HomeMy WebLinkAbout477776 AMEC EARTH & ENVIRONMENTAL INC - CONTRACT - RFP - 7145 CONSULTING ENGINEERING AND PLANNING SERVICES FOR WATER SUPPLY AND DEMAND MANAGEMENT POLICY UPDATEPROFESSIONAL SERVICES AGREEMENT THIS AGREEMENT made and entered into the day and year set forth below, by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as the "City" and AMEC Earth & Environmental, Inc., hereinafter referred to as "Professional". WITNESSETH: In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between the parties hereto as follows: 1. Scope of Services. The Professional agrees to provide services in accordance with the scope of services attached hereto as Exhibit "A", consisting of ten (10) pages, and incorporated herein by this reference. 2. The Work Schedule. The services to be performed pursuant to this Agreement shall be performed in accordance with the Work Schedule attached hereto as Exhibit "B", consisting of one (1) page, and incorporated herein by this reference. 3. Contract Period. This Agreement shall commence September 8, 2010, and shall continue in full force and effect until September 7, 2011, unless sooner terminated as herein provided. In addition, at the option of the City, the Agreement may be extended for additional one year periods not to exceed four (4) additional one year periods. Renewals and pricing changes shall be negotiated by and agreed to by both parties. The Denver Boulder Greeley CPIU published by the Colorado State Planning and Budget Office will be used as a guide. Written notice of renewal shall be provided to the Professional and mailed no later than ninety (90) days prior to contract end. 4. Early Termination by City. Notwithstanding the time periods contained herein, the City may terminate this Agreement at any time without cause by providing written notice of termination to the Professional. Such notice shall be delivered at least fifteen (15) days prior to the Standard Professional Services Agreement- rev03/10 1 City's overall per capita water use and for comparison with other municipal providers. Indoor vs. outdoor water use will be quantified, both on a system -wide basis and by customer class, to address issues related to water conservation, potential climate change effects on demand, and 'demand hardening'. Our work under this Task includes the following. Facilitate a project kick-off meeting with Utilities staff to formulate a protocol for communications, sharing of documents, data, and other information. This will include a discussion of historical and current water use and supply data and how they should be best portrayed as well as discussion on how the Triple Bottom Line analysis will be incorporated into the policy update. Review available documents and data regarding historical water use and supplies, identify data gaps, and where necessary, fill these data gaps using sound technical analyses. Review available documents and data regarding the Utilities water demand projections, identify data gaps, and where necessary fill these data gaps. This will also involve one meeting with the City's planning department to review methods used to develop future population growth projections and to discuss other potential planning conditions that might affect water use. Assumptions: • The City will provide AMEC the necessary documents and data to effectively assess the City's historical and current water supplies and demands. Important numerical data will be available in electronic documents and/or spreadsheets. • Identified data gaps necessary for analytical purposes for this study will be filled using reasonable assumptions and technical approaches developed using expertise of the Consultant Team. It is assumed that this effort will not exceed 20 percent of the level of effort needed to complete this Task. • City Planning staff will be readily available for discussions related to population and employment projections and expected land use changes. • Two meetings will be held with the City to coordinate data collection and review demand and population data. This includes a project kick-off meeting and a meeting with the City's planning department. These meetings will be held on the same day to reduce travel costs. Deliverables: • Agenda and meeting minutes • Compiled water supply and water use data Task 2: Review existing policy provisions for clarity, relevance and potential revision Purpose: The City's current Water Supply and Demand Management Policy was drafted in 2003 and at least some of its provisions are in need of updating. The purpose of this Task is to review the City's current Policy in light of recent developments, circumstances and the City's current thinking, and to develop a preliminary list of potential policy revisions for further evaluation and consideration in later Tasks. Approach: Members of the AMEC Team will independently review the City's existing Water Supply & Demand Management Policy Report (including Appendices), as well as the City's 2009 Water Conservation Plan, and will develop lists of initial observations, questions and suggestions regarding potential policy revisions, considering technical, logistical, political and 2 communication perspectives. (A detailed review of the Water Conservation Plan is included in Task 3). We will meet internally to develop a combined list of initial observations, questions and suggestions for transmittal to Utilities. This combined list will deliberately preserve our individual "first impressions and reactions". We will review our initial impressions with the City and based on feedback from the City develop a draft memorandum containing a set of proposed policy revisions. We anticipate that several revisions of this memorandum will be necessary prior to the public review process. Given the City's proposed enlargement of Halligan Reservoir, any proposed policy revisions will be crafted in anticipation of public presentation and scrutiny. Our work under this Task includes the following. Review of the City's existing Water Supply & Demand Management Policy Report (detailed review of the Conservation Plan is included in Task 3). Conduct a comprehensive review of the City's different per capita water usage rates that are currently used for different purposes, and recommend a single per capita usage rate for policy planning purposes. In developing our recommendations, we will conduct the following: - Evaluate the City's most recent historical water usage data (through at least 2009) to determine if there have been any recent changes in use trends. We will examine historical total water usage, water usage by customer type, per capita water usage and proportions of indoor and outdoor water use. - Review the City's current