Change Order Form
PROJECT TITLE: College & Mulberry
PROJECT NUMBER: 159316
CONTRACTOR: Colorado Boring
CHANGE ORDER NUMBER: 1
n prepanng change orders show in order as separate numbered paragraphs the o owing:
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change in contract time.
1. Additional bore, conduit, and conrete removal
2. Additional conduit, exavation pits, and concrete removal
3. The contract cost will be effected. $ 4,274.58
4. There will be no change in contract time
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders app v
ACCEPTED BY:
APPROVED BY:
(Purchasing Agent over $60,000)
cc: Contractor
Purchasing
Project File
50.58%
50.58%
$8,450.92
$0.00
$0.00
$4.274.58
$12.725.50
DATE: h— 1,5—e l
DATE: //
DATE:
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
COLORADO BORING CO.
DATED: 4/4/2011
Work Order Number: 159316
Purchase Order Number:
Project Title: College & Mulberry
Commencement Date: 4/4/2011
Completion Date: 5/6/2011
Maximum Fee: (time and reimbursable direct costs): $8,450.92, see attached
Project Description: Install conduit (quantity: 2, size: 3") across north leg of intersection.
Scope of Services: Installation of underground conduit, excavation of bore pits, and
potholes.
Professional agrees to perform the services
identified above and on the attached forms in
accordance with the terms and conditions
contained herein and in the Professional Services
Agreement between the parties. In the event of a
conflict between or ambiguity in the terms of the
Professional Services Agreement and this work
order (including the attached forms) the
Professional Services Agreement shall control.
The attached forms consisting of _ U pages
are hereby accepted and incorporated herein, by
this reference, and Notice to Proceed is hereby
given.
Contra r
By:
ate:
City of Fort Collins
0
Dat
By:
Director of Purchasing & Risk Management
(over$60,000.00)
Date:
College 8 Mulberry
Colorado Borin
Contract Item
Anticipated
Quantities
Cost
Extended
Price
StaginglMobilization Costs (One time
cost for each work order)
1
$ 0.00
$
Directional Boring
1-2" cost/foot
0
$ 4.50
$
2-2" cost/foot
0
$ 6.00
$
1-3" cost/foot
0
$ 6.36
$ -
2-3" cost/foot
127
$ 8.75
$ 1,111.25
Conduit
2" conduit cost/foot
0
$ 0.98
$ -
3" conduit(cost/foot)
265
$ 2.67
$ 707.55
Excavation Pits
2' X 2'
0
$ 225.00
$
TX 3'
0
$ 365.00
$ -
4' X 4'
3
$ 485.00
$ 1,455.00
5' X 5'
$ 675.00
$ -
Potholing
Pothole existing utilities
12
$ 145.00
$ 1,740.00
Misc.
Saw cut concrete up to 4' per ft.
184
$ 2.58
$ 474.72
Remove concrete per s . ft. 35' min
184
$ 16.10
$ 2,962.40
Remove paver bricks per sq. ft.
0
$ 15.10
$ -
Mud control vac. Mach. w/o erator(day)
0
$ 800.00
$
$ 8,450.92
COLORADoBORING CO.
3813 Canal Dr. FLCollins, CO. 80524
970-494-1996 FAX 970-494-4449
Company
City of Ft. Collins Traffic
Address
626 Linden St.
City, State
Ft. Collins, CO. 80524
Phone
221-6816
Ft. Collins,CO.
Date Com leted: 5-6-2011
INVOICE
Invoice # 13231
Date 518/2011
PO #
Rep
Contact Britney
K�cC�
Thank You
c,aiere d ov-l-fo
goJ1311