EXHIBIT "A"
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
CfL Thompson
Dated: 5/27/2011
Work Order Number. PP5272011
Purchase Order Number.
Project Title: Watees Way Park
Commencement Date: 5/31/2011
Completion Date: 10/1/2011
Maximum Fea: (time & reimbursable direct costs): 521,902.00
Project Description: Scope to include construction observation and material testing services for the
neighborhood park. See attached fee estimate and scope of services.
Scope of Services: Terms and rates for the City's cement contract bid with CI'L Thompson to
apply for this work. Work to comply with City, State, and Federal regulations.
Acceptance Park Planning & Development
User
Service Provider agrees to perform the services
identified above and on the attached forms in
accordance with the term and conditions contained
herein and in the Services Agreement between the
parties. In the event of a conflict between or
ambiguity in the terms of the Services Agreement
and this work order (including the attached foram)
the Services Agreement shall control '
Service Provider
Date:
The attached forms consisting of three-M page(s)
are hereby accepted and incorporated herein by
this reference, and Notice to Proceed is hereby
given.
City of Fort Collins
Date:
CC: Purchasing Director of Purchasing and Risk Management
if ever $60.000
May 13, 2011
City of Fort Collins
Park Planning & Development
215 N. Mason Street
P.O. Box 580
Fort Collins, Colorado 80522-0580
Attention: Mr. Matt Day
Subject: Fee Estimate for Construction Observation
and Materials Testing Services
Waters Way Park
Fort Collins, Colorado
Proposal No. FC-11-0171
At your request, CTLIThompson, Inc. is pleased to provide this fee estimate for Construction
Observation and Materials Testing services forthe Waters Way Park project located in FortCollins,
Colorado. We reviewed the plans you provided and the Geotechnical Investigation prepared by
CTL Thompson, Inc., project no. FC04803-125, dated February 19, 2009 in preparation of our
proposal.
We anticipate that the city will use our estimate for the basis of establishing a budget for the project
and to issue a purchase order for our services. Our estimated scope of services and associated
fees were prepared according to the terms and conditions of our professional services agreement
with the City of Fort Collins and are presented below.
Earthwork: Compaction testing will be required for overlot grading, utility trench backfill, wall backfill,
grade beam backfill, flatwork subgrade, sidewalk subgrade, slab subgrade, and seat wall footing
subgrade. We estimate a total of 50 site visits will be necessary for this project.
Engineering Technician
Standard Proctor
Atterberg Limits
Gradation
50 days x 2 hrs/day x $57/hr
$5,700.00
4 tests x $83/ea
$332.00
4 tests x $62/ea
$248.00
4 tests x $72/ea
$288.00
Subtotal:
$6,568.00
351 Linden Street I Suite 140 1 Fort Collins, Colorado 80524
Telephone: 970-206-9455 Fax: 970-206-9441
Drilled Caisson Observation: Full-time drilled caisson observations will be required for the shelter,
pump station, bridge abutment, and restroom structures. We will observe the depth drilled, bedrock
penetration, and reinforcing steel placement in the piers. Our observations will include one concrete
test per day - additional concrete tests for the caissons will be charged at the rates listed in the
Concrete Testing section. We estimate a total of 6 full -day site visits will be necessary for this
project.
Engineering Technician 6 days x 8 hrs/day x $57/hr $2,736.00
Subtotal: $2,736.00
Concrete Testing: Concrete testing will be required for the bridge abutments, seat walls, ramps,
flatwork, sidewalk, grade beams, and floor slabs. We estimate 25 concrete tests consisting of 4
cylinders each will be necessary.
Concrete Cylinders 25 tests x $166/test $4,150.00
Subtotal: $4,150.00
Masonry Special Inspection: Masonry inspection and sampling will be necessary for the restroom
and pump station walls. The specifications call for each type of masonry unit to be tested for
compressive strength and absorption. This requirement can be waived if the architect/EOR feels
the submittals and certifications provided by the supplier are sufficient. The specifications also call
for one set of mortar cubes to be made each day that mortar is placed and one set of grout cores to
be made each day that the contractor is grouting. We estimate a total of 12 site visits will be
necessary to observe masonry construction and reinforcement, so a total of 12 sets of mortar cubes
and grout cores would also be necessary.
Engineering Technician
Masonry Block Compression Test'
Masonry Block Absorption Test*
Grout Cores
Mortar Cubes
'May be waived by ArchitecVEOR
12 days x 4 hrs/day x $57/hr
$2,736.00
4 sets x 5 blocks/set x $36/block
$720.00
4 sets x 3 blocks x $41 /block
$492.00
4 cores/set x 12 sets x $41/core
$1,968.00
12 sets of 6 cubes x $135/set
$1,620.00
Subtotal:
$7,536.00
Structural Weld Inspection: Structural weld inspections will be necessary for the shelter and
restroom structures and will be performed by an AWS certified inspector. We estimate a total of 4
site visits will be necessary.
Engineering Technician
WATERS WAY PARK
CTL I T PROPOSAL NO. FC-11-0171
4 days x 4 hrs/day x $57/hr
Subtotal:
TOTAL ESTIMATED FEE:
912.00
$912.00
$21,902.00
IF
We would also be able to perform reinforcing steel observations for the site walls, slabs, and grade
beams if requested. It should be emphasized that this estimate is based upon assumptions of
actual quantities and contractor's schedule. The fee will be charged only for the actual hours and
unit rates presented for tests and observations requested by the owner, contractor or subcontractors
who schedule the services.
If we can be of further assistance, please contact us at your convenience.