Loading...
HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9113437PROFESSIONAL SERVICE AGREEMENT WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND Ayres Associates, Inc. DATED: February 2, 2010 EXHIBIT A Work Order Number: Ayres — CIPO - 6 Purchase Order Number: Project Title: CIPO — Additional Construction Phase RPR Services Commencement Date: May 13th, 2011 Completion Date: December 31, 2011 Maximum Fee: (time and reimbursable direct costs): Not to exceed Fifty Seven Thousand Seven Hundred Dollars and No Cents ($57,700.00) Project Description: Additional construction phase RPR services Scope of Services: See Attached Scope of Work Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein an in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of two (2) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. City of Fort Collins: Submitted By: 'll 1 1 Project Manager Date: Reviewed Date: Professional: By:Approved Title: Date: (P 5 I I ( Date: stdwopsa rev 7/09 By: Owen Randall, Chief Engineer OL11 By: J-0�- Jon Haukaas, Water Engineering and Field Operations Manager May 27, 2011 EXHIBIT B CANAL IMPORTATION PONDS AND OUTFALL (C.I.P.O.) - CONSTRUCTION PHASE SERVICES FOR 2011 PROJECT OBJECTIVE: To mitigate local flooding in the area generally north of West Prospect Road, south of the Glenmoor pond, west of Shields Street, and east of Taft Hill Road. GENERAL This scope covers the continuation of the construction phase services for the CIPO project. The tasks are detailed below. The Ayres Project Manager for CIPO will be: Andrea Faucett (223-5556) office (556-2525) cell The Ayres Resident will be: TC Bohnet (223-5556) office (567-0172) cell TASK 1 — CONSTRUCTION PHASE SERVICES 1.1 Construction Meetings, Resident work, As -Needed survey, BMP Monitoring. This task includes time for TC to perform all resident duties assigned to him during the final phase of the CIPO construction project. This scope assumes that TC will be full time on the project which generally accounts for 50 hours per week of his time. The schedule for this work begins on May 10h and is assumed to end on September 2nd. If needed, the work order can be extended to cover additional time for TC beyond the September 2nd date. �a w 0 0. 0 ^^L T 1�L T d O O U CV N LL O N (13 m (1) i U N -0 a3 U -0 �_ � C U) U 0 c1 .y y (/) d C O O 0 a Z3 o (A Cl)U a)C « O C ev U o UOa U) �_ U) Q U m CD m T Q Y U) Q H m U) F O U 0 Z H J D CO Z O m D U) 0 Z Q U W rr LL O Q U) Z Q J Q F• W O m O m Q J