Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7023 SOUTH TRANSIT CENTER (2)CHANGE ORDER NO. 5 P.O.9101089 PROJECT TITLE: Transfort Maintenance Facility Expansion CONTRACTOR: Aller-Lingle-Massey Architects P.C. WORK ORDER NUMBER: A1-01-2010 DESCRIPTION: Design of two additions to the Transfort Maintenance Facility; bus storage area on the North and addition to the bus chassis wash on the South. Also includes the addition of a concrete apron on the North for bus driver training., Reason for change: Incorporation of additional Architectural and Engineering Services. 2. Description of change: Provide additional architectural and engineering services for additional requirements to enclose the addition with overhead doors, add an overhead door in the existing wall adjacent to the addition, add service fluid systems and provide a cost estimate for the 95% Construction Drawings. 3. Change in Contract Cost: $10,214.00 NTE 4. Change in Contract Time: 0 Days ORIGINAL CONTRACT COST $46,350.00 TOTAL APPROVED CHANGE ORDERS $23,323.00 TOTAL PENDING CHANGE ORDERS 0.00 TOTAL THIS CHANGE ORDER $10,214.00 ADJUSTED CONTRACT COST $79,887.00 REVIEWED BY ACCEPTED BY: APPROVED BY: f kk-, , I, Architect's N Facilities Project cc: Contractor Purchasing Architect Project File S 141(l i! Date s%-gi1tI Date ,�; /q I Date