Loading...
HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9111999q wa/ � �- EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND CTL Thompson Incorporated - Vendor Number 132158 Work Order Number: Project Title: Downtown Alley Enhancement West Laurel to West Myrtle Alley Commencement Date: _May 1, Project Description: Scope of Services: Purchase Order Number: Maximum Fee: $6,398.00 Completion Date: October 1, 2011 Please see attached Please see attached Service Provider agrees to perform the services Identified above and on the attached forms in accordance with the terms and conditions contained herein and in the scope of work. It is expressly acknowledged by the City and CTL Thompson Incorporated, that the Fort Collins, Colorado, Downtown Development Authority (DDA) is a third -party beneficiary to this Agreement and shall be entitled to enforce any and all provisions of this Agreement In the same manner as the City. The Professional shall be responsible for the professional quality, technical accuracy, llmely completion and the coordination of all services rendered by the Professional, Including but not limited to designs, plans, reports, specifications, and drawings and shall, without additional compensation, promptly remedy and correct any errors, omisslons, or other deficiencies. The Professional shall Indemnlly, and hold harmless the Fort Collins Downtown Development Authority, its officers and employees, and the City of Fort Collins, Its officers and employees, In accordance with Colorado law, from all damages whatsoever claimed by third parties against the DDA and the City and for the DDA's and the City's costs and reasonable attorneys fees arising directly or indirectly out of the Professional's negligent performance of any of the services furnished under this agreement. The Professional shall maintain commercial general liability Insurance in the amount of $500,000 combined single limits and errors and omisslons Insurance In the amount of $1,000,000. Prior to commencing work the Professional shall furnish the DDA with certification of Insurance, naming the DDA as an additional Insured. Service \ Provider: cCTL Thompson, Inc n By: ly� a���-- sArL -t=- Date: LA — \3 —11 Fort Collins Downtown Development Authority By: Date: 7 ' City of Fort Collins: Director of Purchasing and Risk Management Over $60,000 CC: Purchasing The attached form consisting of two pages are hereby accepted and Incorporated herein by this reference, and Notice to Proceed is hereby given. vr�x�?e�o;za�vsiozin#as*�s�e April 7, 2011 Revised April 8, 2011 Downtown Development Authority 19 Old Town Square, Suite 230 Fort Collins, Colorado 80524 Attention: Ms. Ann Aspen Project Manager Subject: Fee Estimate for Construction Observation and Materials Testing Services Downtown Alley Enhancements West Laurel to West Myrtle Alley Fort Collins, Colorado Proposal No. FC-11-0130R At your request, CTLjThompson, Inc. is pleased to provide this revised fee estimate for Construction Observation and Materials Testing services for the West Laurel to West Myrtle Alley portion of the Downtown Alley Enhancements project located in Fort Collins, Colorado. We have revised our previous estimate at your request to include additional testing. Our estimated scope of services and associated fees were prepared according to the terms and conditions of our professional services agreement with the City of Fort Collins. Earthwork: Compaction testing will be required for alley subgrade. We estimate that a total of 10 site visits and 1 proctor will be necessary for this project. Engineering Technician 10 days x 2 hrs/day x $57/hr $1,140.00 Standard Proctor 1 test x $83/ea $83.00 Atterberg Limits 1 test x $62/ea $62.00 Gradation 1 test x $72/ea 72.00 Subtotal: $1,357.00 Concrete Testing: Concrete testing will be required for the alley pavement below the pavers. We estimate that a total of 15 concrete tests consisting of 5 cylinders each will be necessary for this project. Concrete Cylinders 15 tests x $166/test $2,490.00 Extra Concrete Cylinders 15 cylinders x $9/cylinder $135.00 Subtotal: $2,625.00 351 Linden Street I Suite 140 1 Fort Collins, Colorado 80524 Telephone:970-206-9455 Fax:970-206-9441 T Asphalt Testing: Compaction testing may be required for the asphalt patching in the roadways. We estimate 3 site visits and 3 samples will be necessary. Engineering Technician 3 days x 4 hrs/day x $57/hr $684.00 Lab Density (Rice) 3 tests x $88 /ea $264.00 AC Content/Gradation 3 tests x $156/ea $468.00 Subtotal: $1,416.00 TOTAL ESTIMATED FEE: $5,398.00 It should be emphasized that this estimate is based upon assumptions of actual quantities and contractor's schedule. The fee will be charged only for the actual hours and unit rates presented for tests and observations requested by the owner, contractor or subcontractors who schedule the services. If we can be of further assistance, please contact us at your convenience. Very truly yours, CTL I THOMPSON, INC. Heather Grubb Field Department Manager Cc via e-mail: aaspen@fcgov.com jusher@ditescoservices.com V� DOWNTOWN DEVELOPMENT AUTHORITY DOWNTOWN ALLEY ENHANCEMENTS - WEST LAUREL TO WEST MYRTLE ALLEY CTL I T PROPOSAL NO. FC-11-0100R