040T
(Expires 06/30/2012)
Registration
Expiration
State
Number
Date
California
3663
08/31/2011
Colorado
HMP-03159
10/25/2011
Illinois
UPW-0072332-OH
O1/01/2012
Michigan
UPW-0072332-OH
O1/01/2012
Missouri
IDG-18013000
07/23/2011
Nevada
UPW-0072332-OH
O1/01/2012
Ohio
UPW-0072332-OH
O1/01/2012
Solomon Corporation Faculty Audit Package — Solomon, KS
Page 17 of 20
Oklahoma UPW-0072332-OH 01/01/2012
West Virginia UPW-0072332-OH O1/O1/2012
SPCC Plan
Solomon Corporation has a Spill Prevention Control and Countermeasures Plan in place in
accordance with 40 CFR 112. This Plan is intended to prevent pollution caused by the discharge of
mineral oil with and without low concentrations of PCBs.
This Plan is intended to be an integral environmental document in conjunction with Solomon
Corporation's environmental compliance practices and procedures.
This Plan has been developed from data, information and drawings provided by Solomon facility
personnel. A complete facility survey was performed to identify spill potential at oil storage and
unloading facilities, loading docks, maintenance areas and other remaining areas, which have spill
potential.
The entire Plan is available for review at Solomon Corporation corporate office.
EPA Inspections
July 27, 2010
Marc Matthews of the US EPA Region VIl conducted a routine PCB inspection of the
PCB Commercial Storage and Reclamation Facility. No violations of the PCB Final Rule,
40 C.F.R. Part 761 were noted during the inspection.
February 24, 2009
Martha A. Talley of the US EPA Region VII conducted a routine PCB inspection of the
PCB Commercial Storage and Reclamation Facility. No violations of the PCB Final Rule,
40 C.F.R. Part 761 were found.
January 15, 2008
James Dworak and Mazzie Talley of the US EPA, Region VII conducted a final permit
approval inspection of the Commercial PCB Storage Facility. No violations of the PCB
Final Rule, 40 C.F.R. Part 761 were found.
August 1, 2007
James Dworak of the US EPA, Region VII conducted a routine PCB inspection of our
facility. No obvious deviations of the final PCB rule of the Toxic Substance Control Act
noted during this inspection.
January 5, 2006
James Dworak of the US EPA, Region VII conducted aroutine PCB inspection of our facility.
Solomon Corporation Faculty Audit Package — Solomon, KS
Paee 18 of 20
No obvious deviations of the final PCB rule of the Toxic Substance Control Act noted during
this inspection.
March 22, 2005
Ralph Pugh and James Dworak of the US EPA, Region VII conducted a routine PCB
inspection of our facility. No obvious deviations of the final PCB rule of the Toxic Substance
Control Act noted during this inspection.
December 8, 2004
Ralph Pugh of the US EPA, Region VII conducted a routine PCB inspection of our facility. No
obvious deviations of the final PCB rule of the Toxic Substance Control Act noted during this
inspection.
KDHE Inspections
December 14, 2010
Stan Marshall of the Kansas Department of Health and Environment conducted a routine
inspection to observe facility compliance with the Kansas Air Pollution Emission
Control Regulations. No violations were noted at the time of inspection.
September 20, 2010
Richard Flanary of the Kansas Department of Health and Environment conducted a
Routine inspection of the PCB Commercial Storage Facility and Reclamation Facility.
No violations were noted during this inspection.
February 24, 2009
Richard Flanary of the Kansas Department of Health and Environment conducted a
routine inspection of the PCB Commercial Storage Facility and Reclamation Facility. No
violations were noted during this inspection.
January 8, 2009
Stan Marshall of the Kansas Department of Health and Environment conducted an
Inspection to observe whether the facility was continuing to operate in compliance
With the Kansas Air Pollution Emission Control Regulations. No violations were noted
At the time of inspection.
January 11, 2008
Richard Flanary of the Kansas Department of Health and Environment completed the
Solomon Corporation Faculty Audit Package — Solomon, KS
Page 19 of 20
final pre start-up inspection of the newly constructed PCB Commercial Storage Facility.
Based on the results of the inspection, KDHE approved Solomon Corporation to begin
operations at the facility.
Employee Training
All employees must complete a comprehensive initial training and must participate in periodic
update and annual refresher training. This consists of a common curriculum for all employees,
encompassing an overview of all company activities, regulatory requirements, environmental and
occupational safety and health hazards, and hazard communication standards.
Beyond this initial training, each new employee's further training is tailored to their initial job
responsibilities. Plant employees receive more in depth training including SPCC (Spill Prevention,
Control and Countermeasures) Plan requirements and procedures, and in the standard operation
procedures for their particular department. All of these include extensive safety training.
Solomon Corporation Faculty Audit Package — Solomon, KS
Page 20 of 20
Powerful Transformer Solutions Established 1971
www.solomonco%com
Pre -Arrival Load Management
&
Receiving Procedures
Effective Date: 1/25/08
Introduction
It is the goal of Solomon Corporation that all load sheets arrive at Solomon Corporation
before the load is physically received. This procedure documents the process for pre -arrival
load management. There are two methods of receiving documentation, spreadsheet and
FAX/Scan. This process outlines the details pertaining to each method. This process also
outlines the, documentation and handling of electrical equipment.
1.0 Receive Documentation
1.1 Spreadsheet
1.1.1 Suppliers/Sales/Procurement
The supplier or Solomon Corporation Sales or Procurement Assistants
will e-mail the Electrical Equipment Shipping Document spreadsheet
to receiving(a),solomoncoro.com.
1.1.2 Data Entry
The data entry personnel will:
• Transfer the spreadsheet from the receiving "inbox" to
LTMssImport on 'Satum'(L:).
• Rename the load with a unique identifier beginning with the
supplier name, shipping location (if multiple sites), receiving
facility (SOL for Kansas, DEC for Decatur, TN, GT for
Georgetown, TX, and GJ for Grand Junction, CO), customer load
Page 1
Receiving Procedures update 2-26-08.doc
i
i
ID number (if available), and the number of units. Example: AEP-
- Longview-SOL-52.
• Create load sheet in the LTM web application.
o Import spreadsheet into a new load sheet.
o Edit the new load sheet, associate to PO, and assign stock
codes to all units.
o Print the load sheet.
o Place the load sheet in the file folder that corresponds- — --
alphabetically to the supplier's name.
o Note: Spreadsheet will automatically move to the
"History' folder on 'Satum'(L:) with the name being the
load number.
o At the end of each month, data entry personnel will move
the import spreadsheets to the specific month's folder on
'Satum'(L:); i.e. all of January's import spreadsheets will
be moved to a folder named January 08.
1.2 FAXED/Scanned Load Sheets
1.2.1 Drivers/Suppliers
Solomon Corporation drivers, Solomon Corporation hired load drivers,
or suppliers may FAX or scan/e-mail a copy of the load sheet to the
attention of the data entry personnel prior to the load arriving.
1.2.2 Data Entry
Upon receipt of the FAX/Scan data entry personnel will
• Print the FAX or scanned image and review all the information.
• Create the load sheet via the LTM web application.
• Print the created load sheet.
• Highlight units that standout (no labs, contaminated, suspect units)
• Place the load sheet in the file folder that corresponds
alphabetically to the supplier's name.
• Keep all LTM receiving documents for each trailer together.
Page 2
Receiving Procedures update 2-26-08.doc
R
! i
i
2.0 Development of LTM Receiving Documents
After the receiving personnel has conveyed the order of unloading, the data entry
personnel will
• Print the LTM Receiving Document.
• Organize all loads by placing the LTM Receiving Document with any
accompanying paperwork
o Group paperwork by trailer.
• Return all load paperwork to receiving personnel.
I� I
i
3.0 Receiving Crew
At the beginning of the shift the receiving crew personnel will:
• Collect all paperwork from each trailer waiting to be unloaded.
o Group paperwork by trailer number.
• Prioritize the unloading of each trailer.
o This could change due to circumstances.
• Communicate the unloading priority with data entry.
