Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - P1066 ENVIRONMENTAL SERVICES (22)EXHIBIT ''A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND WALSH ENVIRONMENTAL SCIENTISTS & ENGINEERS, INC. DATED: June 1, 2007 Work Order Number: FAC-EN-01-2011 Purchase order Number: Project Title: Discovery Museum Commencement Date: July23,2010 Completion Date: March31,2011 Maximum Pee (time and reimbursable direct costs): S91,943.00 Project Description: Construction of a Discovery Museum at die Martinez Park property, complete with the associated site work. curb & gutter, paying, sidewalks, utilities, fencing and landscaning. Scope of Services: Provide odditional Excavarion Oversight and Mate:ials Management Servicts for the new Discovery Museum project due to an extension for the soil disturbing activities created by problems with the helical piers, site utilities and concrete pier and grade beam excavations, per your proposal of February 25, 2011. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms) the Services Agreement shall control. SERVICE PROVIDER Date: Af4, ✓-C- /S, 2C l i CC: Purchasing ACCEPTANCE Ron Kechter USER The attached forms consisting of O02 tJ pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given - CITY OF RT COLLINS By: O Date: Director of Purchasing and Risk Management over $60,000. «aWi Environmental Scientists and Engineers. LLC an eenlnkv and environment compnnv February 25, 2011 Mr. Ron Kechter City of Fort Collins Operations Services Department 300 LaPorte Avenue P.O. Box 580 Fort Collins, Colorado 80522-0580 RE: Budget Summary and Request for Contract Value Increase for Excavation Oversight and Materials Management Services Discovery Museum Project, Fort Collins, Colorado WALSH Project Number: 900055.7983.010 Dear Mr. Kechter. At your request, WALSH Environmental Scientists and Engineers, LLC (WALSH) is pleased to provide this budget summary and request for contract value increase for excavation oversight and materials management services for the Discovery Museum project. This document provides a summary of project - related costs incurred during the initial oversight and materials management phase of the project, including the period from July of 2010 through February of 2011. This document also includes estimated costs to complete required project close out reporting functions. Per your instructions, costs for supplemental oversight and materials management services which are expected to occur in late spring -early summer of 2011 are not included herein and will be addressed under a separate proposal. In general, the original estimated project budget was exceeded due to an extension of the anticipated soil disturbing oversight schedule, as well as the request for WALSH to include supplemental consulting services. These factors resulted in an increased level of effort and associated costs. The following table presents a comparison of the estimated project costs included in WALSH's initial July 23, 2010 proposal and actual costs incurred. As indicated above, the table also includes estimated costs to complete reporting functions for oversight and material management services completed to date. Costs have been grouped into general categories for ease of interpretation. Discovery Museum Budget Summary - Excavation Oversight and Materials Management Services Estimated Approximate Pending Difference: Costs (Included Costs Incurred Reporting Costs Actual/Pending Requested Cost Category in July 23, (Through (Period: July Costs from Contract Proposall)) February 25, 2010 - February Proposed Value Increase 2011) 2011) Labor $96,849.00 $177,835.00 $9,250.00 $90,236.00 Other Direct Costs $902.00 $855.00 $30.00 -$17.00 Subcontractors $8,129.00 $1,715.D0 $0.00 -$6,414.00 Equipment $7,807.00 $15,855.00 $90.00 $8,138.00 Total $113,687.00 $196,260.00 $9,370.00 $91,943.00 $91,943.00 Fort Collins Office: 2ti29 Redwing Rued • Suite ZWI • Fort Collins. Colorado • N0526-2N79 • Phone (970) 22-1-5ti55 • FAX 0701 22:11-8j77 Corptonete Office 44SA Paarl East Cicde • Suite 108 • Wmldar. Coluradu • A0301-2475 • Phone (31131443-3282 • FAX (303) 443430 FACILITIES REQUISITION FORgV1 l �� VENDOR Walsh Environmental Scientists & Engineers, Inc. DATE 3/31/11 � REQ BY: Ron Kechter CHARGE# 400501000.521160.1 Work Order # 426489 ANDING CONTRR WO # FAC-EN-01-2011 TOTAL COST: S91,943.00 - BUYER: Jim O'Neill OTY DESCRIPTION COST Provide additional Excavation Oversight and Materials Management Services for the new Discovery I Museum, net vour Provosal of February 25, 2011. S91.94. [d�)�(iiyy�I:��`►Iillllil`►1�[il��/�li[i� VENDOR# REQUISITION# DATE ENTERED: