HomeMy WebLinkAboutCHANGE ORDER - RFP - 7077 LINDEN STREET STREETSCAPE PROJECT (4)City Of Planning, Development& Transportation
Fortlnooring
Collins 281 Northc
81 North Cc8a9e Avenue
P.O. Box 580
_DCjIDEEflrlg Fort Collins, CO 80522.0680
970.221A805
970,221.6378-fax
Change Order Form 2r SC
i
PROJECT TITLE: Linden Street Streelscape Improvements 1
PROJECT NUMBER: 400903707 (Proposal #7077)
CONTRACTOR: HDR Engineering, Inc. (PO #9100931)
CHANGE ORDER NUMBER: 3
n preparing change orders show in order as separate numbered paragraphs the o oPvmg:
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change in contract time.
1&2. See attached sheet for detail.
3. There is no contract cost increase
4. There will he no change in contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED Cl IANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
ACCEPTED BY:
REVIEWED BY:
SUBMITTED BY:
0.00Y
0.00%
$292.027.39
$0.00
$0.00
$0.00
S292,027.39
_3/'4/2ou
3 I l (Jl
APPROVED BY: 0. 1)1zstfi IA-),h,L- DATE: .3' II • I
, J/ epartment Hea
APPROVED BY:
(Purchasing Agent over $00,000)
i cc: ConOactor
Purbasing
Project He
L9t\IS
ESTIMATE OF COSTS
The following cost estimate is for work to be completed by Tatanka Historical Associates only,
and does not include the design tasks to be completed by BHA Design or fabrication of the
signs themselves.
Tatanka Historical Associates' estimate is based upon its project management expectations,
together with preparation of signage text and images, along with coordination with signage
designer BHA Design.
Definition of Signage Topics (4 hours x $100.00/hr.) $400.00
Draft Text & Images (21 hours x $100.00/hr.) $2,100.00
Final Text & Images (21 hours x $100.00/hr.) $2,100.00
Project Total
$4,600.00
"Note: This estimate was prepared with an expected total of seven signs. Any increase
in this number will require additional work, and will result in a corresponding change to
the project cost estimate.
TATANKA H IS F ORICAI ASSOCIATES. INC.
BRINGING THE PAST TO LIFE
March 4"i, 2011
Mr. Dean Klingner
City of Fort Collins
281 North College
Fort Collins, Colorado 80524
Re: Linden Street Streetscapes DBE Goal adjustment
Dear Mr. Klingner:
This letter is to inform you of how the subject project scope has evolved over the past year and the affects
the changing scope has had on the achievable DBE percentage. Initially, the DBE goal for the project
was set at 1 1.25%. In HDR's initial fee proposal on January 22, 2010, we had proposed to exceed this
goal by allocating 15.06% of the work to DBE qualified sub consultants. In April of 2010, we were
notified by the City that the utility department elected to remove the hydraulics report, storm drain design
and storm water management plan services from our task order to complete in house using one of their on
call consultants, Ayers. This adjustment in scope adversely affected two of our DBE sub consultants,
Goodbee and Associates and Pinyon Environmental as the work we had proposed them to complete was
eliminated from our scope. With the elimination of these scope items, the maximum DBE percentage we
were able to attain was 9.27%.
Through the evolution of the project, the City has asked HDR to complete some additional scoping items
to enhance the project. The items requested required further engineering and right of way services and
streetscape coordination. These additional items were not work elements the DBE firms on our team
specialized in; therefore we could not pass this additional work on to them. With the recent change order
request of $25, I21.45 to account for these additional items, the DBE percentage for the overall contract
will drop to 8.42%.
For your reference, l have attached a spreadsheet we have been using to track the contract and DBE goals
through the course of the project. If you have any questions or need any additional information, please
feel free to contact me at (303) 764-1581.
Sincerely,
HDR ENGINEERING, INC,
Jason Wenge ,;E��
.
Project Manager
Enclosure
aaa En9inaerinp, Inc.
303 East 17111 A,nuc I Ph n .. 1303) 764 1520
Suit'.700 Fax I303l am7130
D. CO 6026}1256 .hd m.c
�!
��
) !
| (
\ � -
{ \
/
!.........
.
/)| 7
t!.
February 16, 2011
Mr. Dean Minister
City of Fart Collins
281 North College Ave.
For( Collins. Colorado 80524
Its: Lindou Street Slrcroscapes cantnmt a(Ijustntents
Dear Mi. Kingman:
This letter is to inform you of the additional work incurred or requested of HDR and our Subcunsultnnls in
completing the final design of the Linden Street Suretsenpe Improvements pnfject. Our team has
i tengrted to work these items into the initial project fee anrmmt but we have now reached a point where
we are constrained oil the ren wining fonds to finalize the project.
