Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 6049 ASPHALT OVERLAY PROJECT 2010 ST MAINTENANCE (2)City of Collins Planning, Development & Transportation Streets ®rt 625 Ninth Street StrB6t5-��. P.O. Box 580 Fort Collins. CC 80522.0580 970.221.6616 970.221.6270- tax Change Order Form PROJECT TITLE: 2010 Street Maintenance Program, Asphalt Overlay Project PROJECT NUMBER: 902120 ( Bid #6049) CONTRACTOR: Lafarge Northern (PO #9102869) CHANGE ORDER NUMBER: 2 n preparing cnange oraers snow in oraer as separate numoerea paragrapns Tne miowing 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time.. 1. See attached document Change Order No. 2 3. The contract cost will increase by $91,157.84 4. There is no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % THIS CHANGE ORDER TOTAL C.O. % ORIGINAL CONTRACT ADJUSTED CONTRACT COST ACCEPTED BY: APPROVED BY: cc,. Contractor Purchasing Project File 4.94% 4.94% ATE: 4 DATE: APPROVED BY: AIVUG GE: 6 //Y./`/ Dir or of Purchasing & Risk Mana a nt (over $60,000) $1,843,930.50 $0.00 $0.00 $91,157.84 $1,935,088.34 Change Order No.: 2 Date: 5/31/2011 2 2010 Overlay Contract Renewal Bid No. 6049 Reason For Change: A. WORK PERFORMED UNDER 2010 CONTRACT INCLUDES WORK TO BE COMPLETED IN LEXINGTON GREEN AREA EAST HORSETOOTH SOUTH SHIELDS A CHANGE IN THE AMOUNTS AND COSTS LISTED BELOW IS NEEDED TO COVER THE ADDITIONAL WORK. Item Description Unit Unit Cost ADJ UNITS ADJ COST 202.06 Bobcat Style Milling <3" SY $ 5.90 4.55 8589.53 202.07 Bobcat Style Milling - Additional Inch Thichness SY/ IN $ 0.32 0.25 466.27 210.01 Adjust Valve Box EA $ 155.00 119.66 119.66 210.09 Adjust Standard Manhole 24" EA $ 390.00 301.08 2408.63 210.10 Adjust Special Manhole>24" EA $ 440.00 339.68 1019.03 403.07 HMA - Patching - Remove & Replace TON $ 119.03 91.89 52203.10 630.02 Vertical Panel Without Light Day/Each $ 0.68 0.52 5.77 630.05 Type III Barricade Without Light Day/Each $ 2.98 2.30 4.60 630.06 Size A Sign With Stand Day/Each $ 1.45 1.12 16.79 630.07 Size B Sign With Stand Day/Each $ 1.70 1.31 162.74 630.10 Cone With Reflective Strip Day/Each $ 0.69 0.53 266.34 630.13 Advance Warning Flashing - or Sequencing Arrow Panel Day/Each $ 58.28 44.99 179.97 630.15 Traffic Control Supervisor DAY $ 330.07 254.81 1783.69 630.16 Traffic Control Supervisor HR $ 33.20 25.63 1127.73 630.17 Flagging HR $ 22.19 17.13 5139.18 700.01 F/A - Asphalt Cement Cost Adjustment EA $ 1.00 0.77 17664.81 A. SUB -TOTAL AMOUNT TOTAL CHANGE IN CONTRACT AMOUNT Change In Contract Time a. No days will be added to the contract. TOTAL CHANGE IN CONTRACT TIME 91157.84 C:\Documents and Settings\jstephen\Loral Settings\Temporary Internet Files\01_1<47\1_afarge CO#2 Page 1