HomeMy WebLinkAboutCHANGE ORDER - BID - 7136 LINCOLN CENTER ADDITION AND RENOVATIONS (3)I A PROJECT TITLE: Lincoln Center Addition and Renovation CONTRACTOR: Bryan Construction Company PROJECT NUMBER: Bid #7136 DESCRIPTION: Miscellaneous Additional Items City of 9 F6rt Collins In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change: Owner requested changes and/or adjustments based upon unforseen conditions. 2. Description of change See attached summary. 3. Change in contract cost: yes 4. Change in contract time: no (Attach additional sheets as required) ORIGINAL CONTRACT COST $5,514,309.00 TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER $70,733.00 TOTAL % OF THIS CHANGE ORDER 1.28% Total C.O. % of Original Contract 1.28% ADJUSTED CONTRACT COST $5,585,042.00 (Assuming all change orders approved) ACCEPTED BY: r�- Contractor's Representative Todd Blanks, PM, Bryan Construction ACCEPTED BY: !/_�� / &&f e 1- Project Manager Stephen Seefeld, Facilities Project Mgr REVIEWED BY: 4Z4 Print Name =041:191 cc: Date 2/13/11 Date Date B . z� Pr' me 1;e*- 0 P�,,�� p D a td` City Clerk Contractor Engineer 4 PLtr ?— Project File Purchasing NORTHERN COLORADO GROUP To: Steve Soared City of Fort Collins 300 LaPorte Avenue East Building Fort Collins, CO 80522-0580 Ph:970-221-6227 Fax: (970) 221-6534 Description: COR#1-Change Order #2Work Change Request Number: 1 Date: 1016110 Job: 10-024 Lincoln Center Addition & Reno Phone: 161 E. Saturn Drive, Unit 2 FortCollins, CO 80525 Phone: (970)377-0937 We are pleased to offer the following specifications and pricing to make the following changes: 1_ All work associated with ASI #1, except any associated work In Columbine Room. Price is for work associated with the casework elevations included in ASI #1, as well as the add for work in the Conference Resirooms. 12. Per ASI #2, change locations from pavers to colored concrete. 3. Add for Tree Removal by Certified Arborists, as directed by City of Fort Collins. 4. Per RFI #26, the upper portion of the South wall in the Canyon West Room was noted on the drawings as existing, but did not actually exist in field conditions. Wag to be built as directed in RFI #26 response. 5. All work associated with ASI43. This includes replacing intedorTrespa in Vestibule 100, Vestibule 120, Vestibule 172, & North Lobby 179 with 5/8' gypsum board - to receive texture and paint; revised site grading plan at North stage due to VE; clarification of window sill height in Mini -Theater control room; revised plan for Mini Theater Vestibule 181, work associated with an existing column discovered in the existing North wall of the Mini -Theater, and adding a utility sink to Wardrobe Room. #128, 6. Per discussions, change Trespa panels to all metallic color selection, with revised square footage of panels through VE process. The total amount to provide this work is.................................................................................................. $70,732.98 (Please refer to attached sheet for details.) The schedule Is not affected by this change. If you have any questions, please contact me at (970)377-0937. Submitted by: Todd Blanks Bryan Construction, Inc Cc: Approved by: Date: Page 1 of 2 161 E. Satum Drive, Unit 2 R.Y. N ' Fart Colons, CO 60525 Phone: (970)377-0937 NORTHERN COLORADO GROUP Change Request t Price Breakdown Continuation Sheet Description: COR #1 - Change Order 92 Work Description tabor Material Equipment Subcontract Other Price ASI #1 - Re Interiors $5,392.00 $5.392.00 ASI #2 VE - Changing Pavers to Colored Concrete Tree Removal by Arbodsts $1 600 00 $1 600 00 RFI #26 -Canyon West Room South $2 627 00 Wall Clarification $2,627 00 ASI #3 Work - Holsinger Drywall $1 972 00 $1 972 00 Trespa All -Metallic Color Selection ASI #3 Work - Martin & Sons $15.850.00 $15,850.00 ASI #3 Work- Wray P&H $912.00 $912.00 ASI 93 - Gen3 SIA90.00 $1,890.00 ASI #1 - Wray P&H $4,330.00 $4,330.00 ASI #1 - Superior Demo $8,516.00 $8,516-00 ASI #1 - Marino Tile $5,545.00 $5$545.00 A51 #1 -Core Electric $13,241.00 ,5,41.00 $ ASI #1 - Freedom Painting $2,845.00 $2,845.00 BCI Additional Money from Trespa $600.00 $1,120.00 $500.00 Panels $1,120.00 Leftover $ from ASI #1 $2,935.00 $2,935.00 Subtotal: $60.715.00 Bond $60.715.00 1.00% $607.15 Insurance $60,715.00 0.50% $303.58 BCI O&P $60,715.00 15.00% $9.107.25 Total: $70,732.98 Page 2 of 2