3.1 Process for dropped or live loads without Paper work
• See process for loads without paperwork (Attachment A)
3.2 Processing of LTM receiving document
• After getting the LTM receiving document from Data entry look through
to decide a flow plan. Look over LTM document for highlighted units and
suspect units.
o Repair units
o Recycle units
o Three phase and regulators(large units power roller track)
o OCR's
o Units larger than 10,000 lbs or over 8' 9" ( These units are required
to have lab result upon arrival)
Page 3
Receiving Procedures update 2-26-08.doc
i
o Untested units(Commercial Storage area)
o Single phase pads
• LTM receiving document should have three pieces of information
minimum.
o Serial number
o KVA
o Manufacture
o Part Per Million PCB(not required)
3.3 Unloading units to roller track (See map layout attachment B)
• Unload units to the gravity track based on the type of unit:
o All untested electrical equipment must go to Commercial Storage
area (size restrictions) (see map layout).
o Electrical equipment full of oil contaminated and PCB must go to
the commercial storage area. ( see map layout)
o Repair units with lab result go to the yard area (see map layout).
o Units thought to be for inventory with lab results will go to the
yard area
o Three phase pads, 250 and larger kva poles, regulators, and 3 phase
poles are unloaded to the power roller track (see map layout). If
untested the unit will need placed in holding area (see map layout).
o Known salvage units with lab results smaller than 250 KVA to
salvage gravity track. ( see map layout)
o OCR's that are to be sent to the OCR department will be place on
transport pallets in the unloading bay area.
Note: Determination of a unit to be kept for yard inventory will
need to be evaluated mainly based on inventory levels. Sources
that communicate these levels are:
1. Syspro min max
2..Communication boards
3. Back order lists
Page 4
Receiving Procedures update 2-26-08.doc
THE CITY OF FORT COLLINS
UTILITIES
Electric Department
P.O. Box 580
Fort Collins, CO 80522
SPECIFICATION NO: 368-595
Transformer Repair
J
UPDATED BY:
Adam Bromley
Senior Electrical Engineer
APPROVED BY: --,���
Kraig Bader
Standards Engineering Manager
DATE ORIGINATED: August 23, 1990
DATE REVISED: May 11, 2011
3.4 Documentation of LTM Document
• Find and compare serial number on the LTM Document to the serial
number on the unit. Verify that all the information is the same. Note any
corrections on the LTM Document unit information if necessary using a
colored pen. (not black)
• Units needing added to the load must be added to the bottom of the
preprinted LTM document for data entry to add.
• Units not found on trailer that are on LTM document must write in NOT
ON LOAD.
• If extra IC number tabby is not available to place on load sheet then the IC
number must be wrote on the line item pertaining to the unit.
• Note the coil material type (Aluminum, Copper, Mixed)
3.4.1 Placement of Inventory Control number on units
(Not repair OCR)
o Poles: Place on can slightly below lid (1" or 2") and above the
nameplate.
o Stick one IC tabby on a primary bushing so that it can be
placed on an oil sample bottle later.
o Place other IC tabby on the corresponding line item of the
LTM document.
o. Pads: front upper right corner ( yard units - write with a paint
marker the IC# in the same region) (salvage units -Write with
yellow paint marker the IC# on the tank)
o Stick one IC tabby in the right.comer so that it can be
placed on an oil sample bottle later.
o Place other IC tabby on the corresponding line item of the
LTM document.
o All other units try to place IC# on the tank near the nameplate so
that both the IC# and the serial number can be viewed.
o Stick on IC tabby on the unit so that it can be put on an oil
sample bottle later.
o Place other IC tabby on the corresponding line item of the
LTM document.
Page 5
Receiving Procedures update 2-26-08.doc
o Known salvage units can have the IC# placed on them as above
guidelines.
o Place IC tabby on the corresponding line item on the load
sheet
i
o Other IC tabby can be placed on unit anywhere.
o If unit is a RMA please follow RMA Process
o Do not write on the unit with a paint marker.
o Complete the orange Warranty Tag and place it on the unit.
