Loading...
HomeMy WebLinkAboutWORK ORDER - BID - 6047 HVAC SERVICES 2007 (3)EXHIBIT ^A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND HIGH PLAINS MECHANICAL DATED: April 15, 2007 Work Order Number: HV-02-2011 Purchase order Number: Project Title: Replace five RtUsat117NorthbIasonSt. -UtffityDMing Commencement Date: Juae01,2011 Completion Date: July 15, 2011 Maximum Fee (time and reimbursable direct costs): $38,550.00 Project Description: glace five BTU's at 117 North Mason St.-UUHty BMg Scope of Services: Remove existing RTU"s, install new gas lines, roof curbs, and RTU's. Pcrformstarwponall equipment installed. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms] the Services Agreement shall control, SERVICE PROVIDE`R�, By: aQ- Date: 4�^ / - 2D ik CC: Purchasing The attached forms consisting of _ L) pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given - CITY OF FO COLLINS By: .RG/o Date: Apri121, 2011 Director of Purchasing and Risk Management over $60,000. ROTOSAL HIGH PLAINS PLAAINNS S MECHANICAL SERVICE. INC. 2020 AIRWAY AVE. ,�� ✓i (.�y % �� FORT COLLINS,CO.80524 (970) 227-6645 FAX (970)221-5682 Page 1 of 2 PROPOSAL SUBMITTED TO PHONE DATE JOB City of Fort Collins Facilities 221-6 6 -2 -11 PF-1140 STREET JOB NAME , oo LaPorte Avenue Replace Five RTU's #1, #3, #4, #5 & #6 CITY, STATE and ZIP CODE JOB LOCATION Fort Collins CO 80521 117 North Mason ATTENTION: FAX NO. E-MAIL Steve Strickland ' 224-6071 sstrickland@fcgov.com OUR BUDGET PROPOSAL TO FURNISH MATERIAL AND LABOR IS AS FOLLOWS: Replace five rooftop units as indicated. Units will be Lennox M#LGH with economizers and hail guards. Refrigerant is R-41 OA with a 12 EER rating. Three are 4 ton and two are 5 ton. Work Included: • Demo existing rooftop units, recover refrigerant and dispose of per city instructions. • Set up crane and remove old units and set new curb adapters. • Set new units, reconnect existing gas pipe, low voltage electrical and install new condensate p-traps. • Perform full start up and commissioning for all new units. Not Included: Electrical, temporary cooling, engineers reports, roofing work, structural work, overtime labor and any additional work other than that listed above. We Propose hereby to furnish material and labor - complete in accordance with above specifications, for the sum of: Thirty Eight Thousand Five Hundred Fifty and 001100 ............................ Dollars $ 38,550.00 All material is guaranteed to be as specified. All work to be completed in a workmanlike ll Authorized n�ll� Finger manner according to standard practices. Any alteration or deviation from above Signature 1" specifications involving extra costs will be executed only upon written orders, and will hecome an extra charge over and above the estimate. All agreements contingent upon Note This proposal may he withdrawn by us if not accepted within 30 days strikes, accidents or delays beyond our control. Owner to carry fire, tomado and other Payment will be made as follows: 30 days NET necessary insurance. Our workers are fully covered by Workman's Compensation Acceptance ofTroposar SIGNATURE GATE The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. I further understand that delinquent accounts will be charged maximum legal interest and reasonable collection fees, including attorneys and court fees_