Change Order Form
PROJECT TITLE: College & Mountain Non - Federal Work
PROJECT NUMBER: 159220
CONTRACTOR: Colorado Boring �Q
CHANGE ORDER NUMBER' � 1 d4,,. v�(O
n preparing change orders show In order as separate numbered paragraphs e o owing: /
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change in contract time.
1. Extra excavation, concrete and paver removals
2. Additional demolition and removal
3. The contract cost will be effected. $ 6,583.24
4. There will be no change in contract time
ORIGINAL CONTRACT COST
$6,084.06
TOTAL APPROVED CHANGE ORDERS
$0.00
TOTAL PENDING CHANGE ORDERS
$0.00
TOTAL THIS CHANGE ORDER
$6,583.24
TOTAL % OF THIS CHANGE ORDER
108.20%
TOTAL C.O. % OF ORIGINAL CONTRACT
108.20%
ADJUSTED CONTRACT COST
$12,667.30
(Assuming all change orders approved)
ACCEPTED BY: I o Borin DATE: U Z2
/,,
=
APPROVED BY: ;� DATE: CP�(�/ I'
I of Ins
APPROVED BY: DATE:
(Purchasing Agent over $60,000)
cc: Contractor
Purchasing
Project File
q 113 co�3
INVOICE
Invoice # 13230
COLORAvo BORING CO.
3813 Canal Dr. Ft.Collins, CO. 80524
970494-1996 FAX 970-494-4449
Company City of Ft. Collins Traffic Date 5/812011
Address 626 Linden St. PO#
City, State Ft. Collins, CO. 80524 Rep
Phone 221-6616 Contact Britney
City
Description
Unit Price
Total
0
1-3" Directional Bore
$
6.36
$
0
2-3" Directional Bore
$
8.75
0
Excavation pit 2'-2'
$
225.00
0
Excavation pit T-3'
$
365.02_
0
Excavation it 4'-4'
$
485.00
0
Excavation pit 5'-6'
$
675.00_
7$ --f
14
0
2" HDPE pipe
$
0-98
0
13" HDPE pipe
$
2.67
0
4" HPDE pipe
$
3.78
135
Saw out concrete up to 4" per ft.
$
2.58
W'$
348.30
135
Remove concrete per sq. ft (35'minimum)
$
16.10
2,173.50
0
Pothole existing utilities
$
145.00
3
Mud control vac mach. (full day)
$
800.00
2,400.00
311
Remove paver bricks per sq. ft.
$
15.50
201'1
9
3-man labor crew with equipment
$
325.05
17$H�N25
'00
6
Saw cut asphalt up to 4" per ft.
$
1.52
0
[Remove asphalt oer so. ft.
I $
14.45
1?
Job Location Taxes
College Ave. and Mountain Ave. Totalj_ $ 12,667.30]
Ft Collins,CO.
Date Completed: 5-6-2011 Thank You