HomeMy WebLinkAboutCHANGE ORDER - BID - 7223 DIRECTIONAL BORINGIV60A-1 Fort Collins /00�Traffic Operations Planning, Development & Transportation Traffic Operations 626 Linden Street P.O. Box 580 Fort Collins. CO 80522.0580 070.221.6630 970.221.6282 - fax Change Order Form PROJECT TITLE: College & Mountain Non - Federal Work PROJECT NUMBER: 159220 CONTRACTOR: Colorado Boring �Q CHANGE ORDER NUMBER' � 1 d4,,. v�(O n preparing change orders show In order as separate numbered paragraphs e o owing: / 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1. Extra excavation, concrete and paver removals 2. Additional demolition and removal 3. The contract cost will be effected. $ 6,583.24 4. There will be no change in contract time ORIGINAL CONTRACT COST $6,084.06 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $6,583.24 TOTAL % OF THIS CHANGE ORDER 108.20% TOTAL C.O. % OF ORIGINAL CONTRACT 108.20% ADJUSTED CONTRACT COST $12,667.30 (Assuming all change orders approved) ACCEPTED BY: I o Borin DATE: U Z2 /,, = APPROVED BY: ;� DATE: CP�(�/ I' I of Ins APPROVED BY: DATE: (Purchasing Agent over $60,000) cc: Contractor Purchasing Project File q 113 co�3 INVOICE Invoice # 13230 COLORAvo BORING CO. 3813 Canal Dr. Ft.Collins, CO. 80524 970494-1996 FAX 970-494-4449 Company City of Ft. Collins Traffic Date 5/812011 Address 626 Linden St. PO# City, State Ft. Collins, CO. 80524 Rep Phone 221-6616 Contact Britney City Description Unit Price Total 0 1-3" Directional Bore $ 6.36 $ 0 2-3" Directional Bore $ 8.75 0 Excavation pit 2'-2' $ 225.00 0 Excavation pit T-3' $ 365.02_ 0 Excavation it 4'-4' $ 485.00 0 Excavation pit 5'-6' $ 675.00_ 7$ --f 14 0 2" HDPE pipe $ 0-98 0 13" HDPE pipe $ 2.67 0 4" HPDE pipe $ 3.78 135 Saw out concrete up to 4" per ft. $ 2.58 W'$ 348.30 135 Remove concrete per sq. ft (35'minimum) $ 16.10 2,173.50 0 Pothole existing utilities $ 145.00 3 Mud control vac mach. (full day) $ 800.00 2,400.00 311 Remove paver bricks per sq. ft. $ 15.50 201'1 9 3-man labor crew with equipment $ 325.05 17$H�N25 '00 6 Saw cut asphalt up to 4" per ft. $ 1.52 0 [Remove asphalt oer so. ft. I $ 14.45 1? Job Location Taxes College Ave. and Mountain Ave. Totalj_ $ 12,667.30] Ft Collins,CO. Date Completed: 5-6-2011 Thank You M-la k) o-#