PROJECT TITLE: Harmony/College Landscape & Urban Design Improvements
PROJECT NUMBER: 400901802.6 (Bid #7161)
CONTRACTOR, American Civil Constructors (PO 49104728)
CHANGE ORDER NUMBER: 4
n prepanng c range orders show of order. as separa a numbered paragraphs 1e following:
1. Reason for change: 2. Description of change.
3. Change in contract cost. 4. Change in contract time,
1 &2. See attached sheet for detail,
3. The contract cost will decrease by $ 8,633.66
4. There Wit be no change in contract time.
ORIGINAL CONTRACT COST
$638.617.00
TOTAL APPROVED CHANGE ORDERS
$16,479.76
TOTAL PENDING CHANGE ORDERS
$0,00
TOTAL THIS CHANGE ORDER
$8,633,65
TOTAL % OF THIS CHANGE ORDER
1.35%
TOTAL G.U. % OF ORIGINAL CONTRACT
4.25%
ADJUSTED CONTRACT COST
$666,730.41
(Assuming all change orders approved)
ACCEPTED BY-_ - DATE: 2 2
ractor's presentative) �/ 2
REVIEWED BY: /.� DATE: I J
(En ip er)
c
SUBMITTED BY: DATE: 3 '!
(Project Manager
APPROVED BY: d DATE:
(D artment end)
APPROVED BY: DATE:
(Purchasing Agent over $60,000)
cc: Contractor
Purchasing
Prolect File
{{{F
F
CHAN0E0RUER4
I
Colleen Harmony Landscape and Urban Design Protect
4 SUMMARY OF WORK
n„wnrn„ £Irh.0 Tnmt
1
Additional Solf At SE Corner
1
LS
$ 0,502.00
$ 0.592.00
2
Additional Soil at NF. Corner
1
LS
$ 1,222.00
$ 1,222.00
3
Install cltcult breakers on Irrigation Conotrllers
2
EA
$ 336.00
$ 670.00
f
Irrigation Repair at Firestone Manhole
1
LS
Is 149:05
1 $ 149 05
TOTAL $ 8,633.65
EASOR FOR CHANGE
1
Additional soil was placed on College Avdnue In the vicinity or the old gaurdraU.
2 Additional Soil was needed at Schroders [andscopo area duo to the oxtslinit sell being aravel cead base.
Chcull Breakers were required behvaen high voltage City power line and the initiation cohlroders Unit were connected directly to Ilia power
3 tines.
4 An hrigatton repair was necosaary due to abroken poly line that occurred when a manhola was Installed near nrestona buiidtne.
WHEN POSTED
Pasted to Pay App rot
i
J
PO on Pay Appff4 j
$ 6,602.00 I
i
$1,222.00
1
$ 670,00 f
i
$ 149.65
$ 8,633,66