Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - P1124 CIVIL ENGINEERING ANNUAL (14)OW 11 00 EXHIBIT"Ar WORK ORDER. PC PURSUANT TO AN AGMEM THE CITY OF FO&1TC AND'' INTERWEST CONSULTO DATED; July 15, 2 Work Order Number: Purchase Order Number_ Project Title: - Gustav Swanson Trait Asphalt to Concrete Plmrs Commencement Date:: Completion Date: 7-1-II Maximum Fee: (lime and reimbursable direct cosls): 11000 Project Description: _ . See Attached Scope of Services: Scc Description - Professional agrees to perform the services Identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreementbetweentha parties. In the event of a conflict :between or ambiguity In the terms of the Professional Services Agreement and this work order (including the attached forms) -the Professional Services Agreement shalt control. Professional 12 04-OS-11 BETWEEN [4041117 m a^ -L The attached forms consisting of U pages are hereby accepted and incorporated herein, by this reference, and Notice to. Proceedishereby given. .City of Fpd Collins By: James B. O'Neill II, CPPO, FNIGP ': DGector of Purchasing.and Risk.Nlanagement '.;(over $30,000M) Data: 8 MTIRWOBT CO N,SULT100 GROUP April 5, 2011 Ms. Karen Manci ` City of Fort Collins Natural Areas 1745 Hoffman Mill Road Fort Collins, CO 80524 Gustav Swanson Trail Asphalt to Concrete Plans-i-' Project Description and Scope of Services Dear Karen - Attached is the project scrape and description that we -discussed: Description . fnterwest and King Surveyors will provide engineering and surveying services necessary to create plans for construction and stormwater permitting for approximately 1,800 linear feet of concrete trail along the existing asphalt trail aligmnent at the Gustav Swanson Naturel�Aiea. Scope of Services , Surveying - Topographic sarvey - King Surveyorswill provide four phases of topographic survey. The initial phase will include topographic survey 20' either side o the existing.trail alignment along with the west half of the existing parking lot. The second phase will get cx st g elevations precisely at the location of the design cross sections so that an accurate comparison of existing`. and proposed ground can be made after construction is completed. The third phase will include staking out the trail for the contractor prior to construction. The final phase of survey will occur during construction of the trail and include form checks and as built elevations at the location of the design cross sections which will -tie compiled in the final as built plans for floodplaiu f1ArRmPntnfinn '''.: _______--_— Estimated Fee: $9, 000 - Trail plan,.proflle and grading - Interwest will prepare plan, profile, grading, cross section, and detail drawings for the trail in a form similar to other trail projects recently completed for Park Planning. Estimated Fee: $3, 900 Floodplain process assistance.- lnterwest will assish'the City with the floodplain documentation necessary to construct the project including benchmarks and BFE:elevations along the trail segments. interwest will also incorporate the as -built survey points (provided by King) into exhibits to compare thedesignto the as -built conditions and close out the City Floudplain Pertnitsi,,,: Estimated Fee: $1,800 Reimbursables- for prints, mileage, and deliveries; etc:. Estimated Fee: $200 Total Estimated Fee: $14,900 . 1218 W. ASH, STE. C. WINDSOR, COLORADO 80550 IEL. 970,674.3300 - FAX 970.674.3303 Assumptions— . 1. Specifications, quantities, and contract docti rients provided by others. 2. Environmental and geotechnical engineering provided by others. 3. No CA or CM work is included. . 4. Stormwater Management Plan and Discharge parmit will be provided by the Contractor. 5. No permitting tasks will be completed by Interwest. Schedule Interwest and King Surveyors will begin work on the,project immediately in hopes of bidding the project in June or July, 2011. However, the schedule will likely be'depondent on the floodplain review. Please call me at 970-631-2671 if you have any questions or need any additional information. Thanks,