methodology for normalizing its historical per capita water usage values to represent average precipitation and temperatures and adjusts its per capita water usage rates to account for large contractual customers and other sales or exchange arrangements. - Compare the City's current per capita water usage rate with the Water Conservation Plan's per capita water use goal as adjusted in Task 3. - Compare the City's recent historical total and residential per capita water use rates with those of other Front Range providers to determine how the City's water usage compares with other similar communities. In making this comparison, we will assess the different degree of treated -water -irrigated `green cover' within each city's service area. This factor can significantly affect the 'apples -to -apples' comparative value of water use data for different cities. AMEC will apply remote sensing and GIS techniques to quantify the degree of 'irrigated green cover' and associated water demand within urban settings and has done so for several cities along the Front Range. This is discussed in further detail below. Use remote sensing and GIS techniques to develop an estimate of 'green cover' in the City service area and compare this `green cover' to other municipalities along the Front Range in relation to their per capita water demands. In the City, vegetation that indicates supplemental irrigation will be classified from 2009 summer imagery at 1-meter resolution that is freely available from USDA sources. This 'green cover will include a mixture of trees, grass and other vigorous vegetation. Using the best available data, GIS analysis steps will be applied to remove areas where vegetation overhangs impervious surfaces to avoid overestimating irrigated acreage and provide consistency with similar studies. Other cities where this data exists and we believe will be available for comparison include Thornton, 3 Longmont, Castle Rock, Aurora and possibly Denver, Boulder, Highlands Ranch and Colorado Springs. For comparison purposes, efforts will aim to obtain estimates of 'green cover' acreage among these municipalities that are relatively consistent with the methods and necessary assumptions used to estimate the City's 'green cover'. • Develop a Draft Demand and Supply Memorandum containing updated summaries and illustrations of the City's historical and current water use and supplies, per capita water demands, projected water demands and a summary of the GIS methods used to estimate green cover in the City. Descriptions of derivations, if any, from previous data will be provided in addition to recommendations for a planning level per capita water usage rate. • Develop a list of preliminary policy revisions to discuss with Utilities ■ Meet with Utilities to obtain feedback on the Draft Demand and Supply Memorandum, Draft Conservation Memorandum (described in Task 3) and to further refine a preliminary list of proposed policy revisions • Produce a Draft Preliminary Policy Memorandum containing a set of proposed policy revisions based upon feedback from the City and follow-up analyses, for review by Utilities. This memorandum will include a full set of policy provisions, proposed revisions to selected provisions and discussions of each provision supporting the proposed revision or the keeping of the existing provision. • Meet with Utilities to refine the Draft Preliminary Policy Memorandum. • Produce a Draft Policy Memorandum containing an updated set of proposed policy revisions as well as results of the demand analysis. This memorandum will be incorporated into the stakeholder outreach effort. Assumptions: • The City's 50-year Drought Criteria was the result of much work and discussion by City Council and it reflects the City's preferences and values at the time it was adopted and we do not recommend revising this policy provision at this time. However, Utilities should be prepared to respond to questions from the public regarding the tradeoffs between alternative levels of drought protection and the need for storage, climate change when modeling the ability of the City's water supply system to meet the 50-year drought criteria and the potential need for additional raw water storage. We will discuss these issues with Utilities and make recommendations as appropriate, however, it will be the responsibility of the City to address this issue during the stakeholder outreach effort. • The City will be able to provide a GIS shape file that specifically depicts the Utilities service area boundary (that is currently used for demand projections) for the estimate of 'green cover' using remote sensing and spatial techniques. • Data will be readily available from the listed municipalities above that have estimates of 'green cover' in their service area. These data will be relatively compatible with the City's 'green cover' estimate in order to conduct an 'apples -to -apples' comparison of the City's 'green cover' and per capita water demands in relation to other municipalities. A comparison will be made with up to four other cities. • The methods and assumptions used to develop the `green cover' estimates for other municipalities' will be reviewed on a case -by -case basis. Minor modifications to the municipalities' 'green cover' estimates may be necessary to ensure that the assumptions/methods used to develop these estimates are compatible with the assumptions/methods used to estimate the City's 'green cover' for an apples -to -apples comparison. However, it is assumed that significant GIS analyses and/or other analytical efforts will not be necessary for these modifications. • Task 2 will consist of two meetings with Utilities. 4 Deliverables: • Electronic spreadsheets developed to evaluate the City's historical supplies and demands and projected demands • Electronic Draft Water Supply and Demand Memorandum for review by the Utilities • Electronic Draft Preliminary Policy Memorandum of proposed policy revisions for review by Utilities • Electronic Draft Policy Memorandum for the stakeholder outreach effort. This will incorporate recommendations from the demand and supply and conservation evaluations discussed in Task 3. • GIS-ready green cover data in raster ESRI grid or similar format, comprising vegetation types with greenness as an indicator of supplemental irrigation and/or healthy/vigorous vegetation. Task 3: Review the City's recent Water Conservation Plan for consideration in the policy update Purpose: The City's 2009 Water Conservation Plan contains information regarding the City's recent water use patterns and proposes a water use goal of 140 gpcd (normalized to average existing weather conditions) by the year 2020, based upon a new recommended conservation program containing several program elements. The purpose of this Task is to review the Water Conservation Plan for consideration in the City's Policy update as well as conduct a comprehensive review of the 140 gpcd water use goal. Approach: AMEC will work with the City to incorporate appropriate information from the Water Conservation Plan into recommended changes for the policy update. This will include recommendations for changes to the City's existing Demand Management policy provisions regarding water conservation programs including educational programs, rate structures, incentive programs, regulatory measures and operational measures. The 140 gpcd goal of the Water Conservation Plan appears to be reasonable given the Plan's assumptions, which include: no proportional changes in the amounts of future residential vs. nonresidential growth, no changes in net development density in the service area, and no change in future climate. However, changes in any of these assumptions, particularly increased temperature due to climate change, are likely to result in a significantly higher per capita usage rate in the future. We will examine the validity of these assumptions and, if warranted, propose an adjustment of the 140 gpcd goal to reflect changes to these assumptions, including likely changes in outdoor demand due to climate change. We will work with Utilities and Planning staff to determine if the relationship between population and employment is expected to change in the future, or if the average density of development in the City's service area is expected to increase or decrease due to growth and will adjust the 140 gpcd goal to reflect the influence of changes in either of these factors. We will also develop a range of projected increases in unit irrigation demands that would result from temperature increases as predicted by global circulation models for the City's service area. We will develop a range of further adjustments to the 140 gpcd goal that reflect the range of projected increases in unit irrigation demands due to climate change. 5 Our work under this Task includes the following. • Conduct a critical review of the Water Conservation Plan to develop a full understanding of the Plan's characterization of the City's water uses, its demand projections and per capita use goal, and its recommended plan elements. • Prepare a range of adjustments to the Plan's 140 gpcd usage goal to reflect any expected changes in the proportion of future residential vs. nonresidential growth, changes in net development density, and projected temperature increases due to climate change. • Prepare a Draft Conservation Memorandum describing the results of our analysis and providing our recommendations for modifying the City's demand management policy provisions to reflect the Plan's proposed Water Conservation Plan elements. • Meet with Utilities to review and refine the Draft Conservation Memorandum and incorporate the results of this Task into our work in Task 2. Assumptions: • City Planning staff will be readily available for discussions related to population and employment projections and expected land use changes. • Feedback from Utilities on the Draft Conservation Memorandum will be included in the meeting outlined in Task 2 which will focus on the Supply and Demand Memorandum and Conservation Memorandum Deliverables: Electronic spreadsheets developed to support the evaluation of the City's 140 gpcd conservation goal Electronic Draft Conservation Memorandum Task 4: Stakeholder process to obtain objective input regarding key policy provisions from a broad spectrum of the City including other City departments, advisory boards, special interest groups and the general public. Purpose: The City's Policy, adopted by Council, provides a framework that guides the City's actions regarding major water supply planning and demand management decisions. As such, any proposed revisions to the Policy justify public input and scrutiny. The purpose of this Task is to develop a stakeholder process to obtain input from a spectrum of City Departments, interest groups and the general public regarding proposed policy revisions and their implications. Approach: The Consultant Team will develop a flexible but structured process for involving stakeholders and will work with the City in establishing a Community Study Group (CSG) as the primary vehicle for stakeholder involvement. The CSG will include representatives of all relevant City Departments, interest groups and interested members of the general public, as well as liaison members from the Water Board and/or City Council. Prior to convening the group, the Consultant Team will interview CSG candidates to obtain input to the group's charter and the issues to be addressed in the CSG process. Results from the interviews will be brought forward to the CSG in the form of a draft charter and scope. In addition, these initial interviews will provide insights on how to bring the larger community into the discussion of Policy Update process. Following the interviews, the Consultant Team will meet with the project team to discuss R recommendations for communicating with and engaging the broader community. At a minimum, appropriate materials from the stakeholder process will be posted on the City's website. The initial meeting of the CSG will focus on several start-up items. The role and responsibility of the CSG will be identified and differentiated from that of the Water Board and the City Council. A charter and ground rules will be established. A series of topic areas for subsequent meetings will be mapped out so that all aspects of the City's Policy are addressed. At this first meeting, we recommend a reasonable amount of flexibility regarding sequencing of subject matter. A schedule for three subsequent meetings will then be developed that covers all major policy topics, for example: Stakeholder Meeting 2: Demand Management, Water Supply for Municipal Use and Water Supply Shortage Plan Stakeholder Meeting 3: Surplus Water, Regional Cooperation, Raw Water Quality, Stream Flow/Ecosystem Protection, Recreational/Aesthetic Flows Stakeholder Meeting 4: Synthesis of Discussions Each meeting will be supported by presentations that facilitate discussion of the featured topics. Participants will be actively involved via several processes: asking each member to identify and explain their most important issues, break-out groups, "sticky board" sessions, and providing comment sheets for individuals who may be reluctant to speak publicly. Comments and opinions received at each meeting will be recorded, including minority or dissenting opinions. Written meeting summaries, "snapshots" of