3.4.2 OCR and Regulator Stock Coding
o Repair and yard regulators must be Stock coded on the load sheet
for Data entry to receive into the LTM system.
o Type of OCR and whether one shot or non one shot must be
recorded on the load sheet for each OCR.
o See OCR and Regulator Syspro Stock Code numbering system for
the correct Stock Code to apply to a unit. Attachment C
o Note: Salvage OCR's and Regulators will not need the recondition
stock code rather they will need the salvage receiving stock code.
3.5 Bar Code Scanners Attachment D
• See LTM Barcode Transaction.
o Assign IC number
o Unassigned IC number
o Reviewing load sheet or unit detail.
3.6 Unit IdentiScation Tagging
• See receiving procedure for tagging and tracking of untested electrical
equipment Attachment E
• The receiving personnel will need to tag units according to the
documentation.. Every unit will require a colored tag attached to it in an
obvious spot so that it can be recognized easily.
o Yellow Tag: UNTESTED (requires a sample to be taken)
Page 6
Receiving Procedures update 2-26-08.doc
o Mark tag with an "R" if repair and "Y" if thought to be a
yard unit.
o This tag should be placed on Quality Control units.
i
Attachment G
o Green Tag: Non Detect <2 ppm Dark/Cloudy Oil
i
o Blue Tag: Non PCB 2-49 ppm
o Red Tag: Contaminated 50-499 ppm
o Mark tag with an "R" if unit is for repair.
o Orange Tag: PCB Unit >500 ppm
i
o Tan Tag: Silicone <50 ppm
o Black Tag: Non PCB R-Temp <50 ppm
• See Unit Identification & Tagging Color Guide chart for questions on
tagging units. Attachment F
• When receiving units please remove tags that customers have placed on a
unit to eliminate confusion of SOLOMON CORPORATION. tagging
system.
3.7Quality Control Program
• See quality control program "QC" for procedures on how and what units
need to be tagged for CNO testing, sampled or put on hold.
• See.Attachment G
3.8Completed documentation
• If a unit is listed on the load sheet and confirmed that it is not present write
on that line item "Not on Load"
• If a unit is not listed on the load sheet but unloaded add to the bottom of
the load sheet all the pertinent information.
• After all units on the load have been off loaded and documented, all
documentation accompanying the load is to be returned to the Data Entry
staff.
4.0 Data entry Finalization
Page 7
Receiving Procedures update 2-26-08.dcc
• Review for any corrections i.e. Serial number, KVA, Mfg., Unit type, and
PPM.
0 Generate GRN number.
• Print Load sheet and KVA summary sheet and attach to original LTM
receiving document along with any other paperwork sent from the
customer.
• Data entry will distribute to the appropriate assistants.
Page 8
Receiving Procedures update 2-26-08.doc -
103 West Main Street
Solomon, Kansas 67480
Pa Iful Tianalarrn•r Solutions
esmm Iwr
x .solomoncorp.com
Quality Control Procedures
785E55-2191
FAX 785-655.2502
Toil Free 800-234-2867
1.0 Quality control
1.1 Large units
A confirming oil test sample will be obtained for units:
• Full of oil with 300 gallons or more
• Drained units with 700 gallons or more capacity
This does not apply to units nameplated NonPCB by the original
manufacture.
• Receiving Personnel will tag the unit with a Yellow tag, write on
the tag "QC" (Quality Control) and CL (Customer Lab) and PPM
from Receiving Documentation. Ex. QC CL 25PPM. If the CL
result is greater than 20 PPM the CNO step shall be skipped due to
the CNO will fail. Proceed to pulling an oil sample bottle.
Salvage Unit:
• If CL is less than 20PPM Processing Personnel will pull a sample
and perform a Dexsil Clor-N-Oil 50 PCB screen. If the result is
Pass, they will proceed with processing as <50 ppm. The oil
sample bottle shall be place in the ECC's collection box. The CNO
kit may be discarded in the regular waste after being neutralized.
• If the screen result is Fail, they will label the bottle with the IC
number followed by the letter "C" (Clear). Label the CNO box
with the type of unit (pole, pad, regulator or sub) and the IC#.
