Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BID - 7169 PAD-MOUNTED COMPARTMENTAL-TYPE THREE-PHASE DISTRIBUTION TRANSFORMERS
�F6,roCollins Purchasing Financial Services Purchasing Division 215 N. Mason St. 2n° Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgo v. com/purchasing Bid Proposal BID 7169 2000 WA Pad -Mounted Compartmental -Type, Three -Phase Distribution Transformers BID DATE: 2:00 P.M. (Our clock) August 27, 2010 REV. SYM: MM REVISION DESCRIPTIONS REVISION DESCRIPTION Previous on file _F APPROVED REVISION FF: Tim Sagen • Add Paragraph 5.2.2.9.3: pentahead locking bolts Susan Coram • Paragraph 3.2.2.13.1: add glossy requirement. 10-18-95 REVISION GG: Susan Coram • Title page: Remove revised date Tim Sagen • Paragraph 4.4 and Table 2A: Change Temperature Tests and Noise Test from every 9-22-95 unit to one unit of design. REVISION HH: Opal Dick • GE removed from Appendix B Tim Sagen 12-13-96 REVISION II: • Add paragraph 3.2.2.10 OVERCURRENT PROTECTION and renumber remaining paragraphs in section 3.2 Opal Dick • Revise Fig. 1 to reflect a W" configuration for the primary bushing arrangement vs. an Tim Sagen in -line arrangement. 6/3/99 • Revise Fig. 17 to remove requirement for CT mounting studs and increase dimensions A from 5" and 5.5" to 6" on 225-2500 kVA sizes REVISION JJ Bill Bray • Reformat and converted to MS Word, delete List of Active Pages Tim Sagen 9 /14 / 2000 REVISION KK Kraig Bader • Added drawing 1 a to describe cable accessory parking stand detail, revise to reflect Tim Sagen current editions of national standards, change impedance on 368-300-009 from 9 / 11 / 2001 1.7% to 1.9%. REVISION LL Kraig Bader • Change fusing from oil -immersed current sensing weak link cartridge to a current 4/2/2004 sensing bay-o-net fuse link in series with an ELSP current limiting backup fuse (clause 3.2.2.10). • Change column header for impedance table in 3.2.2.1 to clarify that impedance numbers are nominal values. (Tolerances are consistent with ANSI C.57.12.00- 2000) • Changed wording from "Mr. Ouch" in 3.2.2.15 to "warning label" Revision MM Kraig Bader • Change clause 3.2.2.10 to specify current sensing bay-o-net fuse link by size and 2/2/2005 part number. Table 2 was added for this purpose. • Renamed table in 3.3.2.1 to from Table 2 to Table 3 • Renamed table in 4.3. from Table 2A to Table 4 368-300 REV. SYM: MM TABLE OF CONTENTS ITEMS COVERED BY THIS SPECIFICATION................................................................................................................................2 REVISIONDESCRIPTIONS.................................................................................................................................................................3 1. SCOPE..................................................................................................................................................................................................5 2. APPLICABLE DOCUMENTS...........................................................................................................................................................5 3. REQUIREMENTS...............................................................................................................................................................................5 3.1 GENERAL REQUIREMENTS FOR DESIGN................................................................................................................................ 5 3.2 SPECIFIC REQUIREMENTS FOR DESIGN OF LOOP -FEED UNITS........................................................................................ 7 3.3 SPECIFIC REQUIREMENTS FOR DESIGN OF RADIAL -FEED UNITS.................................................................................16 4. QUALITY ASSURANCE..................................................................................................................................................................16 4.1 GENERAL.....................................................................................................................................................................................16 4.2 TEST CONDITIONS.....................................................................................................................................................................16 4.3 FUNCTIONAL TESTS..................................................................................................................................................................17 4.4 TEST METHODS -- FUNCTIONAL TESTS................................................................................................................................17 5. PREPARATION FOR DELIVERY.................................................................................................................................................17 6. DEFINITIONS AND ABBREVIATIONS.......................................................................................................................................18 APPENDIXA.........................................................................................................................................................................................19 APPENDIXB......................................................................................................................................................................................... 