sticky boards and tallies of prioritized issues, will be created. A summary of this information will included in the Task 6 Final Report. Our work under this Task includes the following. • Meet with Utilities to plan the stakeholder process, identify potential CSG stakeholder candidates, define a tentative schedule and identify needed support presentations and studies. • Conduct interviews with potential CSG candidates • Develop an overall stakeholder process schedule and logistics. • Develop recommendations for informing and engaging the general public. • Prepare a Draft Stakeholder Process Memorandum summarizing the stakeholder process. The Utilities will have an opportunity to comment on this memorandum prior to distribution to the stakeholders. • Develop a draft presentation for each meeting, handouts, wall displays and meeting agendas for review by the Utilities prior to each meeting. • Attend and facilitate stakeholder meetings. A structured dialog that involves a consideration of tradeoffs, such as capital and operating cost, reliability, ultimate service population and environmental impacts will be necessary. The Consultant Team will support this process in the role of a technical facilitator, guiding the discussion, and also by providing reliable and clearly presented information about tradeoffs. • Provide meeting minutes summarizing key discussion points and feedback for each stakeholder meeting. Assumptions: ■ Up to 20 interviews will be held with CSG candidates. 7 • The meeting with the Utilities to develop the stakeholder process will be consolidated with the Task 2 meeting to discuss the Draft Preliminary Policy Memorandum. • Most of the work needed to provide informational support for the stakeholder meetings will be readily derived from previous work and reports done by and prepared for the City. • Catalyst will take the lead in developing the stakeholder process schedule, logistics and in developing the Draft Stakeholder Process Memorandum. • The Utilities will be responsible for "day-to-day" communication with the CSG and distributing meeting materials in advance of each meeting. • The Utilities will be responsible for identifying stakeholder candidates and contacting them to initiate the CSG and hosting CSG meetings. • The Consultant Team will facilitate four stakeholder meetings of approximately two hours each during the duration of the stakeholder process. The CSG will operate under basic ground rules, but will not require consensus on subject material. • The Consultant Team will develop the following materials for each of the stakeholder meetings: one Powerpoint presentation, agenda and up to four handouts. The Utilities will have an opportunity to comment on these draft materials prior to each meeting. AMEC will take the lead in developing the meeting materials and will work closely with Catalyst to incorporate feedback on content and overall presentation of material. • AMEC will provide the initial draft of the meeting minutes and incorporate feedback from Catalyst and the Utilities. • The Utilities will be responsible for production of the meeting material handouts prior to the stakeholder meetings. • Given the potentially controversial nature of this policy update, it is possible that the public outreach effort will require additional processes beyond the four stakeholder meetings included in this scope. The level of additional effort necessary for public outreach is uncertain at this point of time, however, will become clearer during the initial interviews of the stakeholder process included in this scope. Following the interviews, Catalyst will develop a list of recommendations for informing and engaging the general public beyond the four CSG meetings. At that point in time, additional work conducted by the Consultant Team on the public outreach effort would need to be discussed and scoped as a separate Task outside this current scope of work. ■ The Utilities will be responsible for website postings of materials provided by the Consultant Team. Deliverables: • Electronic Draft Stakeholder Process Memorandum that summarizes the stakeholder process • Electronic list of recommendations for informing and engaging the general public beyond the four CSG meetings • Power point presentation, up to four handouts and meeting agenda for each of the stakeholder meetings ■ Meeting minutes summarizing each of the stakeholder meetings Task 5: Develop and present alternative policy provisions for review and consideration. Purpose: The purpose of this Task is to develop a set of alternative policy revisions for consideration by the Water Board and City Council. These policy provisions are to reflect the thinking of Utilities and the results of Tasks 1 through 4. Approach: As previously discussed, the stakeholder process developed in Task 4 will likely produce an extensive and diverse amount of comments, reactions and recommendations. Utilities and the Consultant Team will need to review and respond to the stakeholder input and incorporate that input, as appropriate in Utilities' judgment, into alternative proposed policy revisions. Our work under this Task includes the following. • Prepare an updated Draft Policy Memorandum incorporating feedback from the stakeholder process. This memorandum will be an update to the Draft Policy Memorandum developed for Task 2. • Meet with the Utilities to review the Draft Policy Memorandum. Revisions to this memorandum will be incorporated into the Final Report (Task 6). Assumptions: This Task will involve one meeting with the Utilities and conference call(s) as needed to discuss feedback from the stakeholder meetings. Deliverables: Electronic Draft Policy Memorandum incorporating feedback from the stakeholder process. This memorandum will be an update to the Draft Policy Memorandum outlined in Task 2. Revisions to this memorandum will be incorporated into the Final Report (Task 6). Task 6: Prepare final report recommending proposed policy revisions for adoption Purpose: The purpose of this Task is to prepare a Policy Recommendations Report that provides the final recommendations and supporting discussion for policy revision. The City will use this report as a resource in support of adopting new policy. Approach: The Policy Recommendations Report will consolidate information from the memorandums developed for Tasks 1 through 5. This report will be developed upon conclusion of the stakeholder outreach effort. Our work under this Task includes the following. • Discuss report subject matter, format and intended audiences with Utilities • Prepare Draft Policy Recommendations Report for review by Utilities. ■ Meet with Utilities to review comments on the Draft Policy