They will deliver the sample and the CNO kit to the ECC. The
unit will need to remain in the hold area until the sample is
processed and results are known.
• Process Personnel must complete the Clor-N-Oil Log located in
Commercial Storage (Unload dock, Untested area, Yard area).
• The ECC will collect the completed logs.
Yard or Repair unit:
• Processing personnel will obtain an oil sample bottle labeled with
the IC# and identify on the unit SS (Sample Sent). The sample
bottle is to be turned in to the ECC. The unit will remain in the
hold area until the result is known.
• Once PPM is confirmed, the ECC will identify the unit and it can
be processed according to the result.
Attachment G
Quality Control Procedures.doc
1.2 Regulators
•. All regulators that are not Manufactured NON PCB must have a
confirming sample before processing can be done.
• Receiving Personnel will flag the unit with a Yellow tag and write
on the tag "QC" (Quality Control) and CL (Customer Lab) and
PPM from Receiving Documentation. Ex. QC CL 25PPM
Salvage Unit:
• If CL is less than 20PPM Processing Personnel will pull a sample
and perform a Dexsil Clor-N-Oil 50 PCB screen. If the result is
Pass, they will proceed with processing as <50 ppm. The oil
sample bottle shall be placed in the ECC's collection box. The
CNO kit may be discarded in the regular waste after being
nuetralized.
• If the screen result is Fail, they will label the bottle with the IC
number followed by the letter "C" (Clear). Label the CNO box
with the type of unit (pole, pad, regulator or sub) and the IC#.
They will deliver the sample and the CNO kit to the ECC. The
unit will need to remain in the hold area until the sample is
processed and results are known.
• Process Personnel must complete the Clor-N-Oil Log located on
the clip board.
• The ECC will collect the completed logs.
Yard or Repair unit:
• Processing personnel will obtain an oil sample bottle labeled with
the IC# and identify on the unit SS (Sample Sent). The sample
bottle is to be turned in to the ECC. The unit will remain in the
hold area until the result is known.
• Once PPM is confirmed, the ECC will identify the unit and it can
be processed according to the result.
1.3 Retrofill Units — Reclassified as NonPCB
• Receiving Personnel will flag the unit with a Yellow tag and write
on the tag "QC" (Quality Control) and CL (Customer Lab) and
PPM from receiving document. Ex. CL 25PPM
• The nameplate should be examined to se if it indicates unit was
originally an Askeral unit.
• Processing Personnel will obtain a sample and perform a Dexsil
Clor-N-Oil 50PCB screen. If the result is pass they may proceed
with processing as <50 ppm. The oil sample bottle shall be placed
in the ECC's collection box. The CNO kit may be discarded in the
regular waste after being neutralized.
• If the screen is fail, they will label the bottle with the IC number
followed by the letter"C" (Clear). Label the CNO box with the
type of unit (pole, pad regulator or sub) and the IC#. The receiving
Personnel will deliver the oil sample bottle and the CNO kit to the
Attachment G
Quality Control Procedures.doc
ECC. The unit will need to remain in the hold area until the
sample is processed and the results are known.
• Once PPM is confirmed, the ECC will identify the unit and it can
be processed according to the result.
• Process Personnel must complete the Clor-N-Oil Log located on
the clip board.
• The ECC will collect the completed logs.
1.4 Conflicting PCB Data
• Lab report does not correspond to what is written on unit.
• Lab report does not correspond to PCB labeling on unit.
• Lab 'report does not correspond to nameplate information.
• There are two different types of labels on the unit
• Customers says it is Nameplated NonPCB, but doesn't qualify
under Solomon Corp policy
• Oil is an off smell indicating oil is not mineral oil.
• Suspect units that have historically test >50ppm
• GE units ending with a "P"
• GE units beginning with a `B" or "D"
• WH with only one alphabet character, i.e. 74CI6908,
56K22690.
• Old Allis Chalmers units
• This is a general listing. The receiving personnel should use
his/her discretion.
• Receiving Personnel will flag the unit with a Yellow tag and write
on the tag "QC".
