HomeMy WebLinkAboutCHANGE ORDER - RFP - 7033 DISCOVERY MUSEUM FACILITY (3)SECTION 00950 CHANGE ORDER NO. 2 PROJECT TITLE: Discovery Museum CONTRACTOR: Hensel Phelps Construction Company BID NUMBER: 7033 DESCRIPTION: The construction of a 46,928 square feet Discovery Museum facility complete with related site work, curb & gutter, paving, sidewalks, utilities and landscaping. 1. Reason for change: Incorporation of various Change Estimates (CE) into the Contract. 2. Description of changes: CE004 Groundbreaking Ceremony - $3,058.00; CE017 Fiber Optic Conduit - $5,662.00; CE033 Mason Court Parking Credit — (3,115.00); CE040 Add'/2" Substrate to Roof for PV's - $41,159.00; CE044 LC Health Dept. Review Comments - $8,723.00; CE053 Add 1" Tectum w/ 3'/2" Batt @ Gallery - $95,034; CE054 Remove Existing Concrete Foundations - $2,099.00; CE058 Unforseen Hauling of Concrete, Asphalt, Trash - $10,337.00; CE065 Re -Design of Electrical Floor Boxes in Gallery - $3,000.00; CE076 Revise Stucco Infill Panel @ Traveling Exhibit - $4,134.00; CE080 Helical Pier 10" North @ Grid Lines 4&/C - $2,004.00; CE081 Two Helical Piers @ Grid Lines B&3 - $3,196; CE094 Greenscreen in lieu of SS Trellis — ($17,937.00); CE134 City Provide 6" Backflow Preventer — ($575); CE141 Dutch Door for Opening 111A - $834.00; CE148R Change Glass in Classroom OH Doors - $2211.00. 3. Change in Contract Cost: $159,824.00 4. Change in Contract Time: 0 Days ORIGINAL CONTRACT COST $11,400,000.00 TOTAL APPROVED CHANGE ORDERS 577,347.00 TOTAL PENDING CHANGE ORDERS 0.00 TOTAL THIS CHANGE ORDER 159,824.00 ADJUSTED CONTRACT COST $12,137,171.00 ACCEPTED BY: Contractor's Representative Date ACCEPTED BY: � < S . q Z O 1 Facilities Project Man er Dittee ACCEPTED BY: 4(/7 / DiscooMuseum Director (City of Fort lins) Da e ACCEPTED B Discovery Museum Director ( Pcr Da APPROVED BY: � OI I/ D ect of Purchasing and Risk Management Da e cc: Purchasing Architect Contractor Project File