Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - P1159 NORTH COLLEGE CORRIDOR IMPROVEMENTS PHASE II (5)j�F�ort of � Engineering Planning, Development & Transportation Engineering 2111 Iloeh college Avenue P.0 Box 580 Foil CW6ts, CO 60522.0580 070.221.6605 070,221,6378 - fox Change Order Form PROJECT TITLE: N. College Ave. Improvements - Phase ll PROJECT NUMBER: 400903900 (P1159) CONTRACTOR: Stolfus &Associates, Inc, (PO 49101922) CHANGE ORDER NUMBER: 5 n preparing change orders snow In onter as separate numbered paragraphs the following 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change In contract time. 1.&2. See attached invoke for details 3. The contract cost will Increase by $20,448.00 4. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER 7.05% TOTAL C.O. % OF ORIGINAL CONTRACT 44.31% ADJUSTED CONTRACT COST ACCEPTED BY: REVIEWED BY: SUBMITTED BY: —$' H APPROVED BY: Ql W-. lA., DATE: �1 (Department Head) APPROVED BY: II DATE: (Purchasing Agent over $60.000) a: Convador Purchasing Pro)ecl Fie $289,907.00 $108,021.00 $0.00 $20,448.00 $418,376.00 u n n u LI March 23, 2011 Mr. Kyle Lambrecht, PE Engineering City of Fort Collins PO Box 580 Fort Collins, CO 80522-0580 RE: North College Phase II Improvements- Vine to Conifer Final Engineering Contract Modification — Scope Amendment for Pavement Section Dear Kyle: At the request of the City, the pavement section for North College Avenue has been modified for the North College Phase II Improvements — Vine to Conifer. The original section included (top to bottom): 2" hot mix asphalt (HMA) • 1" HMA Reflective Crack Interlayer • 8" concrete pavement •6" aggregate base course (ABC) 24" overexcavation (swell mitigated subgrade)- The City has decided to change the approach to subgrade stabilization. The new pavement section includes (top to bottom0: • 2" HMA 1" HMA Reflective Crack Interlayer 8" concrete pavement 24" ABC • geogrid Accordingly, the plans, cross -sections, and quantities require revision. Stolfus & Associates, Inc. will revise the affected sheets with the new pavement section and incorporate the into the Construction Documents. This scope amendment includes typical section revisions; roadway modeling; cross-section revisions; updated quantity calculations for earthwork, ABC, and geogrid; tabulation revisions; summary of approximate quantity updates; and opinion of probable cost updates. The following plans will be revised: • Typical Sections (4 sheets) • Cross -sections (54 sheets) • Tabulations (Earthwork and Surfacing) • Summary of Approximate Quantities This scope also includes project management and coordination required to complete the 5690 DTC Boulevard, Suite 101 W • Greenwood Village, CO 80111 • phone: 303-221-2330 • lax: 303-221-2331 • wwntslolPosnudassociates.eam March 23, 2011 Mr. Kyle Lambrecht, PE Page 2 of 2 revisions including day-to-day coordination via phone and e-mail, one conference call, and one meeting with the City, as necessary. Based on these modifications, we respectfully request a Contract modification of $13,360 with a revised "Not to Exceed" limit for the project of $411,288. Please accept this letter as a modification to the original Contract. Let me know if you need anything else from me or if I can provide clarification. Very Truly Yours, STOLFUS & ASSOCIATES, INC. Michelle R. Hansen, PE Transportation Engineer Norm College Pavement Section Hourly Rates (Slollus): Principal (Slolfus) $150 Senior Engineer(HansenfBowm) $130 Design Engineer(Colip) $90 Administrative(MamoaWallis) $55 Senior Design Principal Engineer Engineer Admin BmwnJ Slolfus Hansen COUP Mamos Hours Hours Hours Hours Project CoordlnatlonlManagemenf 0 12 0 0 Coordination with City 0 12 0 0 Pavement Section 0 16 108 0 Typical Sections 0 1 12 0 Modeling 0 2 30 0 Cross-sectlana 0 a 54 0 Quantities 0 2 a 0 Tabs 0 1 2 0 SAQ 0 1 1 0 Cost Estimate 0 1 1 0 Total 0 28 108 0 Total Notes $1,660 $1,660 $1560 Includes conference.Il and 1 meming $11,800 $11,800 $1,210 $2,960 $5,900 54 sheaf. $980 earthwork, abc, geogrid $310 earthwork, surfacing $220 $220 $13,360 C n u ENGINEERS ARCHITECTS Farnsworth SURVEYORS GROUP SCIENTISTS May 9, 2011 Michelle Hanson, P.E. Stolfus & Associates, Inc. 5690 DTC Boulevard, Suite IOl W Greenwood Village, CO 80111 BE: North College Corridor Improvement, Phase ID (Final Right -of -Way Plan Revisions) Dear Michelle, The following scopeof work and associated fees are to provide Revisions to the existing Right -of -Way plans, legal descriptions, and exhibits for the North College Right -of -Way Plans based upon the conversations and correspondence between Farnsworth and yourself. Our scope of work and fees are as follows: Scope of Work: Make the following changes on the ROW plans: • Update Owners o Parcel 106— Owner address change o Parcel 108—New Owner o Parcel 109—New Owner o Parcel 128 - Owner address change o Parcel 132 - Owner address change o Parcel 133 - Owner address change • Parcel 114 o Update ROW and TCE linework to not include the overhang at Dingo Planet • Parcel 117 o Update the TE so the eastern building face is not included in the TE • Parcel 137 o Change to a total take Survey Deliverables: Survey Control Diagram: Farnsworth will make the requested revisions and include the Land Survey Control Diagram in the revised Right -of - Way Plan set Right -of -Way Plans/legal descriptions, and exhibits: Farnsworth will make the noted changes using information supplied by the City of Fort Collins and will re -submit the revised documents. Estimated Fees: Farnsworth Group will perform the above -noted Services on an hourly basis not to exceed $7,088, to be billed in accordance with our current billing schedule for this project. Schedule: We will begin immediately upon "Notice to Proceed". Thank you for the opportunity to be of continued service to Stolfus & Associates, Inc. on this project. Please do not hesitate to call me if you should have any questions or comments. Very truly yours, Micheal L. Bouchard, PLS Survey Manager Farnsworth Group, Inc. ' 4755 Forge Road, Suite 150, Colorado Springs, CO 80907<1719-5190.9194 (FAX) 719-590-9111.1 www.f-w.com Famsworth Group PROJECT BUDGET WORKSfEET Emmons