Recommendations Report and discuss refinements. • Prepare Final Policy Recommendations Report Assumptions: One meeting will be held with Utilities to review the draft report Deliverables: • Electronic Draft Policy Recommendations Report • Electronic Final Draft Policy Recommendations Report • Five hard copies of Final Draft Policy Recommendations Report N Task 7: Assist staff in presenting results and proposals to the Water Board, City Council and other groups as needed Purpose: The work done in Tasks 1 through 6 will be the result of collaboration between Utilities and the Consultant Team. The purpose of this Task will be to provide presentation support from the Consultant Team to Utilities for additional meetings held with the Water Board, City Council and other groups. Approach: Our work under this Task includes the following. Assist in preparing and presenting at meetings for the Water Board, City Council or other groups on the proposed water supply and demand policy changes. Assumptions: • The Consultant Team will assist Utilities in presentations for up to three meetings. • The Consultant Team's role and level of effort necessary to assist in developing the presentations will be discussed and agreed upon with Utilities in advance of the meetings. Deliverables: Presentations for up to three meetings held with the City's Water Board, City Council or other groups Task 8: Project Management Purpose: This Task includes administration of the project on behalf of the Consultant Team. Approach: The Consultant Team will provide the Utilities monthly invoices and a brief progress report summarizing the work completed for each invoice. These invoices will include work completed by AMEC as well as by Catalyst. Deliverables: ■ Monthly invoices with brief progress reports. ® Coordination with Utilities Project manager as needed 10 EXHIBIT B WORK SCHEDULE We stand ready to provide the City with timely services in a flexible manner sufficient to meet the City's. one-year time line. Key milestones and respective dates are provided in our proposed schedule below. This schedule assumes work commences in early September 2010 after signing of the contract. Changes to the schedule may be necessary to best accommodate the needs of the City prior to signing of the contract. Table 2 Project Schedule Proposed Schedule: City of Fort Collins Water Supply and Demand 2010 2011 9/1 9115 9/29 10/13 10/27 11/10 11/24 12/8 12/22 1/5 1/19 2/2 2/16 3/2 3/16 3/30 4/13 4/27 5/11 5/25 6/8 6/22 716 7/20 8/3 8117 8/31 Task 1 - Collect historic and current water use and supply data to help illustrate current water demand and supply relationships Task 2 - Review existing policy provisions for clarity, relevance and potential revision Task 3 Review the City's recent Water Conservation Plan for consideration in the policy update Task 4: Stakeholder process to obtain objective input regarding key policy provisions from a broad spectrum of the City including other City departments, advisory boards, special interest groups and the general public. Task 5: Develop and present alternative policy provisions for review and consideration. Task 6 Prepare final report recommending proposed policy revisions for adoption Task 7: Assist staff in presenting results and proposals to the Water Board, City Council and other groups as needed Task 8: Project Management 17,Tt termination date contained in said notice unless otherwise agreed in writing by the parties. All notices provided under this Agreement shall be effective when mailed, postage prepaid and sent to the following addresses: Professional: City: With Copy to: AMEC Earth & Environmental, City of Fort Collins City of Fort Collins, Purchasing Inc. Attn: Donnie Dustin PO Box 580 Attn: Lee Rozaklis PO Box 580 Fort Collins, CO 80522 1002 Walnut Street, Suite 200 Fort Collins, CO 80522 Boulder, CO 803021 In the event of any such early termination by the City, the Professional shall be paid for services rendered prior to the date of termination, subject only to the satisfactory performance of the Professional's obligations under this Agreement. Such payment shall be the Professional's sole right and remedy for such termination. 5. Design, Project Indemnity and Insurance Responsibility. The Professional shall be responsible for the professional quality, technical accuracy, timely completion and the coordination of all services rendered by the Professional, including but not limited to designs, plans, reports, specifications, and drawings and shall, without additional compensation, promptly remedy and correct any errors, omissions, or other deficiencies. The Professional shall indemnify, save and hold harmless the City, its officers and employees in accordance with Colorado law, from all damages whatsoever claimed by third parties against the City; and for the City's costs and reasonable attorneys fees, arising out of such third party claims to the extent caused by the Professional's negligent performance of any of the services furnished under this Agreement. The Professional shall maintain commercial general liability insurance in the amount of $500,000 combined single limits and errors and omissions insurance in the amount of $1,000,000.00. 6. Compensation. In consideration of the services to be performed pursuant to this Agreement, the City agrees to pay Professional on a time and reimbursable direct cost basis according to the following schedule: Standard Professional Services Agreement- rev03/10 2 EXHIBIT C FEE SCHEDULE STAFF Rozaklis Harding Hannou Peppier Condon Sisk Bracchi Flynn Mc4mis Lewis Senior Project Project Junior Technical Project GIS Subcontractor POSITION Principal Principal Manager Engineer 1 Engineer 1 Writer Administrator Specialist Clerical II (Catalyst)* Subcontractor HOURLY RATE $189 $189 $130 $121 $83 $72 $63 $70 $63 $150 10% Mark -Up' Expenses Total yTask�1 Coiled-histonb?endicurrenl;wateruseianil suppty":iiata"i. a=lr.�"k.. »„ ,,. "`r'r..�..� ,.. _ _ , �ffi k*:c�`A�r` �•r?k�`_'... � _ '1 � �,':: �_ .�.::...:`. .....,'�� � i,�O"�.P.., . :=. ."�»»...::�:;;a ;���,�;�,. Kick-off meeting & meeting with the Planning Department 10 5 5 13 0 0 0 0 0 5 $75 $150 $6,033 Document and data review 2 0 0 8 0 0 0 0 0 0 $0 $0 $1,346 Coordination and other misc activities 2 0 0 2 0 0 0 0 0 0 $0 $0 $620 Phase Total 14 5 5 23 0 0 0 0 0 5 $75 $150 $7,999 Task 2::'Reyiew4xistirrg:policy,proyislons for'clarity; relovancerandspolerdial revisiont:%,P i.. ,. ::; Y, , .. . _; . ...- ; . ,,:':� .:- .