Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7161 COLLEGE AVENUE AND HARMONY ROAD LANDSCAPE AND URBAN DESIGNt City of 0% I/,"',torl: Collins t Planning, Development & Transportation E•ngineoring 281 Forth Collage Avonuo P.O. Box 680 Fort Collins, CO 80S22,0580 970.221.6606 970,221,6378 - tax Change Order Form PROJECT TITLE: Harmony/College Landscape & Urban Design Improvements PROJECT NUMBER: 400901802.6 (Bid #7161) CONTRACTOR, American Civil Constructors (PO 49104728) CHANGE ORDER NUMBER: 4 n prepanng c range orders show of order. as separa a numbered paragraphs 1e following: 1. Reason for change: 2. Description of change. 3. Change in contract cost. 4. Change in contract time, 1 &2. See attached sheet for detail, 3. The contract cost will decrease by $ 8,633.66 4. There Wit be no change in contract time. ORIGINAL CONTRACT COST $638.617.00 TOTAL APPROVED CHANGE ORDERS $16,479.76 TOTAL PENDING CHANGE ORDERS $0,00 TOTAL THIS CHANGE ORDER $8,633,65 TOTAL % OF THIS CHANGE ORDER 1.35% TOTAL G.U. % OF ORIGINAL CONTRACT 4.25% ADJUSTED CONTRACT COST $666,730.41 (Assuming all change orders approved) ACCEPTED BY-_ - DATE: 2 2 ractor's presentative) �/ 2 REVIEWED BY: /.� DATE: I J (En ip er) c SUBMITTED BY: DATE: 3 '! (Project Manager APPROVED BY: d DATE: (D artment end) APPROVED BY: DATE: (Purchasing Agent over $60,000) cc: Contractor Purchasing Prolect File {{{F F CHAN0E0RUER4 I Colleen Harmony Landscape and Urban Design Protect 4 SUMMARY OF WORK n„wnrn„ £Irh.0 Tnmt 1 Additional Solf At SE Corner 1 LS $ 0,502.00 $ 0.592.00 2 Additional Soil at NF. Corner 1 LS $ 1,222.00 $ 1,222.00 3 Install cltcult breakers on Irrigation Conotrllers 2 EA $ 336.00 $ 670.00 f Irrigation Repair at Firestone Manhole 1 LS Is 149:05 1 $ 149 05 TOTAL $ 8,633.65 EASOR FOR CHANGE 1 Additional soil was placed on College Avdnue In the vicinity or the old gaurdraU. 2 Additional Soil was needed at Schroders [andscopo area duo to the oxtslinit sell being aravel cead base. Chcull Breakers were required behvaen high voltage City power line and the initiation cohlroders Unit were connected directly to Ilia power 3 tines. 4 An hrigatton repair was necosaary due to abroken poly line that occurred when a manhola was Installed near nrestona buiidtne. WHEN POSTED Pasted to Pay App rot i J PO on Pay Appff4 j $ 6,602.00 I i $1,222.00 1 $ 670,00 f i $ 149.65 $ 8,633,66