HomeMy WebLinkAboutCHANGE ORDER - BID - 7204 VETERANS PLAZA AT SPRING CANYON COMMUNITY PARK (4)CHANGE ORDER NO. #3 PROJECT TITLE: Veterans Plaza CONTRACTOR: Landtech PROJECT NUMBER: 72 2 (- PURCHASE ORDER NO.: C1/ 12 ( DESCRIPTION: Change amphitheatre to real stone 1. Reason for change: add costs to switch to real stone uncut, collected, per baseball amphitheatre look at spring canyon; reverse add additional amphitheatre wall to accommodate HC ramp into amphitheatre; and add contract days extension of 14 days for delay in'contracting due to value engineering, changes substantial completion date to May 201h. 2. Description of Change: add costs to switch to real stone uncut, collected, per baseball amphitheatre look at spring canyon; reverse add additional amphitheatre wall to accommodate HC ramp into amphitheatre; and add contract days extension of 14 days for delay in contracting due to value engineering, changes substantial completion date to May 20th. 3. Change in Contract Cost: $6,354.00 4. Change in Contract Time: 14 Days TOTAL APPROVED CHANGE ORDER TOTAL PENDING CHANGE ORDER TOTAL THIS. CHANGE ORDER TOTAL % OF ORIGINAL CONTRACT, THIS C.O. TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S ADJUSTED CONTRACT COST (Assumina all charim ACCEPTED BY: Contractor's Rec ACCEPTED BY: Project Manager . REVIEWED BY: Title: APPROVED BY: Title: APPROVED BY: Purchasing Agent over $30,000 Larry D. Overlay 497 Tolland Dr. $6,354.00 3.22% -10.38 DATE: DATE: ,/'�• �� DATE: DATE: DATE: CV City clerk Architect Contractor Engineer ---� - -- - ._..... .._..... ......,. __.._. .., Projeat.Fite._... .Purchastn9_ ..._.. ._..... .. ....___._.—.- .. CHANGE ORDER NO. #4 PROJECTTITLE: Veterans Plaza CONTRACTOR: Landtech PROJECT NUMBER: 7204 PURCHASE ORDER NO.: DESCRIPTION: Add facing to statue base, remove rebar, add electrical 1. Reason for change: add facing to raised statue base, remove extraneous rebar from flatwork, change color of concrete to San Diego buff, add fibermech to stage flatwork, add temp wire, post, circuits and receptacles to stage and 1 along main entry path. 2. Description of Change: add facing to raised statue base, remove extraneous reber from flatwork, change color of concrete to San Diego buff, add fibermech to stage flatwork, add temp wire, post, circuits and receptacles to stage and 1 along main entry path. 3. Change in Contract Cost: $167.20 4. Change in Contract Time: 0 • p ,a,,uoa:uu TOTAL APPROVED CHANGE ORDER ($26,811.75) TOTAL PENDING CHANGE ORDER $6,354.00' TOTAL THIS CHANGE ORDER $167.20. TOTAL % OF ORIGINAL CONTRACT, THIS C.O. 0.08% TOTAL % OF ORIGINAL CONTRACT, ALL C.O.•S ADJUSTED CONTRACT COST (Assumino all chance orders aoorovecn ACCEPTED BY: Contractor's Reg ACCEPTED BY: Project Manager REVIEWED BY: Title: APPROVED BY: Title: APPROVED BY: Purchasing Agent over $30,000 ce City Clerk Architect Contractor Engineer Project File Purehesing i Larry D. Overley 497 Tolland Dr. DATE: DATE: DATE: I r7_ 1:9 DATE: