Loading...
HomeMy WebLinkAboutRESPONSE - BID - 7150 SMALL LANDSCAPE AND IRRIGATION ANNUAL (2)Bid Schedule Addendum 1 7150 Small Landscape and Irrigation Annual For base bid, additions and deletions to the Contract, the following bid prices shall be applicable for the specific items listed. Bid Prices shall be complete, in place including required labor, materials, permits, equipment, implements, testing, parts and supplies necessary for, and incidental to proper installation, as indicated in the Standard Specifications and Details. 1. The Contractor agrees that for the base bid, requested and/or required changes in the scope of work, the Contract Sum shall be adjusted in accordance with the following bid prices, where the Owner elects to use this method of determining costs. 2. The Contractor agrees that for the base bid and requested and/or required changes in the scope of work for items not listed in the bid items shall be priced according to agreed upon time and materials costs. 3. The Contractor is advised that the bid prices will enter into the determination of the successful bidder. Unreasonable prices may result in rejection of the entire bid proposal. DEMOLITION ITEM QUANTITY UNIT PRICE ITEM COST Protection Fence - 4' Snow Fence with 'T' posts. 100 LF $ - 2 0 /LF $ 2 0 0.0 0 EARTHWORK AND UTILITIES ITEM QUANTITY UNIT PRICE ITEM COST Topsoil Stripping and Stockpiling 25 CY $ 3. 5 0 /CY $ 87.50 Topsoil Spreading and Placement 25 CY $ 3.2 5 /CY $ 81 . 25 Erosion Control Fabric — NAG C350 100 SF $ ' 1 5 /SF $ 1 5 0. 0 0 Erosion Control Fabric —NAG 120 100 SF $ - 1 5 /SF $ 1 50.00 Erosion Control - Silt Fence 1000 LF $ - 4 3 /LF $ 4 3 0.0 0 Erosion Control — Bales 4 EA $ 5.0 0 /EA $ 20.00 Erosion Control — Gutter Wattle 1 EA $ 3 8.0 0 /EA $ 3 8. 0 0 Erosion Control — Inlet Wattle 1 EA $ 3 8. 0 0 /EA $ 3 8. 00 Erosion Control — Ditch Wattle 1 EA $ 7 5. 0 0 /EA $ 75.00 Straw Mulch 1000 SF $ - 15 /SF $ 1 5 0. 00 Hydromulching 1000 SF $ - 1 8 /SF $ 180.00 Hydroseeding — Seed Mix B Fescue Mix 1000 SF $—, 2 5 /SF $ 2 0 0. 0 0 Hydroseeding — Seed Mix C Low Water Mix 1000 SF $ - 2 3 /SF $ 230.00 Bid Schedule Addendum 1 7150 Small Landscape and Irrigation Annual For base bid, additions and deletions to the Contract, the following bid prices shall be applicable for the specific items listed. Bid Prices shall be complete, in place including required labor, materials, permits, equipment, implements, testing, parts and supplies necessary for, and incidental to proper installation, as indicated in the Standard Specifications and Details. 1. The Contractor agrees that for the base bid, requested and/or required changes in the scope of work, the Contract Sum shall be adjusted in accordance with the following bid prices, where the Owner elects to use this method of determining costs. 