Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - P1107 GEOTECHNICAL TESTING SERVICE (40)C1 //zs-7P EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND CPLThompson, Inc. Dated: 4/20/2010 Work Order Number: Purchase Order Number: Project Title: Registry -Park Testing Services Commencement Date: 5/2/2011 Completion Date: 10/l/2011 Maximum Fee: (time & reimbursable direct costs): S29,835.00 Project Description: Registry Park Construction Observation and Materials Testing Services Scope of Services: Refer to attached fee estimate. Acceptance Z-0 v User Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms) the Services Agreement shall control. Service Provider (� By JJ 11tiGGb Date: CC: Purchasing The attached forms consisting of16(e/(3 pages we hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. City of Fort Collins Date: Director of Purchasing and Risk Management if over $30,000 '1 H L O Y P O A A T E O April 20, 2011 City of Fort Collins Park Planning & Development 215 N. Mason Street P.O. Box 580 Fort Collins, Colorado 80522-0580 Attention: Mr. Craig Kisling Subject: Fee Estimate for Construction Observation and Materials Testing Services Registry Park Fort Collins, Colorado Proposal No. FC-11-0152 At your request, CTLIThompson, Inc. is pleased to provide this fee estimate for Construction Observation and Materials Testing services for the Registry Park project located in Fort Collins, Colorado. We reviewed the plans prepared by Interwest Consulting Group, Alter Lingle Massey Architects, P.C., and Weeks and Associates dated February 4, 2011 and the Geotechnical Investigation prepared by CTL Thompson, Inc., project no. FC04930-125, dated June 29, 2009 in preparation of our proposal. We anticipate that the city will use our estimate for the basis of establishing a budget for the project and to issue a purchase order for our services. Our estimated scope of services and associated fees were prepared according to the terms and conditions of our professional services agreement with the City of Fort Collins and are presented below. Earthwork: Compaction testing will be required for overlot grading, utility trench backfill, wall backfill, grade beam backfill, flatwork subgrade, sidewalk subgrade, slab subgrade, and playground subgrade. We estimate a total of 80 site visits will be necessary for this project. Engineering Technician Standard Proctor Atterberg Limits Gradation 80 days x 2 hrs/day x $57/hr $9,120.00 5 tests x $83/ea $415.00 5 tests x $62/ea $310.00 5 tests x $72/ea $360.00 Subtotal: $10,205.00 351 Linden Street I Suite 140 1 Fort Collins, Colorado 80524 Telephone: 970-206-9455 Fax: 970-206-9441 Drilled Caisson Observation: Full-time drilled caisson observations will be required for the shelter and restroom structures. We will observe the depth drilled, bedrock penetration, and reinforcing steel placement in the piers. Our observations will include one concrete test per day - additional concrete tests for the caissons will be charged at the rates listed in the Concrete Testing section. We estimate a total of 7 full -day site visits will be necessary for this project. Engineering Technician 7 days x 8 hrs/day x $57/hr $3,192.00 Subtotal: $3,192.00 Concrete Testing: Concrete testing will be required for the walls, steps, flatwork, sidewalk, grade beams, slabs, and playground subgrade. We estimate 40 concrete tests consisting of 4 cylinders each will be necessary. Concrete Cylinders 40 tests x $166/test $6,640.00 Subtotal: $6,640.00 Asphalt Testing: Compaction testing may be required during asphalt patching at the street cuts. We estimate 3 site visits and 3 samples will be necessary. Engineering Technician 3 days x 3 hrs/day x $57/hr $513.00 Lab Density (Rice) 3 tests x $88 /ea $264.00 AC Content/Gradation 3 tests x $156/ea $468.00 Subtotal: $1,245.00 Masonry Special Inspection: Masonry inspection and sampling will be necessary for the restroom walls. The specifications call for a minimum of one set of hollow prisms prior to construction and one set of five grouted prisms during construction. In addition, the specifications call for one set of mortar cubes to be made each day that mortar is placed and one set of grout cores to be made each day that the contractor is grouting. We estimate a total of 15 site visits will be necessary to observe masonry construction and reinforcement, so a total of 15 sets of mortar cubes and grout cores would also be necessary. Engineering Technician Hollow Prisms Grouted Prisms Grout Cores Mortar Cubes 15 days x 3 hrs/day x $57/hr $2,565.00 3 prisms x $67/prism $201.00 5 prisms x $78/prism $390.00 4 cores/set x 15 sets x $41/core $2,460.00 15 sets of 6 cubes x $135/set $2,025.00 Subtotal: $7,641.00 U REGISTRY PARK CTL I T PROPOSAL NO. FC-11-0152 Structural Bolt Inspection: Structural bolt inspections will be necessary for the shelter and will be performed by an AWS certified inspector. We estimate a total of 4 site visits will be necessary. Engineering Technician 4 days x 4 hrs/day x $57/hr $912.00 Subtotal: $912.00 TOTAL ESTIMATED FEE: $29,835.00 We would also be able to perform reinforcing steel observations for the site walls, slabs, and grade beams if requested. It should be emphasized that this estimate is based upon assumptions of actual quantities and contractor's schedule. The fee will be charged only for the actual hours and unit rates presented for tests and observations requested by the owner, contractor or subcontractors who schedule the services. If we can be of further assistance, please contact us at your convenience. Very truly yours, CTL I THOMPSON, INC. Heather Grubb Field Department Manager REGISTRY PARK CTL I T PROPOSAL NO. FC-11-0152