�:IA" .? "l, P .,,,, ,, V.R%1' �.. .. Comprehensive review of City planning documents & GIS data 2 0 6 6 0 0 0 16 0 0 $0 $0 $3,004 Review of per capita water demands 2 0 0 10 0 0 0 0 0 0 $0 $0 $1,588 GIS'green cover assessment 0 0 20 2 0 0 0 65 0 0 $0 $0 $7,392 Preliminary list of policy revisions 4 4 0 6 0 0 0 0 0 0 $0 $0 $2,238 Draft supply and demand memo 2 2 5 14 0 1 0 0 0 0 $0 $0 $3,172 Meeting on draft supply & demand memo & policy revisions 5 5 5 12 0 0 0 0 0 5 $76 $150 $4,967 Draft Preliminary Policy Memo 4 2 0 12 0 1 0 0 0 5 $75 $0 $3,483 Meeting on Preliminary Policy Memo & stakeholder process (Task 4) 5 0 0 6 0 0 0 0 0 5 $75 $150 $2,646 Draft Policy Memo for stakeholder outreach effort 2 0 0 8 0 0 0 0 0 0 $0 $0 $1,346 Phase Total 26 13 36 76 0 2 0 81 0 15 $225 $300 $29,836 kTaskl3'Meviemthe City's recent: Watec.Conservation P..lanl:for consideration in the pollcy;upda/e i?, ,' ,k'i ?t -, ., a, s .§:, , , :, ; 'i �� - . „ 5 „OM AM,,' 4' ,. :,.. „ ' 'i, ..•A. ..:': ',kr Critical review of Water Conservation Plan 2 0 0 4 0 0 0 0 0 0 $0 $0 $862 Prepare range of adjustments to the Plan's 140 gpcd usage goal 4 5 0 14 15 0 0 0 1 0 $0 $0 $4,703 Draft Conservation Memorandum 2 0 0 8 4 2 0 0 0 0 $0 $0 $1,822 Phase Total 8 5 0 26 19 2 0 0 1 0 $0 $0 $7,387 l7rask,4:'Stakehoider?proce3s to:obtain'objective?input regarding key policy,provision8r8 . . ,,,.'; ,-... h "':1,0'� ' � a'1.ki�,'»... „.. it . ,,. , ,n3,1 hMM2940 ..,�'�" i':. . ,„ ,kl .. `i a. .. „»at " , ,, • ,i ., ,,, „ r" Develop overall process schedule and logistics 2 0 0 2 0 0 0 0 0 8 $120 $0 $1,940 Draft Stakeholder Process Memorandum 2 0 0 2 0 2 0 0 0 8 $120 $0 $2,084 Interviews with potential CSG candidates 10 0 0 2 0 0 0 0 0 28 $420 $0 $6,752 Stakeholder meeting 1 (kickoff) 8 0 0 16 0 2 0 0 2 16 $240 $150 $6,508 Stakeholder meeting 2 (demand/suppty) 8 5 0 16 16 2 0 0 2 16 $240 $150 $8,781 Stakeholder meeting 3 (redenv flows, regional cooperation, etc) 8 0 0 16 0 2 0 0 2 12 $180 $150 $5,848 Stakeholder meeting 4 (policy recommendations) 8 0 0 14 0 2 0 0 2 16 $240 $150 $6,266 Presentation materials and review of minutes 4 4 0 12 4 2 0 0 0 12 $180 $0 $5,420 Phase Total 50 9 0 80 20 12 0 0 8 116 $1,740 $600 $43,599 TTask(5:iDevelop�and present sitema0ve'policy;provisionsifor;reviewand(consideration. ?`.,V�"X ,E,.*"a„,ea:�r „F4, g, ,ff-W,,,,€r._ _ ;b;: �c:.a..„. '"�"*,. �.<�. .....:_ _ _ ? . ::"• _ :..s:`"+ m;;now Update to Draft Policy Memorandum 8 4 0 18 0 1 0 0 0 6 $90 $0 $5,508 Meeting_ with Utilities to finalize Draft Policy Memorandum 5 6 0 5 _ 0 0 0 0 0 5 $75 $150 $3,659 Phase Total 13 10 0 23 0 1 0 0 0 11 $165 $150 $9.167 Jask!6: P.,re are;final:re ort"recommendin ro- osedipolicy':revisions for; ado uonffRN; ..'iM r . , .,.:-, :�::.�'� '::N i �*..i•:. '�..... „" IR,��:��..<.. .. ;', , ,a �.,:, age -.^ s .,. •„. r ;s,q;,: :_.. € Draft Policy Recommendations Report 12 3 0 28 4 4 0 0 1 4 $60 $0 $7,566 Revisions to Draft Policy Recommendations Report incorporating Utilities comments 4 0 0 8 0 0 0 0 0 0 $0 $200 $1,924 Meeting with Utilities to discuss revisions to Policy Recommendations Report following Task 7 5 0 0 8 0 0 0 0 0 0 $0 $150 $2,063 Final Policy Recommendations Report 4 0 0 12 0 2 0 0 0 0 $0 $200 $2,552 Phase Total 25 3 0 56 4 6 0 0 1 4 $60 $550 $14,105 bTask 7: Assist -staff In presenting results=•and propossls to ihe0ater Soard,•City,Counci and',other broupsV X 'M :,­ *M, , I;, *; AM 77 t j � ... F .. -7, • ,,., ...- �' .. ? _: Preparation for four meetings 8 0 0 20 0 0 0 0 0 4 $60 $0 $4,592 Attendance at four meetings 20 0 0 20 0 0 0 0 0 10 $150 $270 $8,120 Phase Total 28 0 0 40 0 0 0 0 0 14 $210 $270 $12,712 Task V,Proectma a emenl 1r 9x :! ,.; ., hfM U s ... :rr' ib n l,. N .:< . ,:' ..'- b. • ' : , ' �. ...', ': .. .:, ,.s; , ,. Monthly invoices and project status reports 4 0 0 12 0 0 12 0 0 0 $0 $100 $3,064 Administration of internal billing (Catalyst and AMEC) 2 0 0 4 0 0 3 0 0 4 $60 $100 $1,811 Phase Total 6 0 0 16 0 0 15 0 0 4 $60 $200 $4.875 Total Hours 170 45 41 340 43 23 15 81 10 169 $2,220 937 Total Cost $32,130 $8,505 $5,330 $41,140 $3,569 $1,656 $945 $5,670 $630 $25,350 $2,535 $2,220 $$129,680 This estimate includes a 10% markup for the subcontractor, Catalyst. This mark-up is itemized separately. a / eO EXHIBIT D CONFIDENTIALITY IN CONNECTION WITH SERVICES provided to the City of Fort Collins (the "City") pursuant to this Agreement (the "Agreement"), the Contractor hereby acknowledges that it has been informed that the City has established policies and procedures with regard to the handling of confidential information and other sensitive materials. In consideration of access to certain information, data and material (hereinafter individually and collectively, regardless of nature, referred to as "information") that are the property of and/or relate to the City or its employees, customers or suppliers, which access is related to the performance of services that the Contractor has agreed to perform, the Contractor hereby acknowledges and agrees as follows: That information that has or will come into its possession or knowledge in connection with the performance of services for the City may be confidential and/or proprietary. The Contractor agrees to treat as confidential (a) all information that is owned by the City, or that relates to the business of the City , or that is used by the City in carrying on business, and (b) all information that is proprietary to a third party (including but not limited to customers and suppliers of the City) . The Contractor shall not disclose any such information to any person not having a legitimate need -to - know for purposes authorized by the City. Further, the Contractor shall not use such information to obtain any economic or other benefit for itself, or any third party, except as specifically authorized by the City. The foregoing to the contrary notwithstanding, the Contractor understands that it shall have no obligation under this Agreement with respect to information and material that (a) becomes generally known to the public by publication or some means other than a breach of duty of this Agreement, or (b) is required by law, regulation or court order to be disclosed, provided that the request for such disclosure is proper and the disclosure does not exceed that which is required. In the event of any disclosure under (b) above, the Contractor shall furnish a copy of this Agreement to anyone to whom it is required to make such disclosure and shall promptly advise the City in writing of each such disclosure. In the event that the Contractor ceases to perform services for the City, or the City so requests for any reason, the Contractor shall promptly return to the City any and all information described hereinabove, including all copies, notes and/or summaries (handwritten or mechanically produced) thereof, in its possession or control or as to which it otherwise has access. The Contractor understands and agrees