1.5 Random Sampling
• The Receiving Personnel will flag suspect units with a Yellow
Tag and write on the tag "Random Sample".
• Random samples are to be pulled on one in fifty units.
• Processing Personnel will obtain a sample and perform a
Dexsil Clor-N-Oil 50PCB screen. If the result is pass they
may proceed with processing as <50 ppm. The oil sample
bottle shall be placed in the ECC's collection box. The CNO
kit may be discarded in the regular waste after being
nuetralized.
• If the screen is fail, they will label the bottle with the IC
number followed by the letter"C" (Clear). Label the CNO box
with the type of unit (pole, pad regulator or sub) and the IC#.
The receiving Personnel will deliver the oil sample bottle and
the CNO kit to the ECC. The unit will need to remain in the
hold area until the sample is processed and the results are
known.
Attachment G.
Quality Control Procedures.doc
• Once PPM is confirmed, the ECC will identify the unit and it
can be processed according to the result.
• Process Personnel must complete the Clor-N-Oil Log located
on the clip board.
• .Tbe ECC will collect the completed logs.
Attachment G
Quality Control Procedures.doc
SOL=OMON. CORPORATION
'00 PoweAul Transformer Solutions
P1O3 West Main Street 000 ESLtb'i5W 19]I 785-655-2191
Solomon, Kansas67480 1ww.solomoncorp.com FAX 785-655-2502
Solomon Corporation Fact Sheet
Corporate Highlights
• Founded in 1971 with 3 employees
• 485 employees today at 4 locations
• Over $100 million in annual sales
• Nation's largest Cooper Power authorized warranty repair center
• Over 3000 utility and industrial customers nationwide
• Rebuild and repair over 25,000 transformers per year
• Rebuild and repair over 20,000 oil circuit reclosers per year
• Rebuild and repair over 2,000 voltage regulators per year
• Reclamation and disposal of over 150,000 transformers per year
• 20,000 transformers, reclosers and regulators in inventory
Facilities and Equipment
• Solomon, Kansas, 100,000 sqft facility
• Decatur, Tennessee; 55,000 sqft. facility
• Georgetown, Texas (TEC Alliance), 90,000 sqft facility
• Grand Junction, Colorado 7,000 sqft facility
• Certified PCB testing laboratory
• PCB commercial storage permitted facilities (Kansas and Texas)
• Five in -field recloser maintenance trucks
• Field oil processing equipment
• Company owned trucking fleet with 19 trucks
Product and Service Offering
• Rebuild and repair polemount and padmount distribution transformers
• Single and three-phase substations transformers up to 25 MVA, 69kV
• Purchase or trade-in for used, surplus or obsolete equipment
• Environmentally sound equipment and material disposal
• Voltage regulator sales, repair and maintenance
• Recloser sales and repair, single and three-phase, hydraulic and vacuum
• Control panel testing, repair and upgrades
• In -field transformer, substation and LTC, repair and maintenance
• Substation field dress or field decommissioning
• DGA testing and analysis
Rev. D
Revision Record
REVISION DESCRIPTION
CHANGE NOTICE
MODIFIED BY:
Rev. A:
Sagen/Coram 3/17/93
• Cover page: add dates and file name
• Para. 3.2: change from 2 to 4 yr renewal
• Para. 3.3: Add "in case of conflict" statement
• Add Para. 3.5, Payment
• Para. 4.1: Add right to refuse uncertified PCB- free
units
• Para. 4.2: Split minor repairs and rewind into
separate paragraphs
• Bid proposal forms: Ed.
Rev. B:
Kraig Bader April 22, 2003
• Scanned and converted to electronic document
• Reformat Tables in Bid schedules
Rev. C:
Kraig Bader
• Changed single phase padmount color from
"Silver
07 January 2009
green, Munsell 7.56Y 7/2" to "Equipment
Green, Munsell9GY 1.5/2.6
Rev. 0:
Adam Bromley
• Added our single phase submersible transformer
Kraig Bader
to the specification and Bid Proposal Forms
• Added clause that reserves the right to a facility
11 May 2011
inspection upon award of the bid and at any
other time deemed necessary by the City
• Added an extensive Quality Control section (3.6)
including organizational and technical
requirements for the bidders to comply with.
• Secondary bushings included in the replacement
parts shall be thermoplastic material, not
thermoset
• Included the Suggested Bidder List attachment
in a new Appendix A. Added Brandon & Clark as
a Suggested Bidder
• Reformatted Section 4.2 for clarity and material
requirements
Page 2 /16
368-595
TABLE OF CONTENTS
1.
Rev. D
2.
BID REQUIREMENTS.......................................................................................................................4
2.1.
REQUIRED INFORMATION...................................................................................................................4
2.2.
MINOR REPAIR..................................................................................................................................4
3.
GENERAL REQUIREMENTS............................................................................................................4
3.1.
WARRANTY.......................................................................................................................................4
3.2.
CONTRACT EXTENSION.....................................................................................................................4
3.3.
WITHDRAWAL OF CONTRACTUAL AWARD............................................................................................4
3.4.
SHIPMENT........................................................................................................................................5
3.5.
PAYMENT.........................................................................................................................................5
3.6.
QUALITY CONTROL............................................................................................................................5
4.
TECHNICAL REQUIREMENTS ........................................................................................................6
4.1.
OIL...................................................................................................................................................6
4.2.
REPAIR AND TEST...............................................................................:.............................................6
APPENDIXA -.......................................................................................... 8
BID PROPOSAL FORM: SCHEDULE I -A ................................
BID PROPOSAL FORM - SCHEDULE I-B ...............................
BID PROPOSAL FORM -SCHEDULE II -A ...............................
BID PROPOSAL FORM -SCHEDULE II-B ...............................
BID PROPOSAL FORM - SCHEDULE III .................................
BID PROPOSAL FORM - SCHEDULE IV ................................
BID PROPOSAL FORM - SCHEDULE V.................................
BID PROPOSAL FORM - SCHEDULE VI ................................
Page 3 /16
368-595
.. 9
10
11
12
13
14
15
16
SPECIFICATION FOR
TRANSFORMER REPAIR
1. SCOPE
Rev. D
This specification establishes the minimum requirements for a blanket order for providing transportation,
materials, labor, and equipment to repair distribution transformers. The City of Fort Collins Utilities stocks
five types of transformers, pole mounted overhead units, modified overhead units for underground
installation, single phase submersible units for underground installation, single phase pad -mounted units
and three phase pad -mounted units. The contractor must be able to repair all types, see attached Bid
Proposal Forms.
2. BID REQUIREMENTS
2.1. Required Information
2.1.1. Prices shall be broken down by KVA and transformer type, see attached Bid Proposal
Forms.
2.1.2. A price list showing the discount schedule for the City for both new and reconditioned parts
must accompany the bid.
2.1.3. A description of the paint system used shall be included with the bid.
2.1.4. A list of at least three references, including phone number and name of contact must
accompany the bid. Also, list any manufacturers for whom you do warranty work. Please
include the approximate number of transformers your firm repairs in a year.
2.2. Minor Repair
2.2.1. Minor repair shall be bid as a fixed charge plus parts and oil. Minor repair shall include, but
is not limited to, the items listed under Technical Requirements.
2.2.2. Rewinding
If rewinding is required in addition to minor repair, City approval must be obtained prior to the
commencement of actual work. Rewinding will be considered on a case by case basis.
Should the City choose not to have the transformer repaired, and the repair shop will not
accept the transformer in exchange for the labor expended to discover the need to rewind, the
inspection fee must be included in the bid.
3. GENERAL REQUIREMENTS
3.1. Warranty
A minimum eighteen month warranty on labor and parts is required. Warranty period and
procedure shall be included in the bid proposal.
3.2. Contract Extension
Contract may be extended for four years under the same terms and conditions upon agreement
of the Contractor and the City, subject to satisfactory negotiations 60 (sixty) days prior to
expiration of each annual contract.
3.3. Withdrawal of Contractual Award
Purchase order is contingent on conformance with these specifications and attachments. In case
of conflict, the requirements of the following documents shall apply in the priority shown:
Page 4 /16