Loading...
HomeMy WebLinkAboutWORK ORDER - BID - 7223 DIRECTIONAL BORING (4)�i�4at,M- Z0/0 Cow rh w cT WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND COLORADO BORING CO. DATED: 4/4/2011 Work Order Number: 159318 Purchase Order Number: Project Title: College & Olive Commencement Date: 4/4/2011 Completion Date: 5/6/2011 Maximum Fee: (time and reimbursable direct costs): $20,661.25, see attached Project Description: Install conduit (quantity: 3, size: 3") across north, east and south legs of intersection. Scope of Services: Installation of underground conduit, excavation of bore pits, and potholes. Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of _ (_) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Contractor By: Da e: By: Director of Purchasing & Risk Management (over $60,000.00) Date: City of Fort Collins Traffic Operations PROJECT TITLE: College & Olive PROJECT NUMBER: 159318 CONTRACTOR: Colorado Boring CHANGE ORDER NUMBER: 1 Planning, Development & Transportation Traffic OperalJons 626 Linden Street P.O. Box 580 Fort Collins. CO 80522.0580 970.221.6630 970.221.6282 - fax Change Order Form n preparing change orders show in order as separate numbered paragraphs the following 1. Reason for change. 2. Description of change. 3. Change in contract cost 4. Change in contract time. 1. Extra excavation and concrete removal 2. Additional exavation pits, concrete removal, paver removals 3. The contract cost will be effected. $ 6,480.42 4. There will be no change in contract time ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) 31.37% 31.37% $20,661.25 $0.00 $0.00 $6,480.42 $27,141.67 ACCEPTED BY: DATE: 6 (C Boring) APPROVED BY: DATE: O // ( I y ofIt-Collins ) APPROVED BY: DATE: (Purchasing Agent over $60,000) cc: Contractor Purchasing Project File College & Olive Colorado Boring Contract Item Anticipated Quantities Cost Extended Price Staging/Mobilization Costs (One time cost for each work order) 1 $ 0.00 $ Directional Boring 1-2" cost/foot 0 $ 4.50 $ - 2-2" cost/foot 0 $ 6.00 $ - 1-3" costlfoot 309 $ 6.36 $ 1,965.24 2-3" costifoot 329 $ 8.75 $ 2,878.75 Conduit 2" conduit cost/foot 0 $ 0.98 $ - 3" conduit cost/foot 1106 $ 2.67 $ 2,953.02 Excavation Pits 2' X 2' 0 $ 225.00 $ - 3' X 3' 1 $ 365.00 $ 365.00 4' X 4' 6 $ 485.00 $ 2,910.00 5' X 5' $ 675.00 $ - Potholing Pothole existing utilities 25 $ 145.00 $ 3,625.00 Misc. Saw cut concrete up to 4° per ft. 68 $ 2.58 $ 175.44 Remove concrete per s . ft. 35' min 68 $ 16.10 $ 1,094.80 Remove paver bricks per s . ft. 148 $ 15.10 $ 2,294.00 Mud control vac. Mach. w/o erator(day) 3 $ 800.00 $ 2,400.00 $20,661.25 COLORADO BORING CO. 3813 Canal Dr. Ft.Collins, CO. 80524 970-494-1996 FAX 970-494-4449 Company City of Ft. Collins Traffic Address 626 Linden St. City, State Ft. Collins, CO. 80524 Phone 221-6816 Ft Collins,CO. Date Completed: 5-6-2011 INVOICE Invoice # 13228 Date 5/8/2011 PO # Rep Contact Britney Thank You 7� FCC, ,01/1 ned Fnf-C) �rJ 13