that the City's remedies at law for a breach of the Contractor's obligations under this Confidentiality Agreement may be inadequate and that the City shall, in the event of any such breach, be entitled to seek equitable relief (including without limitation preliminary and permanent injunctive relief and specific performance) in addition to all other remedies provided hereunder or available at law. Hourly billing rates: Reimbursable direct expenses: Principal $189/hour Senior Project Manager $130/hour Project Engineer 1 $121/hour Junior Engineer 1 . $83/hour Technical Writer $72/hour Project Administrator $63/hour GIS Specialist $70/hour Clerical 11 $63/hour Subcontractor (Catalyst) $150/hour $2,220.00 with maximum compensation (for both Professional's time and reimbursable direct costs) not to exceed One Hundred Twenty Nine Thousand Six Hundred Eighty Dollars ($129,680.00). Monthly partial payments based upon the Professional's billings and itemized statements of reimbursable direct costs are permissible. The amounts of all such partial payments shall be based upon the Professional's City -verified progress in completing the services to be performed pursuant hereto and upon the City's approval of the Professional's reimbursable direct costs. The parties acknowledge that Catalyst, Inc. is not a party to this agreement. However, the rates listed for services to be provided by these subcontractors shall be the rate paid by the City to the Professional for these services. If the amount charged by these subcontractors exceed the rates listed in Exhibit "C" the excess amount shall not be paid or owed by the City. The limitation on increases in prices set forth in section 4 herein shall apply to all rates listed in Exhibit "C" including subcontractor rates. Final payment shall be made following acceptance of the work by the City. Upon final payment, all designs, plans, reports, specifications, drawings and other services rendered by the Professional shall become the sole property of the City. 7. City Representative. The City will designate, prior to commencement of work, its project representative who shall make, within the scope of his or her authority, all necessary and proper decisions with reference to the project. All requests for contract interpretations, change orders, and other clarification or instruction shall be directed to the City Representative. Standard Professional Services Agreement- rev03/10 8. Project Drawings. Upon conclusion of the project and before final payment, the Professional shall provide the City with reproducible drawings of the project containing accurate information on the project as constructed. Drawings shall be of archival, prepared on stable Mylar base material using a non -fading process to provide for long storage and high quality reproduction. "CD" disc of the as -built drawings shall also be submitted to the City in an AutoCAD version no older then the established city standard. 9. Monthly Report. Commencing thirty (30) days after the date of execution of this Agreement and every thirty (30) days thereafter, Professional is required to provide the City Representative with a written report of the status of the work with respect to the Scope of Services, Work Schedule, and other material information. Failure to provide any required monthly report may, at the option of the City, suspend the processing of any partial payment request. 10. Independent Contractor. The services to be performed by Professional are those of an independent contractor and not of an employee of the City of Fort Collins. The City shall not be responsible for withholding any portion of Professional's compensation hereunder for the payment of FICA, Workers' Compensation, other taxes or benefits or for any other purpose. 11. Personal Services. It is understood that the City enters into this Agreement based on the special abilities of the Professional and that this Agreement shall be considered as an agreement for personal services. Accordingly, the Professional shall neither assign any responsibilities nor delegate any duties arising under this Agreement without the prior written consent of the City. 12. Acceptance Not Waiver. The City's approval of drawings, designs, plans, specifications, reports, and incidental work or materials furnished hereunder shall not in any way relieve the Professional of responsibility for the quality or technical accuracy of the work. The City's approval or acceptance of, or payment for, any of the services shall not be construed to operate as a waiver of any rights or benefits provided to the City under this Agreement. Standard Professional Services Agreement- rev03/10 4 13. Default. Each and every term and condition hereof shall be deemed to be a material element of this Agreement. In the event either party should fail or refuse to perform according to the terms of this agreement, such party may be declared in default. 14. Remedies. In the event a party has been declared in default, such defaulting party shall be allowed a period often (10) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to (a) terminate the Agreement and seek damages; (b) treat the Agreement as continuing and require specific performance; or (c) avail himself of any other remedy at law or equity. If the non -defaulting party commences legal or equitable actions against the defaulting party, the defaulting party shall be liable to the non -defaulting party for the non -defaulting party's reasonable attorney fees and costs incurred because of the default. 15. Binding Effect. This writing, together with the exhibits hereto, constitutes the entire agreement between the parties and shall be binding upon said parties, their officers, employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal representatives, successors and assigns of said parties. 16. Law/Severability. The laws of the State of Colorado shall govern the construction, interpretation, execution and enforcement of this Agreement. In the event any provision of this Agreement shall be held invalid or unenforceable by any court of competent jurisdiction, such holding shall not invalidate or render unenforceable any other provision of this Agreement. 