Loading...
HomeMy WebLinkAboutWORK ORDER - BID - 6047 HVAC SERVICES 2007 (4)EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND HIGH PLAINS MECHANICAL DATED: April 15, 2007 Work Order Number: HV•01-2011 Purchase order Number: Project Title: Replace two RTU'sat200West Mountain Commencement Date: May15,2011 Completion Date: July 01,2011 Maximum Fee (time and reimbursable direct costs): $20,030.00 Project Description: Replace two RTU's at 200 West Mountain with new Letmox LGH Emergence Units. Scope of Services: Removicexisting RTU"s,mamllnow gasUnes,roof curbs, and RTU's. Perform startup onatt eauioment hmmRed. Service Provider agrees to perform the'services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms) the Services Agreement shall control. SERVICE PRODER Date: CC: Purchasing The attached forms consisting of _ (_) pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given - CITY OF FORD COLLINS "'4121,2011 Director of Purchasing and Risk Management over $60,000. (PROPOSAL LrlIG1� HIGH PLAINS MECHANICAL SERVICE. INC 2020 AIRWAY AVE. FORT COLLINS,CO.80524 (970) 221-5646 FAX (970) 221-5682i Page 1,of 2 PROPOSAL SUBMITTED TO PHONE DATE JOB City of Fort Collins Facilities 22t-6 6 -6-11 PF-11 9 STREET JOB NAME 1 LaPorte Avenue Replace RTU's CITY, STATE and ZIP CODE JOB LOCATION . Fort Collins, CO 80521 200 West Mountain ATTENTION: FAX NO. E-MAIL Steve Strickland 224-6071 sstrickland@fcgov.com OUR BUDGET PROPOSAL TO FURNISH MATERIAL AND LABOR IS AS FOLLOWS: Replace two rooftop units as indicated. Units will be Lennox M#LGH Energence units with Prodigy controllers, economizers and hail guards. Refrigerant is R-410A. The 4 ton is rated at a 17 SEER and the 10 ton is rated at a 12 EER. Work Included: • Demo existing rooftop units, recover refrigerant and dispose of per city instructions. • Set up crane and remove old units. • Fabricate curb adapter and flashing for the 4 ton unit. • Set factory curb adapter on the existing curb for the 10 ton unit. • Set new units, reconnect existing gas pipe and low voltage electrical and install new condensate p-traps. • Perform full start up and commissioning for all new units. Not Included: Electrical, temporary cooling, engineers reports, roofing work, structural work, overtime labor and any additional work other than that listed above. We Propose hereby to furnish material and labor — complete in accordance with above specifications, for the sum of: Twenty Thousand Thirty and 00/100..................................................... Dollars $ 20,030.00 All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from above Authorized Signature Pau! Finger specifications involving extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon Note: This proposal may 6a withdrawn by us if not accepted within 30 days strikes, accidents or delays beyond our control. Owner to carry tire, tomado and other Payment will be made as follows: 30 clays NET necessary insurance. Our workers are fully covered by Workman's Compensation Acceptance of Proposal- SIGNATURE DATE The above prices. specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. I further understand that delinquent accounts will be charged maximum legal interest and reasonable collection fees, including attorneys and court fees,