2. The Contractor agrees that for the base bid and requested and/or required changes in the scope of work for items not listed in the bid items shall be priced according to agreed upon time and materials costs. 3. The Contractor is advised that the bid prices will enter into the determination of the successful bidder. Unreasonable prices may result in rejection of the entire bid proposal. DEMOLITION ITEM QUANTITY UNIT PRICE ITEM COST Protection Fence - 4' Snow Fence with 'T' posts 100 LF $ _ 2 p /LF $ o - A 0 EARTHWORK AND UTILITIES ITEM QUANTITY UNIT PRICE ITEM COST Topsoil Stripping and Stockpiling 25 CY $ 3.5 0 /CY $ 8 7.5 0 Topsoil Spreading and Placement 25 CY $ 3.2 5 /CY $ 81 . 2 5 Erosion Control Fabric — NAG C350 100 SF $ _ 1 5 /SF $ 1 5 0 _ Erosion Control Fabric — NAG 120 100 SF $ a 5 /SF $ 1 n Erosion Control - Silt Fence 1000 LF $ .43 _/LF $ 4 3 0. 0 0 Erosion Control — Bales 4 EA $ 5 n D /EA $ 2 0. 0 0 Erosion Control — Gutter Wattle 1 EA $ 3 8. 0 0 /EA Erosion Control — Inlet Wattle 1 EA $ 38.00 /EA $ 3 8. 0 0 J, Erosion Control — Ditch Wattle 1 EA $ 7 s /EA $ 7 5. 0 0 Straw Mulch 1000 SF $-1_5 /SF $ 1 50 Hydromulching 1000 SF $ /SF 8 Hydroseeding — Seed Mix B Fescue Mix 1000 SF $_ . 25__/SF $� 0 Hydroseeding — Seed Mix C Low Water Mix 1000 SF $ 23 /SF $ 230 IRRIGATION UNIT ITEM ITEM QUANTITY PRICE COST Electric control valves Weathermatic 8200CR-10D 1 $:51 F/EA 1$31, 3 2 2 � Electric control valves Weathermatic 8200CR-15D 1 $ EA $I 71 _ BB Electric control valves Weathermatic 8200CR-20D 1 $2,3L_2.5/EA $? 1 ti � � Electric control valves Weathermatic 8200CR-25D 1 $41 3 _ 7JEA $ a 1 -1_ 7 -, Electric control valves Weathermatic 8200CR-30D 1 $5DL,25/EA $ q p 2 -, Electric control valves Griswold 2000L 1 $ 3 4. 9/fjA $3 3 4 9 q Electric control valves Griswold 2000M 1 $a 1 a ti 6/EA $ a 3_ 6 h Electric control valves Rainbird 075 DV 1 $12T3_&__/EA $ 1 2 -1R Electric control valves Rainbird 100 DV 1 $1 2. 3 B /EA Electric control valves Rainbird 100 DVF 1 $a - -_ � n /EA k3_2 n_ Electric control valves Rainbird XCZ-075-PRF 1 $� 0 , -1 /EA Electric control valves Rainbird XCZ-075-PRF-BF 1 $ EA $3 5 88 Electric control valves Rainbird XCZ-LF-100-PRF 1 $z 0 a /EA $ 3 3 n a Electric control valves Rainbird 1" PESB-PRS 1 $7 a R a /EA $ T a u a Electric control valves Rainbird 1 1 /2" PESB-PRS 1 $Q F, 4 R EA $ 95 48 Electric control valves Rainbird 2" PESB-PRS 1 $ 1? 1 A $ 12,so Electric control valves Rainbird 300 BPES 1 $3,TT EA $r , g Quick coupler valve Rainbird 5-RC 1 $5 j n /EA $ 1 v n Spray heads Rainbird 1806-SAM-PRS 12 $ c�/EA $9. 9 5 Spray heads Rainbird 1804-SAM-PRS 12 $' 4 F, q /EA $ 54. 60 Spray heads Rainbird 1804 12 $� �/EA $ 1 R a RA Rotors Rainbird Falcon 6504 FC SS 12 $3 2. 