17. Prohibition Against Employing Illegal Aliens. Pursuant to Section 8-17.5-101, C.R.S., et. seq., Professional represents and agrees that: a. As of the date of this Agreement: 1. Professional does not knowingly employ or contract with an illegal alien who will perform work under this Agreement; and 2. Professional will participate in either the e-Verify program created in Public Law 208, 104th Congress, as amended, and expanded in Public Law 156, 108th Congress, as amended, administered by the United States Department of Homeland Security (the "e-Verify Program") or the Department Program (the Standard Professional Services Agreement- rev03/10 5 "Department Program"), an employment verification program established pursuant to Section 8-17.5-102(5)(c) C.R.S. in order to confirm the employment eligibility of all newly hired employees to perform work under this Agreement. b. Professional shall not knowingly employ or contract with an illegal alien to perform work under this Agreement or knowingly enter into a contract with a subcontractor that knowingly employs or contracts with an illegal alien to perform work under this Agreement. C. Professional is prohibited from using the e-Verify Program or Department Program procedures to undertake pre -employment screening of job applicants while this Agreement is being performed. If Professional obtains actual knowledge that a subcontractor performing work under this Agreement knowingly employs or contracts with an illegal alien, Professional shall: Notify such subcontractor and the City within three days that Professional has actual knowledge that the subcontractor is employing or contracting with an illegal alien; and 2. Terminate the subcontract with the subcontractor if within three days of receiving the notice required pursuant to this section the subcontractor does not cease employing or contracting with the illegal alien; except that Professional shall not terminate the contract with the subcontractor if during such three days the subcontractor provides information to establish that the subcontractor has not knowingly employed or contracted with an illegal alien. e. Professional shall comply with any reasonable request by the Colorado Department of Labor and Employment (the "Department") made in the course of an investigation that the Department undertakes or is undertaking pursuant to the authority established in Subsection 8-17.5-102 (5), C.R.S. If Professional violates any provision of this Agreement pertaining to the duties imposed by Subsection 8-17.5-102, C.R.S. the City may terminate this Agreement. If this Agreement is so terminated, Professional shall be liable for actual and consequential damages to the City arising out of Professional's violation of Subsection 8-17.5-102, C.R.S. g. The City will notify the Office of the Secretary of State if Professional violates this provision of this Agreement and the City terminates the Agreement for such breach. Standard Professional Services Agreement- rev03/10 6 18. Red Flags Rules. Service Provider must implement reasonable policies and procedures to detect, prevent and mitigate the risk of identity theft in compliance with the Identity Theft Red Flags Rules found at 16 Code of Federal Regulations part 681. Further, Service Provider must take appropriate steps to mitigate identity theft if it occurs with one or more of the City's covered accounts. 19. Special Provisions. Special provisions or conditions relating to the services to be performed pursuant to this Agreement are set forth in Exhibit "U', consisting of one (1) page, attached hereto and incorporated herein by this reference. Standard Professional Services Agreement- rev03/10 7 THE CITY OF FORT COLLINS, COLORADO By: a es B. O'Neill II, CPPO, FNIGP Direct r f Purchasing & Risk Management DATE: �� �Z EST: , AU City Clerk APP AS TO FORM: Assis an City Attorney AMEC Earth & Environmental, Inc. By: Title: V 10 Co - uT - N V CORPORATE PRESIDENT OR VICE PRESIDENT Date: / — / %- Z 0 / 0 ATTEST: (Corporate Seal) Corporate Secretary Standard Professional Services Agreement- rev03/10 EXHIBIT A SCOPE OF SERVICES 1.0 Scope of Work We appreciate the opportunity to conduct a thorough assessment of Fort Collins' (City) Water Supply and Demand Management Policy. The AMEC Team along with Catalyst, Inc. (Catalyst), our public process specialist subcontractor, provides a well -integrated group of dedicated professionals with the expertise in municipal water supply and demand management planning. Our Consultant Team will work with Fort Collins Utilities (Utilities) to effectively provide updated water supply and demand management policy recommendations that address the needs of the City and public stakeholder concerns. Our scope of work includes eight Tasks which generally follows the Task sequence laid out in the City's original Request for Proposals. Tasks 1 through 3 include a technical review of the City's water resources and planning documents and an assessment of water supply, demand and conservation data. Recommendations for policy revisions will be developed and these recommendations and results of the technical assessment will be presented during the stakeholder process outlined in Task 4. Feedback from the stakeholder process will be incorporated into a revised set of policy recommendations in Task 5 and a final report containing the policy recommendations and summaries of the technical assessment and stakeholder process will be developed in Task 6. Task 7 focuses on additional support necessary to present the policy recommendations to the City Council, Water Board and possibly other groups. Task 8 covers the project management activities necessary for the Consultant Team to administer the project. These Tasks are discussed in detail below. A Cost Estimate and Project Schedule are provided in Section 2.0 and 3.0, respectively. Task 1: Collect historic and current water use and supply data to help illustrate current water demand and supply relationships Purpose: The City has produced documents that include records of historical water uses and demands, portrayed in various formats. The. purpose of this Task is to review and update that information, correct for any inaccuracies, and portray that information in formats that will be useful in subsequent Tasks and presentations. Approach: As part of a project kick-off meeting, we will meet with Utilities staff to decide what types of water use and supply data should be collected, how those data should be portrayed and for what period of time. Given the timing of this project, water usage data will be updated through at least the year 2009. We will identify sources of updated data and ways to fill necessary data gaps. We will review relevant documents and records pertaining to raw water diversions, deliveries and reservoir operations, treated water production and service area population, metered uses by customer class, and contract water sales. We will portray water use and supply data in several ways in order to illustrate key points and allow for valid comparisons. Annual treated water volume, service area population and per capita use (adjusted for large contract sales) will be used for determining historical trends in the