HomeMy WebLinkAboutWORK ORDER - BID - 7206 FOSSIL CREEK EXTENSION & UNDERPASS AT COUNTY ROAD 38EEXHIBIT "A"
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
PBSSJ Inc,
Dated: 3/z-4/ I I
Work Order Number:
Purchase Order Number.
Project Title: Fossil Creek Trail Underpass @ W. Cry Rd. 38E
Commencement Date: 3/23/2011
Completion Date: 8/112011
Maximum Fee: $16,642.00
Project Description: Work shall primarily include post design services. Services include
reviewing construction submittals providing clarifications for design
questions and attending meetings or site visits as needed.
Scope of Services: See attached pages of scope for details
p
Acceptance Par Planniannln2 44a le ant
User
Service Provider agrees to perform the
services identified above and on the attached
forms in accordance with the terms and
conditions contained herein and in the
Services Agreement between the parties. In
the event of a conflict between or ambiguity in
the terms of the Services Agreement and this
work order (including the attached fortes) the
Services Agreement shall control.
Service Provider
By
Date:
CC: Purchasing
The attached forms consisting of two (EL
pages are hereby accepted and incorporated
herein by this reference, and Notice to
Proceed is hereby given.
City of Fort Collins
By:
Date:
Director of Purchasing and Risk Management
if over $30,000
3/1 V3011
POST DESIGN SERVICES
Fossil Creek Trail Extension & Underpass at County Road 38E
Bid No. 7206
PROJECT TASK
DESIGN FEE ESTIMATE
Hours
Cost
A.
Post Design Services
140
$16,272
SUBTOTAL
DIRECT EXPENSES
SUBCONSULTANT
TOTAL ESTIMATED DESIGN FEE
140 $16,272
$370
$0
$16,642
TOTAL. NOT TO EXCEED AMOUNT TO CONTRACT ($16,390) (Actual monthly expenses and consultant
services completed shall be billed monthly)
Project Cost Worksheet Backup for Structure Design
Fossil Creek Trail Extension & Underpass at County Road 38E
Structures Construction Services Budder
Structures & Locations
Approximate
Est.
Max.
Structure / Designation
Location
Lanolin
HL
GravityW atis
North of CR-38E
275 it
_
CBC / Caisson Walls
Underpass at CR-38E
445it
Pedestrian Bridge 1
South of CR-38E
100 it
-
2
_ _
South of CR48E
20 it -
Task Breakout / Work Hour Estimation
Project
Sr. Eng. II
Sr. CADD
AdrrM
Task
manager
SeuGures
Technician ll
Assist.
Talal
$126
$120
$86
159
No.
Desavi on
Hours
Comments
t)
Project Management & Contract Setup
10
4
14
2
Construction coordinalion Meetings/ field vlstls
16
16
32
Assume 2 meetings & 2 site visits (4 hrs each)
13)
Request for Information
8
12
8
28
Assume 4 RFI's with memorandum responses
(4)
Working Drawing Review
--
-
a.
Pedestrian Railing (Steel) (Special)
4 -
4
General conformance review
b.
Bridge Rail (Type 3)
4
4
_
General conformance review
d.
Pedestrian Railin(Steel)q
4
-
General conformance review
(5)
Shop Drawing Review
a.
Pefabricated Bridge 12 TotaO
10
10
Geometry and general conformance review
b.
recast x invert
12
12
Includes geometry design and rating review
c.
Gravity walls
-
4
4
General conformance review
d.
Shotcrete
2
- -
2
General confornarreview
—sce -
(6)
Product Specifications Review
-
,
a.
Cut Slone Veneer ABil
achmems
-,q.,
- -- --
q
(7)
General Structural Engineering Support
6
2
8
Responding to eneral questions & field errors
B
Pro act Walkthro hand Punchlisl Development
6
6
2
14
Res ndi to eneral uestions & field errors
(8)
Design Modifications Due to Contractor R uested Changes
o
Not inGuded - requires additional task order
Total Preliminary Structure Designi
46
84
e
8
140
6
$5,040
$10.0110
Jfi88
$464
28.6%
60.0%
6.7%
5.7%
D1 axition
100.0%