Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7223 DIRECTIONAL BORING (3)City Of F�ort Collins � •Traffic Operations uS;^°1 yore c113sg� Planning, Development & Transportation Traffic Operations 626 Linden Street P.O. Box 580 Fort Collins. CO 80522.0580 970.221.6630 970.221.6282-fax Change Order Form PROJECT TITLE: College & Mulberry PROJECT NUMBER: 159316 CONTRACTOR: Colorado Boring CHANGE ORDER NUMBER: 1 n prepanng change orders show in order as separate numbered paragraphs the o owing: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1. Additional bore, conduit, and conrete removal 2. Additional conduit, exavation pits, and concrete removal 3. The contract cost will be effected. $ 4,274.58 4. There will be no change in contract time ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders app v ACCEPTED BY: APPROVED BY: (Purchasing Agent over $60,000) cc: Contractor Purchasing Project File 50.58% 50.58% $8,450.92 $0.00 $0.00 $4.274.58 $12.725.50 DATE: h— 1,5—e l DATE: // DATE: WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND COLORADO BORING CO. DATED: 4/4/2011 Work Order Number: 159316 Purchase Order Number: Project Title: College & Mulberry Commencement Date: 4/4/2011 Completion Date: 5/6/2011 Maximum Fee: (time and reimbursable direct costs): $8,450.92, see attached Project Description: Install conduit (quantity: 2, size: 3") across north leg of intersection. Scope of Services: Installation of underground conduit, excavation of bore pits, and potholes. Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of _ U pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Contra r By: ate: City of Fort Collins 0 Dat By: Director of Purchasing & Risk Management (over$60,000.00) Date: College 8 Mulberry Colorado Borin Contract Item Anticipated Quantities Cost Extended Price StaginglMobilization Costs (One time cost for each work order) 1 $ 0.00 $ Directional Boring 1-2" cost/foot 0 $ 4.50 $ 2-2" cost/foot 0 $ 6.00 $ 1-3" cost/foot 0 $ 6.36 $ - 2-3" cost/foot 127 $ 8.75 $ 1,111.25 Conduit 2" conduit cost/foot 0 $ 0.98 $ - 3" conduit(cost/foot) 265 $ 2.67 $ 707.55 Excavation Pits 2' X 2' 0 $ 225.00 $ TX 3' 0 $ 365.00 $ - 4' X 4' 3 $ 485.00 $ 1,455.00 5' X 5' $ 675.00 $ - Potholing Pothole existing utilities 12 $ 145.00 $ 1,740.00 Misc. Saw cut concrete up to 4' per ft. 184 $ 2.58 $ 474.72 Remove concrete per s . ft. 35' min 184 $ 16.10 $ 2,962.40 Remove paver bricks per sq. ft. 0 $ 15.10 $ - Mud control vac. Mach. w/o erator(day) 0 $ 800.00 $ $ 8,450.92 COLORADoBORING CO. 3813 Canal Dr. FLCollins, CO. 80524 970-494-1996 FAX 970-494-4449 Company City of Ft. Collins Traffic Address 626 Linden St. City, State Ft. Collins, CO. 80524 Phone 221-6816 Ft. Collins,CO. Date Com leted: 5-6-2011 INVOICE Invoice # 13231 Date 518/2011 PO # Rep Contact Britney K�cC� Thank You c,aiere d ov-l-fo goJ1311