As you are aware, the level of error( and additional tasks required to ,oruplon, the final design has
exlmnded from the originally scraped clIN I denial January of 2010. Although these additional services
have been neccsanry for due diligence, agency supportand project enhancement, our original lice propovd
did not account for These additional items. The items identified are listed in the attached individual letters
for your reference.
In addition to these tasks, the project schedule has also been extended 3 months front the original
scheduled completion data of July 2010. "Phis is primarily due to the detailed evaluation and deeclolumnt
ofaltcivatives at the beginning of the project and coordination will, multiple internal departments within
the City to provide direction on the prelern al alun natNri.
I [DR would like to ask the City to please cousicku shifting $25,121.45 within the contract to compensate
for the additional services identified in the allachments. This amountwill assist in bringing our team back
within budget to complete the design ofthe proita t.
After considering our proposed request, ifyau hnvcally questions or neo i additional information, please
feel free in contact me at (301) 764-1581.
Sinaerely,
Y
ENG`'IINN6EER^I'N�G,,INC.,
wri y , 'FI .F:.
Project Manager
Enclosure
man rust or or a a. In e. .10, nPo nai 1.. r, r^nu rHl9nmI 6+11
anmIoo
PROJECT COST WORKSHEET
(COST PLUS FIXED FEE - Standard Billing Rate, Prime Consultant)
Project Number
Linden Street
Location
303 E. 17th A,
Firm Name
HOP Engineer
Name of Preparer
Jason Wenger
Scope of Work Date
February 15, 2
Type of Proposal: COST PLUS FIXED FEE
HDR NON -FEE LABOR COSTS
Additional
Contract time
EMPLOYEE
EMPLOYEE
LABOR RATE
ESTIMATED NUMBER
ESTIMATED COST
NAME
CLASSIFICATION
$/HOUR
OF WORK HOURS
PER EMPLOYEE
Folwell, Matt
Project Engineer
$ 100.38
22.00
S 2,208.36
Gariss,Sid
CADD Technician
$ 63.71
62.00
$ 3,950,02
Wenger, Jason
Project Engineer
S 160.88
24.00
$ 3,861.12
TOTAL LABOR $ 10,019.50
2) FEE 10.00%
X Section I
FIXED FEE S 1,001.95
3) OTHER DIRECT COSTS (OUTSIDE)
ITEM ESTIMATED UNIT ESTIMATED
UNITS RATES UNITS COST
Reproduction Actual reasonable cost $ 120.00
Airfare 8 Travel Actual reasonable cast subject to prior approval of CDOT project manager $ -
Miscellaneous Actual reasonable cost subject to prior approval of CDOT project manager $ 280.00
DOC TOTAL $ 400.00
TOTAL HDR SERVICES $ 11,421.45
EMPLOYEE
NAME
EMPLOYEE
CLASSIFICATION
LABOR RATE
$ / HOUR
ESTIMATED NUMBER
OF WORK HOURS
ESTIMATED COST
PER EMPLOYEE
Roger Sherman
Principal
118.18
14.00
S 1,654.55
Angela Milewski
Principal
118.18
0.00
S -
Jared Howe
Project Manager
81 S2
12.00
$ 981.82
Mike McBride
Landscape Architect Apprentic
68.18
80,00
$ 5,454.55
TOTAL LABOR S 8,090.91
2) FEE
10.00% X Section I
FIXED FEE
$ 809.09
3)
OTHER DIRECT COSTS (OUTSIDE)
ITEM
ESTIMATED
UNIT
ESTIMATED
UNITS
RATES
UNITS
COST
Reproduction
Actual reasonable cost
S 161
Mileage
Current government rate
8o
Sa500
miles
S 40.00
ODC TOTAL
$ 200.00
TOTAL OUTSIDE SERVICES
$ -
TOTAL BHA SERVICES
$ 9,100.00
TOTAL ESTIMATED COST
$ 9,100.00
EMPLOYEE EMPLOYEE
LABOR RATE
ESTIMATED NUMBER
ESTIMATED COST
NAME CLASSIFICATION
3/HOUR
OF WORK HOURS
PER EMPLOYEE
Ran Sladek President
S90.91
46,00
$ 4,181,82
TOTALLABOR
$ 4,181.82
2) FEE 10,00% X Section I
FIXED FEE
$ 418.18
3) OTHER DIRECT COSTS (OUTSIDE)
ITEM
ESTIMATED
UNIT
ESTIMATED
UNITS
RATES UNITS
COST
Outside reproduction Actual reasonable cost
$
CDC TOTAL
$
TOTAL TATANKA AND ASSOCIATES SERVICES
$ 4,600.00
TOTAL PROPOSED ADDITIONAL SERVICE FEE REQUEST
$ 25,121.45
Linden Street Streetscape Project
Task 8.0 Additional Services
Deliverables &Subtasks
OA/OC CDOT
Liaison
Pmj
Mgr
Senior
Engr
Road/Civil
Engr
Senior H8H
Engr
H8H Eng
Senior Traffic
En 9
Traffic
En r
9
Rail Eng.
