Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7161 COLLEGE AVENUE AND HARMONY ROAD LANDSCAPE AND URBAN DESIGN (3)City . of rVr C®F6LLIYyy�p� s Planning, Development & Transportation Englnooring 281 North C01. Avenue Engineering - P.O. Box 580 Fort CaYns. Co 80522.0580 970.221.6606 970.221.6378 - fax Change Order Form PROJECT TITLE: Harmony/College Landscape & Urban Design Improvements . PROJECT NUMBER: 400901802.6 (Bid #7161) CONTRACTOR: American Civil Constructors (PO #9104728) CHANGE ORDER NUMBER: 6 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1&2. See attached sheet for detail. 3. The contract cost will decrease by $ 1,247.60 4. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS . TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED 0.20 % 5.90 % DATE: REVIEWED BY: --f DATE: / �(Engine '7�p�/ SUBMITTED BY. DATE: .(L (Project Manager) APPROVED BY: C d�Gy DATE: ' I " I �J � ( artmen Head APPROVED BY:D DATE: (Purchasing Agent over $60,000) cc Canlracler Purchasing Project File $638,617.00 $36,411.31 $0.00 $1,247.60 $676,275.91 CHANGE ORDER S College Harmony Landscape and Urban Design Project SUMMARY OF WORK Item # Item Ouantlty unit .F r una T„ r.� 1 Additional Sleeves under Sidewalk 1 LS $ 287.30 $ 287.30 2 Concrete Pole Base Repair 1 LS $ 496.00 $ 496.00 3 Cedar Post 1 LS $ 218.30 $ 218.30 4 Bollard Plate Removal and Sealing 1 LS $ 246.00 $ 246.00 TOTAL 1,247.60 REASON FOR CHANGE 1 Additional Sleeves were required under the sidewalk at Spotlight Music and Livingston's corner 2 Concrete pole base repair made at Mason Street signal pole base. 3 Installation and removal of a cedar posts that was requested by City parks but later agreed that it would look out of place and not necessary. 4 Removal of Ballard plates on bollards thatwere knocked over by traffic. Price includes sealing the holes left from unbolting the plates. Additonal Ono Irrigation was installed along the east side of Colelge Ave In an area that was originally bid as gravel but later revised for 6 landscape plantings by BHA/City. - REMOVED FROM CO - WAS NOT INSTALLED WHEN POSTED Posted to Pay App #5