0 7 /EA $ 3 B 4 B 4 Rotors Rainbird Falcon 6504 PC SS 12 $343 5 /EA $� Rotors Rainbird 5505-SS 12 . $2 n 3 /EA $ 24 a? nn Rotors Rainbird 8005-SS 12 $4 2 _ q cl /EA $ 51 4 _ B n Rotors Hunter 1-20-04-SS 12 $1_7 ti sz /EA $ 21 2 _ 1 6 Rotors Hunter 1-25-04-SS 12 $3 4_ 3 a /EA $ 419 0 8 Rotors Hunter 1-40-04-SS-ON 12 $4 B_ 6 q /EA $ 5 8 4 218 Rotors Hunter 1-40-04-SS 12 $S3_Z4_/ EA $654F,.7 2 Controllers Irritrol MC-12 1 $4 2 EA $ 4 2 3. 2 B Controllers Irritrol MC-18 1 $65Z_gp/EA $657 gq Controllers Irritrol MC-24 1 $TT2_2VEA $ U 2. 2 0 Controllers Irritrol MC-36 1 $ 1 3 4 q_ 7 0 Controllers Aqua Conserve ET-6 1 $ 1 B 3 /EA $ 1 g3 Controllers Aqua Conserve ET-9 1 $ 2n_o__/EA $ 2 0 0 n n Controllers Aqua Conserve ET-14 1 $ 5 /EA $ 2 7 -,' o n Fabricated swing joints PVC w/marlex street elbows Cost assembled 1 $� EA $ 21 . 3 9 LANDSCAPE Finish Grading Organic Amendment Seed Mix A — Bluegrass Mix Seed Mix B — Fescue Mix Seed Mix C — Low iwater Mix Seed Mix D — Native Mix Seed Mix E — Riparian Mix Seed Mix F — Wildflower Mix Bluegrass Sod over 5000 sf Bluegrass sod under 4999 sf Fescue Sod over 5000 sf Fescue Sod under 4999 sf Buffalo Grass Sod Evergreen Tree - #15 container Evergreen Tree — 6' height Evergreen Tree — 8' height Evergreen Tree —10' height Deciduous Canopy Tree — 2" caliper Deciduous Canopy Tree — 2 1/2 " caliper Deciduous Canopy Tree — 2 3/4 " caliper Deciduous Canopy Tree — 3" caliper Deciduous Ornamental Tree —1 1/2 " caliper Deciduous Ornamental Tree —1 3/4 " caliper Deciduous Ornamental Tree — 2" caliper Deciduous Ornamental Tree — 2 1/4 " caliper Deciduous Ornamental Tree — 2 '/2 " caliper Deciduous Shrub - #1 container Deciduous Shrub - #5 container Evergreen Shrub - #1 container Evergreen Shrub - #5 container Perennial — 4" pot Perennial - #1 container Ornamental Grass - #1 container Deciduous Tree Staking Assembly Wood Deciduous Tree Staking Assembly T-post 100 SF 100 CY 3000 SF 3000 SF 3000 SF 3000 SF 3000 SF 3000 SF 7000 SF 3000 SF 7000 SF 3000 SF 1000 SF 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA, 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA $ 05 /SF $ 18.00/CY $_. 0 5 /SF $ . 0 4 /SF $ . 03 /SF $ . 05 /SF $ . 06 /SF $_07 /SF $_28 /SF $ .31 /SF $ . 275 /SF $ . 29 /SF $1.10 /SF $11�F:�Q/EA $egg/EA $34R 75/EA $&I�/EA $1 81 . 2 5-/EA $218.75/EA $ .18.75/EA $ 25ti _ 25/EA $168.75/EA $181 .25/EA $20�?�/EA $ - 0 6 _ . 5 /EA $243.75/EA $ 8.7 5 /EA $ 15.00/EA $ 28. 00/EA $ 21_titi/EA $ 5 2. 5 0 /EA $tea 8 6 /EA $ 8. 0 8 /EA $_ 1G__0_Q,/EA $ 6 7 5—_/EA $ 5 00— $1800.00 $150.00 $120.00 $ 90.00 $ 150.00 $180.00 $210_00 $ratio 00 $930.00 $1 5.00 $ 870. 00 $1100.00 $112 50 $ 22 - 00 $ 51 7 50 $1R1 _25 $21R_7�, $181.25 $ -06_ $ 22 0 —2 $ 243. 75 $8.75 $15.00 $28.00 $ 52.50 $a_oa $10.90 $ 6.75— Evergreen Tree Staking Assembly Wood Evergreen Tree Staking Assembly T-post Crusher Fines Buff Crusher Fines Red Weed Barrier Organic Mulch 3/a" Rock Mulch Labor Charges Landscape supervisor Labor for landscape operations Labor for watering of plant material Irrigation supervisor Labor for irrigation operations Labor for irrigation operations after hours TOTAL - Costs For All Items Total Cost 1 EA $ 1 0.0 0 /EA $1 0.0 0 1 EA $- . 