HomeMy WebLinkAboutCHANGE ORDER - BID - 7136 LINCOLN CENTER ADDITION AND RENOVATIONS (4)City of FF16%rt Collins Operation Services Change Order Form OPERATION SERVICES Project Management, Planning & Design 300 LaPorte Avenue P.O. Box 580 Fort Collins. CO 80522-0560 970.221.6610 970.221.6534 - fax PROJECT TITLE: Lincoln Center Additions and Renovations PROJECT NUMBER: Bid #7136 CONTRACTOR: Bryan Construction Company CHANGE ORDER NUMBER: 3 In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change 2. Description of change 3. Change in contract cost 4. Change in contract time. 1 &2 See attached sheet for detail. Changes compensation from fixed fee to time and direct cost basis with a not to exceed. 3 The contract cost will not be effected. 4 There will be no change in contract time ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) 1.86% 3.15% $5,514,309.00 $70,733.00 $0.00 $102,744.00 $5,687,786.00 ACCEPTED BY: DATE: (Company Name & Person's Name) APPROVED BY: 7J([ ✓� �. i : ,(L L L I DATE: 610 r-? / I City of Ft. Collins Ir� APPROVED BY: Agent over $60,000) cc: Contractor Purchasing Project File DATE: • Lincoln Center Additions & Renovation CONSTRUCTION INC. Owner CO #3-.•.,..-�a,o..00=.e�. As of 12110/2010 Base Contract $5,514,309 Change Order #1 Total $460,000 Change Order #2 Total $70.732 Change Order #3 Total $102.744 Revised Contract $6,147,785 Item # Reference Description of Item Cost Approved Comments APPROVED ITEMS 4.0 a) Controls - Amount Dlff between Carrying Long Controls and JCI $3.487 Approved by Steve Swfeld 11/12110 8.0 PR #1 Conduit for Future Generator $5.662 BIII to Operations Services 9.0 AS] M Sidewalk and Grading Changes 10.0 AS as Demo at Performance Hall Back Wall on T&M basis $426 Approved by Steve Seefeld 11/12/10 11.0 Dlw:aar Gas Line Move $9.827 No "'".M m".II'°.cam.a Anero..11 w S- s ,Id n 1z1a 13.0 1 DM>•nn I Demo Wing Wall at Columbine Room $1 310 Appmved by Steve Seefeld 11/12J10 14.0 Dlxw®n I Move Fence to Close Sidewalk $1 250 16.0 RFI aae Natural Gas Routing Will Approvea by Steve Seefeld 11112/10 17.0 RFIUO Drilled Piers on Gridline A-11 Added Caisson 1 763 Approved by Steve Seefeld 12G11 18.0 RFI as Caisson 413 and 414 Relocation Added Grade Beam $3:553 Approved by Steve Seefeld 1 M1 1 19.0 Fiala Iswe City of Fort Collins Gas Line Delays from 9/28110 $5,197 Approved by Steve Smfeld 12/9111 20.0 ASI fn Charities to Canyon West Room & Mezzanine Hall S5,291 23.0 Fetl Cortll m Caisson Overrun / Undenun $3,493 18" = 181,6 over, 24' = 42.6 over 3(r _ 59.5' over App/d by Steve Seefeld 1115110 24.0 RFI a51 Furnish Copper Water Entry due W space, air gap fitting & backtiow. $4,717 Approved by Steve Seefeld 11/12/10 25.0 RFI a54 Area C Existing and New Storm Conflict $2,059 26.0 Dbma.lon Add 2 bollards at new, gas meter location $1,363 27.0 ASI1ra Revised RCP, Lobby Bar & Art Niche Changes, Stair Carpet S423 28.0 RFI ff53 Add two electrical outlets in Canyon West Room 756 29.0 PFA Comments Charge Fire Suppression System in Carryon West Room to Ordinary Hazard $17.023 Approved by Steve Seefeld 11/12/10 30.0 RR "'? Door 44-1 Hardware - change to Electrified Panic, Electrified Hinge S781 31.0 plea Charge to Traction Elevator $0 Appmved by Steve Seefeld 11 iSi0 32.0 RFI III Epoxy Screeds at Brick Voids $916 Approved by Steve Seefeld 12J9/10 33.0 Door & Hardware Submittal Charges $1,412 Approved by Steve Seefeld 11/12/10 35-0 Ar.Nbel u.mh Add 3 access doors in Canyon West Room Soffit $685 Appmved by Steve Seefeld 1219110 36.0 Structural Steel Charges on Stop Drawings - Areas A & C $6.627 Approved by Steve Seefeld 12/9110 40.0 BCI COR #2: Furring at Canyon West Room (3 walls) $8,377 Approved by Steve Seefeld 10114/10 41.0 FI I. BCI COR #6: Unforeseen Conditions - Demolition $8.541 42.0 sw esr BCI COR #7: Additional Demolition of Concrete Beam $6,894 CO #3 - Approved Items Total: 10 744 OPEN ITEMS 4.0 DIs,®n C ontrols o) Lony Controls Invoice for Software & Admin Time TBD 5.0 1 RFI IlS-52 Potential Add for Additional SF of Joist & Deck at Area C TSO 15.0 Ol.lo,mn Future Acoustical Work in Performance Hall 780 21.0 Asl m Administration Roof Replacement $34,597 DELETED. No coat C e. DELETED. $651 cost. Not accepted. 37.0 RF1#79 Pipe elevator sump to Storage 104, provideI floor sink $1.917 38.0 RR ae) Add lighting in Control Booth 182-A, 116 and 116-A .. $4.143 39.0 Fiala Is Sewer Line - Camera and Clean out Roots TED 43.0 Open Items Total: $34.597 ---_ Approved Items Total $102,744 Contractor: Owner: Todd Blanks, Project Manager Steve Seefeld, Project Manager Clry of Fort Collins