HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9113437PROFESSIONAL SERVICE AGREEMENT
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
Ayres Associates, Inc.
DATED: February 2, 2010
EXHIBIT A
Work Order Number: Ayres — CIPO - 6
Purchase Order Number:
Project Title: CIPO — Additional Construction Phase RPR Services
Commencement Date: May 13th, 2011
Completion Date: December 31, 2011
Maximum Fee: (time and reimbursable direct costs): Not to exceed Fifty Seven Thousand Seven
Hundred Dollars and No Cents ($57,700.00)
Project Description: Additional construction phase RPR services
Scope of Services: See Attached Scope of Work
Professional agrees to perform the services identified
above and on the attached forms in accordance with
the terms and conditions contained herein an in the
Professional Services Agreement between the parties.
In the event of a conflict between or ambiguity in the
terms of the Professional Services Agreement and
this work order (including the attached forms) the
Professional Services Agreement shall control.
The attached forms consisting of two (2) pages are
hereby accepted and incorporated herein, by this
reference, and Notice to Proceed is hereby given.
City of Fort Collins:
Submitted By: 'll 1 1
Project Manager
Date:
Reviewed
Date:
Professional:
By:Approved
Title:
Date: (P 5 I I ( Date:
stdwopsa rev 7/09
By:
Owen Randall, Chief Engineer
OL11
By:
J-0�-
Jon Haukaas, Water Engineering
and Field Operations Manager
May 27, 2011
EXHIBIT B
CANAL IMPORTATION PONDS AND OUTFALL (C.I.P.O.) - CONSTRUCTION PHASE
SERVICES FOR 2011
PROJECT OBJECTIVE: To mitigate local flooding in the area generally north of West Prospect
Road, south of the Glenmoor pond, west of Shields Street, and east of Taft Hill Road.
GENERAL
This scope covers the continuation of the construction phase services for the CIPO project. The
tasks are detailed below.
The Ayres Project Manager for CIPO will be: Andrea Faucett (223-5556) office (556-2525) cell
The Ayres Resident will be: TC Bohnet (223-5556) office (567-0172) cell
TASK 1 — CONSTRUCTION PHASE SERVICES
1.1 Construction Meetings, Resident work, As -Needed survey, BMP Monitoring. This
task includes time for TC to perform all resident duties assigned to him during the final
phase of the CIPO construction project. This scope assumes that TC will be full time on
the project which generally accounts for 50 hours per week of his time. The schedule for
this work begins on May 10h and is assumed to end on September 2nd. If needed, the
work order can be extended to cover additional time for TC beyond the September 2nd
date.
�a
w
0
0.
0
^^L T
1�L T
d O O
U CV N
LL
O N
(13
m (1) i
U N -0
a3
U -0
�_ �
C U)
U
0 c1
.y
y (/)
d C
O O
0
a Z3 o
(A Cl)U
a)C
« O C
ev U o
UOa
U) �_ U)
Q U m
CD
m
T
Q
Y
U)
Q
H
m
U)
F
O
U
0
Z
H
J
D
CO
Z
O
m
D
U)
0
Z
Q
U
W
rr
LL
O
Q
U)
Z
Q
J
Q
F•
W
O
m
O
m
Q
J