7 /EA $6.7 5 1000 CY $ L6 n /CY 1000 CY $LS-0-O-_/CY $ 1 5. 0 0 1000 SF $ .05 /SF $ 50.00 1000 CY $ 20,00 /CY $2 0 0. 0 0 1000 CY $ 21 _0 0 /CY $ 21 0 -.0 0 50 HOURS $ p n n. /Hour %50(- IAour 50 HOURS $ 25. 00 /Hour $k250.016our 50 HOURS $ an _ n0 /Hour y,000. 019our 50 HOURS $ �9. o�/Hour $1 500: OWur 50 HOURS $ 2 5.0 0 /Hour $1 2 5 0 . Nour 50 HOURS $ 3 5.0 0 /Hour $1 7 5 0 . Wur TOTAL COST $ 9250.00 Total Cost In Writing Thirty Five Th���hree Hundred Sixty Eight- Dollars anc Eight Cents Attach hourly Equipment/Operator rates to be used for Force Account wnrk Riding mower Push mower String trimmer Skidsteer Backhoe Dump truck Trencher Aerator HOUR $ 36.00' HOUR $ 25.00 HOUR $ 20.00; HOUR $ 50.00- -HOUR $ HOUR $65.00 HOUR $ 50.00 HOUR $ 40-00 HOUR $ mark mark up (maximum up over markup* is 10% under $500 under $500 and $500 8% over $500) Plant material 8 g 5 % Landscape material s Irrigation parts/pipe g$ s Signature: «Q LW3.YATitle:Member Date: i n 1 4/ 1 n Print Name:_ Steve K Korby Company:- Korby Landscaping LLC Phone: 970-568-7633 Address: 3201 E Mulberry Street Units 'Email6+60EQ' ORBYUA-05cAP-E�: am Address• Ft. Collins CO 80524-8476 City, State, Zip Code: IRRIGATION UNIT ITEM ITEM QUANTITY PRICE COST Electric control valves Weathermatic 8200CR-1 OD 1 $1 - _= 2 EA $ 7�- ---f-7 Electric control valves Weathermatic 8200CR-15D 1 $171 -88/EA $ 171 .88 Electric control valves Weathermatic 8200CR-20D 1 $2 3 6.2 5EA $ 2 3 6.2 5 Electric control valves Weathermatic 8200CR-25D 1 $41 3.7 5/EA $ 41 3.75 Electric control valves Weathermatic 8200CR-30D 1 $5 0 6.2 5/EA $ 506.25 Electric control valves Griswold 2000L 1 $3 3 4.9 9/EA $ 334.99 Electric control valves Griswold 2000M 1 $4 3 4.6 6/EA $ 434.66 Electric control valves Rainbird 075 DV 1 $1 2.38 /EA $ 1 2.38 Electric control valves Rainbird 100 DV 1 $1 2.3 8 /EA $ 12.38 Electric control valves Rainbird 100 DVF 1 $1 3.2 0 /EA $ 1 3.2 o Electric control valves Rainbird XCZ-075-PRF 1 $3 1 1 F /EA $ 3-4 - 1 f; Electric control valves Rainbird XCZ-075-PRF-BF 1 $3 --, R R /EA $y S _ 8 8 Electric control valves Rainbird XCZ-LF-100-PRF 1 $30 4 /EA $ 3 3.0 4 Electric control valves Rainbird 1" PESB-PRS 1 $7 _B 4 /EA $ - 7 4.8 4 Electric control valves Rainbird 1 1/2" PESB-PRS 1 $9 5.4 8 /EA $ 9 5.4 8 Electric control valves Rainbird 2" PESB-PRS 1 $1 21 .80'EA $ 121.80 Electric control valves Rainbird 300 BPES 1 $31 9.0 CYEA $ 319.00 Quick coupler valve Rainbird 5-RC 1 $51 .70 /EA $ 5�1 70 Spray heads Rainbird 1806-SAM-PRS 12 $9.9 5 /EA $ 1 1 9.4 0 Spray heads Rainbird 1804-SAM-PRS 12 $4 ,_5 5 /EA $ s a F o Spray heads Rainbird 1804 12 $1 _3 6 /EA $ 384.84 Rotors Rainbird Falcon 6504 FC SS 12 $3 