Senior Tech
Project
Controller
Subletal
Labor
Task 8.0 Additional Services
Develop CDOT SWMP Plans per COOT
2
4
6
12
PUC Application
8
4
12
24
ROW Plan Development
10
8
40
58
Schedule extended 8 months
_
0
Resolve Ayers conflicts/coordination
4
6
4
14
I
o
0
—
----
0
__
0
0
0
_0.
Total Hours
ol
24
22
OI
0
0
0
0
O
62
0
108
Non Fee Labor Rate
165.46
$ 160.88
$ 10c.38
$ 82.77
$ 146.16
$ 103.33
$ 120.03
$ 102.55
$ 9420
$ 63.71
$ 72.49
Total Non Fee Labor Pale
I
I
I
I$
10.0;i
Linden Street January 21, 2011
BHA Additional Services
Task
I Additional Fee
Renderings (total cost of $4,185 minus $1,160 set aside for 'preparation of presentation
materials')
$3,250
Elongated schedule requiring additional meetings and presentations
$750
Additional presentations/meetings/graphics with land owners
$600
Additional coordination with Sue Paquette project team
$1000
Artist/Historical Consultant Coordination, multiple meetings
$1000
Attendance of ODA Meetings (2)
$600
DDA Narrative for 2° Meeting
$850
DDA Graphics/Handouts/Power Point for 2° Meeting
$350
Historic Marker Details/Coordination with Historical Consultant
$700
Total Additional Fees
$9,100.00
Tatanka Historical Associates, Inc.
-01
612 S. College Ave., P.O. Box 1909
Fort Collins, Colorado 80524
tatanka@verinet.com
970.221.1095
11 February 2011
Jason Wenger
HDR Engineering Inc.
303 E. 17" Ave., Suite 700
Denver, CO 80203
Subject: Linden Street Interpretive Signage
CONSULTING SERVICES PROPOSAL
Dear Jason,
Please accept this document as my proposal for the completion of interpretive signage
materials for the Linden Street project in Fort Collins. The goal of this work will be to write text
for the signs, assemble images that are appropriate to each topic, and work with BHA Design to
support completion of the signage.
The following scope and cost estimate is based upon an assumption that the city will proceed
with a total of seven signs. If this number of signs is changed, we will need to discuss an
amended fee estimate at that time.
Thank you for the opportunity to submit this proposal.
Regards,
Ron Sladek
President
I ATANKA HISTORICAL ASSOCIATES. INC.
BRINGING THE PAS"f TO LIFE
SCOPE OF SERVICES
Tatanka Historical Associates has provided interpretive signage services at other historic sites
in Colorado, and is experienced with the type of work involved with this effort. The following
tasks will be completed, based upon our understanding of the project and its requirements for
interpretive signage preparation:
I. Definition of Topics
a. Discussions will be held with necessary project stakeholders to ensure that there
is consensus regarding the topics that will be addressed in the project area's
signage.
II. Preparation of Text & Images
a. All necessary research and writing will be completed to prepare text for the
signs. In addition, Tatanka will locate relevant images to accompany the text in
each location. The text and images for each sign will be submitted in draft form
for review by city staff and any other project stakeholders. Coordination with
BHA Design will also take place at this stage to ensure that the text and images
will comply with space and design restrictions for each sign location.
III. Revision & Submission of Final Draft Signage
a. Upon receipt of comments from city staff and stakeholders, the signage text and
images will be edited and revised. The text and images for each sign will then
be submitted to the City and other relevant parties (such as BHA Design) in final
draft form, both hard copy and digitally.
TAT'ANNA HISTORICAL ASSOCIATES. IPIc.
BRINGING THE PAST TO LIFE