2.0 7 /EA $ 3 8 4.8 4 Rotors Rainbird Falcon 6504 PC SS 12 $31 .35 /EA $ 3 7 6.2 0 Rotors Rainbird 5505-SS 12 $2 0.3 5 /EA $ 244.20 Rotors Rainbird 8005-SS 12 $4 2.9 0 /EA $ 51 4.8 0 Rotors Hunter 1-20-04-SS 12 $17.68 /EA $ 212.16 Rotors Hunter 1-25-04-SS 12 S4 _ A /EA $ 41 2 _ n R Rotors Hunter 1-40-04-SS-ON 12 $4 8.6 9 /EA $ 584.28 Rotors Hunter I-40-04-SS 12 $5 3.81 /EA $ 6 4 5.7 2 Controllers Irritrol MC-12 1 $4 2 3.2 8/EA $ 423.28 Controllers Irritrol MC-18 1 $6 7.80/EA $ 657.80 Controllers Irritrol MC-24 1 $7 7 2. 2 CYEA $ 7 7 2. 2 0 Controllers Irritrol MC-36 1 $1 3 4 9.7/EA $ 1 3 4 9.7 0 Controllers Aqua Conserve ET-6 1 $18 3.0 (YEA $ 1 8 3.0 0 Controllers Aqua Conserve ET-9 1 $2 0 0 _ o UEA -$ 2 0 0.0 0 Controllers Aqua Conserve ET-14 1 $2 7 5.0 (YEA $ 2 7 5.0 0 Fabricated swing joints PVC w/marlex street elbows Cost assembled 1 $21 .3 9 /EA $ 21 .3 9 LANDSCAPE Finish Grading 100 SF $ 0 5 /SF $ 5 0 0 Organic Amendment 100 CY $ 1 8.0 0 /Cy $ 1 8 0 0.0 0 Seed Mix A - Bluegrass Mix 3000 SF $ • 05 /SF $ 1 50.00 Seed Mix B - Fescue Mix 3000 SF $ _ 0 4 /SF $ 1 2 0 _ o 0 Seed Mix C - Low water Mix 3000 SF $ - 0 3 /SF $ 9 0.0 0 Seed Mix D -.Native Mix 3000 SF $_.. 05 /SF $ 1 50. 00 Seed Mix E - Riparian Mix 3000 SF $ - 06 /SF $ 1 80. 00 Seed Mix F - Wildflower Mix 3000 SF $ ' 07 /SF $ 210.00 Bluegrass Sod over 5000 sf 7000 SF $_. 28 /SF $ 19.60 00 Bluegrass sod under 4999 sf 3000 SF $ . �t4/SF $ gja a� Fescue Sod over 5000 sf 7000 SF $ _ 2 7 5 /SF $ 1 9 2 S_ 0 0 Fescue Sod under 4999 sf 3000 SF $ _ 2 A /SF $ R 7 n n n Buffalo Grass Sod 1000 SF $ 1 . 10 IS $ 1 100.00 Evergreen Tree - #15 container 1 EA $ 1 1 2. 50/EA $ 1 1 2.50 Evergreen Tree - 6' height 1 EA $ 2 2 5.0 0/EA $ 225.0 0 Evergreen Tree - 8' height 1 EA $ 3 4 8.7 5/EA $ 348.7 5 Evergreen Tree -10' height 1 EA $ S 1 7 5 0/EA $gip Deciduous Canopy Tree - 2" caliper 1 EA $ 181 .2 5/EA $ 1 81 .25 Deciduous Canopy Tree - 2 1/2 " caliper 1 EA $ 21 8.7 5/EA $ 21 8.75 Deciduous Canopy Tree - 2 3/4 " caliper 1 EA $ 21 8.7 5/EA $ 21 8.7 5 Deciduous Canopy Tree - 3" caliper 1 EA $ 2 5 6 _ 5/EA $ 2 5 6 2 5 Deciduous Ornamental Tree -1 1/2 " caliper 1 EA $ 1 6 8. 7 5/EA $ 1 6 R 7 5 Deciduous Ornamental Tree -1 3/4 " caliper 1 EA $ 1 R 1 2 5/EA $ 1 R 1 2 S7 S Deciduous Ornamental Tree - 2" caliper 1 EA $ 2 0 6. 2 5/EA $ 2o6 _ 2 5 Deciduous Ornamental Tree - 2 Ya n caliper 1 EA $ 2 n 6. 2 5/EA $ 2 0 6 2 5 Deciduous Ornamental Tree - 2 1/2 " caliper 1 EA $ 2 4 3. 7 5/EA $ 2 4 3. 75 Deciduous Shrub - #1 container 1 EA $ 8.7 5 /EA $ 8. 7 5 Deciduous Shrub - #5 container 1 EA $ 1 5. 0 0 /EA $ 1 5. 0 0 Evergreen Shrub - #1 container 1 EA $ 2 8.0 0 /EA $ 28.00 Evergreen Shrub - #5 container 1 EA $ 21 .66 /EA $ 21.66 Perennial - 4" pot 1 EA $ 5 2.5 0 /EA $ 5 2.5 0 Perennial - #1 container 1 EA $ 6 _ A 6 /EA Ornamental Grass - #1 container 1 EA $ 8.08 /EA $ 8.08 Deciduous Tree Staking Assembly Wood 1 EA $ 1 0.0 0 /EA $ 1 0.0 0 Deciduous Tree Staking Assembly T-post 1 EA $ 6.7 5 /EA $ 6.7 5 Evergreen Tree Staking Assembly Wood 1 EA 1000 /EA $_ n _ n n Evergreen Tree Staking Assembly T-post 1 EA $ 6.7 5 /EA $_Ej 5 Crusher Fines Buff 1000 CY $1 6.1 0 /CY $ 1 6 , 1 0 0.0 0 Crusher Fines Red 1000 CY $15 fig_/CY $ 1 5 , 000. 00 Weed Barrier 1000 SF $ . 0 5 /SF $ 5 0.0 0 Organic Mulch 1000 CY $ 2 0.0 0 /CY $-20 , 0 0 0.0 0 3/a" Rock Mulch 1000 CY $ 21 .0 0 /CY $ 21 , 0 0 0.0 0 Labor Charges Landscape supervisor 50 HOURS $ 3 0 : 0 0 /Hour $1 , 5 0 01kftr Labor for landscape operations 50 HOURS $ 2 5.0 0 /Hour $1 , 2 5 4/fir Labor for watering of plant material 50 HOURS $ 4 0.0 0 /Hour $2 00 Q O:ur Irrigation supervisor 50 HOURS $ 3 0.0 0 /Hour $4, S_Q 0Alour Labor for irrigation operations 50 HOURS $ 2 5 _ o o /Hour $1 2 5 0 . /Hour Labor for irrigation operations after hours 50 HOURS $ 3 5.0 0 /Hour $17 5 0 . /Hour TOTAL COST TOTAL - Costs For All Items Total Cost $ 1 0 7, 0 2 6- 4 8 and forty eight cents • Attach hourly Equipment/Operator rates to be used for Force Account work Riding mower HOUR $ 36,00 Push mower String trimmer Skidsteer Backhoe Dump truck Trencher Aerator Plant material Landscape material Irrigation parts/pipe Signature: Print Name: Steve L Korby HOUR $ 25.00 HOUR $ 20.00 HOUR $ 50.00 HOUR $ 55.00 HOUR $ HOUR $ 50- 00 HOUR $ 40.00 HOUR $ mark mark up up over under $500 $500 8 5 Company:Korbv Landscape LLC Address: 12 o l R Mn l hPrry St- _ rin i t � City, State, Zip Code: (maximum markup* is 10% under $500 and 8% over $500) Title: MpmhPr Date: 1 0/ 1 4/ 1 0 Phone: 970. 568. 7228 FAX: 970-568-7635 TO: John Stephen COMPANY: City of Ft. Collins FAX: 221.6707 DATE: October 29, 2010 FROM: Steve SUBJECT: Your phone call Yes, all of our work includes installation: trees, sprinkler heads and crusher fines. Reference Check Questions: Crew size, 10 Current projects: Transfort, City of Ft. Collins, I" National Banks Available equipment: See attached list. No. of Pages: LANDSCAPE KORBY VEHICLE AND EQUIPMENT LIST 2010 V:EHI "LES/Machinery #4 2005 GMC 4500 #5 2005 GMC #6 2005 GMC 3500 #7 Spyker Fertilizer Spreader #2 #9 Walker 56" Mulch Deck #21 Honda ARC 216 Mower #23 Orange Concrete Mixer #29 Polaris 500 #31 2004 Walker Mower #32 2005 Walker Mower #33 2007 Walker Mower #44 Honda Hand Tiller #45 Scotts Drop Spreader #47 1984 GMC Pickup #51 Green Water Tank #52 White Water Tank #55 Landpride #25-84 Box Scraper #62 5520 JD Auger Bucket #66 Ford 200 Econoline Van #68 North Man 8' Snow Plow #71 Trac/VAc Blower #74 Boss Snow Plow #80 Small 4' Sod Roller #81 2004 Case Mini Sneaker Pipe Puller #82 Roger Sprayer #83 Honda Turfco Hand Sod Cutter #85 Lesco Push Spreader #2 Trail Boss #87 Lesco Push Spreader #3 #88 Spyker Fert. Spreader #90 Big Boss Polaris 5 Wheeler #91 Grey Wheelbarrow #95 Turfeo Aerator #96 Honda HRX 217 #97 Red Max #1 Trimmer TRAILERS #7A 2002 Superior Trailer #8A 1985 Maxey Trailer # 10A #11 A Goldco 12A Haulmark Trailer #14A 2003 Carson Utility Trailer #98 Red Max #2 Trimmer #99 Red Max #3 Trimmer #100 Poulan Chain Saw #101 Yard Machine Tree Shredder #102 Grass Hopper 61" Mow Deck #103 Walker Spray Tank #1 #104 Feldman Pull -behind Aerator #1 #105 Feldman Pull -behind Aerator #2 #106 Walker 72" Mow Deck #107 Walker 60" Mow Deck #111 Stihl Hedge Trimmer #112 Echo Hedge Trimmer #113 Walker 48" Mow Deck #114 Walker 60" Mow Deck #115 36" Walk Behind Toro Mower #116 Power Washer #117 Walker Snow Blower #118 Walker Spray Tank #2 #119 Sweepsteer 60" Broom #120 Toro 21" Walk Behind Mower #121 Toro 21" Walk Behind HC Mower #123 Walker Snow Blade #1 #124 Walker Snow Blade #2 #125 JD Edger E 35 #126 Red Max HB 2260 Blower #127 SW Red Max Trimmer #1 #128 Red Max Trimmer #2 #129 Red Max Trimmer #3 #130 Red Max Trimmer #4 #131 Echo PB-60 HT Blower #1 #132Echo PB-60 HT Blower #2 #133 Echo PT-60 HT B lower #3 #134 JD Blower #135 Red Max EB 7000 Blower #1 #136 Red Max EB 7000 Blower #2 #137 Red Max EB 7000 Blower #3 #138 Tree Cart #140 2000 Gallon Bulk Fuel Tank #141 500 NO Lead Tank #148 Storage Shed 16'X8' #149 Small Sod Roller #150 60" Walker Mow Deck #151 2005 Everide Warrior Mower #152 2004 Walker Mower #153 48" Walker Mow Deck #154 Red Max HBZ2601 Blower #155 Red Max BZ23N — Trimmer #158 Red Max TR 2300S #2 Trimmer #159 Red Max TR 2300S #3 Trimmer #211 Grasshopper Mower #212 John Deere 4720 #213 Meyers ice melt spreader #214 8' Tractor, Snow Plow Black. #215 10' Tractor Snow Plow #216 Honda Snow Blower #217 Honda Snow Blower #218 Honda Snow Blower #24-9=5520 John Deere Tractor #220 7800 John Deer Tractor #221 472.0 John Deer Tractor #222. 5520 John Deer Tractor Vff-r Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970221.6707 kgov.com/purchasing ADDENDUM No. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 7150: Small Landscape and Irrigation Annual OPENING DATE: 3:00 P.M. (Our Clock) October 14, 2010 To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. CHANGE: 1. Submit the attached revised bid schedule with your bid. Changes include adding hourly cost for Landscape supervisor and Irrigation Supervisor, added lines for tree staking with t-post and added line for crusher fines with red color. 2. Contractor may charge a minimum of $100.00 for work that falls under $100.00 in line item pricing or labor. 3. Subcontractor's are allowed but must be approved by City/PSD: 4. Contract may be awarded to multiple contractors. 5. Under IRRIGATION section 1.03 Submittals A. Replace with the following: Deliver all written submittals to the Owner's Representative electronically within 10 working days from the date of Notice to Proceed or at owner's request. 6. Crusher fines to be 3/8" maximum.