23 APPENDIXC.........................................................................................................................................................................................24 TRANSFORMER LOSS EVALUATION - AVERAGE LOSSES.................................................................................................25 INDIVIDUAL TRANSFORMER LOSS EVALUATION..............................................................................................................26 4 368-300 REV. SYM: MM SPECIFICATION FOR PAD -MOUNTED COMPARTMENTAL -TYPE, THREE-PHASE DISTRIBUTION TRANSFORMERS WITH SEPARABLE INSULATED LOAD BREAK HIGH -VOLTAGE CONNECTORS 1. SCOPE This Specification establishes the minimum electrical requirements and mechanical features of three phase, 60 HZ, mineral oil immersed, self -cooled, pad -mounted, compartmental -type distribution transformers rated 2500 kVA and smaller, high voltage 13,200 Grd Y/7620 volts, with separable insulated load break high voltage connectors. These transformers are used for step down purposes from an underground primary cable supply. This standard generally conforms to ANSI requirements for pad -mounted compartmental -type, self -cooled, three-phase, distribution transformers for use with separable insulated high -voltage connectors, C57.12.26. 2. APPLICABLE DOCUMENTS The following documents form a part of this Specification to the extent specified herein. The latest issue in effect on the date of invitation for bids shall form a part of this Specification, unless otherwise noted. • ANSI C57.12.00 - Distribution, power, and regulating transformers, and shunt reactors, general requirements for • ANSI C57.12.26 - Pad mounted, compartmental -type, self -cooled three phase, distribution transformers for use with separable insulated high voltage connectors, high voltage 34,500 Grd Y/19,920 volts and below, 2500 kVA and smaller, requirements for • ANSI C57.12.70 - Terminal markings and connections for distribution and power transformers • ANSI C57.12.80 - Terminology for power and distribution transformers • ANSI C57.12.90 - Distribution, power, and regulating transformers, and shunt reactors, test code for • ANSI/IEEE 386 - Separable insulated connectors for power distribution systems above 600V • NEMA STANDARD TR1 - Transformers, regulators and reactors 3. REQUIREMENTS 3.1 GENERAL REQUIREMENTS FOR DESIGN 3.1.1 BASIC DESIGN STANDARDS Transformers purchased under these Specifications shall be new and, unless otherwise specified, meet the requirements of the applicable ANSI Standards and the modifications and additions given in the subsequent paragraphs. In case of conflict, the requirements of the following documents shall apply in the priority shown: a) This Specification. b) ANSI C57.12.26 c) Other applicable ANSI and NEMA Standards. 3.1.2 KILOVOLT -AMPERE TEMPERATURE RATINGS Kilovolt -ampere ratings are continuous and are based on not exceeding either a 65°C average winding temperature or an 80°C hot spot temperature rise. The temperature rise of the insulating oil shall not exceed 650C when measured near the top of the tank. The temperature rise is based on an altitude of 3,300 feet. 3.1.3 GENERAL CONSTRUCTION 3.1.3.1 The pad -mounted compartmental -type transformers shall consist of the transformer tank, high -voltage cable terminating compartment, and the low -voltage cable -terminating compartment. All three of these components shall be assembled as an integral unit, tamperproof and weatherproof for mounting on a pad. There shall be no exposed screws, bolts or other fastening devices, which are externally removable, except the main cover bolts may be exposed. Where the main cover bolts are exposed, the 5 368-306 REV. SYM: MM corner bolts shall be welded or otherwise rendered tamperproof. There shall be no opening through which foreign objects such as sticks, rods, or wires might be inserted to contact live parts. Suitable means for padlocking the compartment door(s) shall be provided. 3.1.3.2 The high and low -voltage compartment shall be located side by side on one side of the transformer tank. When facing the compartment, the low -voltage compartment shall be on the right. 3.1.3.3 Construction of the unit shall be such that it can be lifted, skidded, and slid into place on the mounting pad without disturbing the entrance cables. 3.1.3.4 An undercoating over the regular finish or an equivalent treatment shall be applied to all surfaces that are in contact with the pad to minimize corrosion. 3.1.3.5 Minimum dimensions shall be as shown in Fig. 1 of this Specification. Maximum transformer and minimum pad dimensions are shown in Fig. 6 of this Specification. 3.1.4 LOSSES The total losses of a transformer shall be the sum of the excitation losses and the load losses (12R losses). Load loss tests shall be performed and reported on all units regardless of whether or not a record of such tests is available on duplicate units. Loss evaluations and loss costs will be based on the values shown in the "Special Conditions and Supplemental Instructions to Bidders." Transformers will be evaluated on excitation losses and 12R losses at the specified rates. If tested losses exceed quoted losses but are within the tolerances of paragraph 9.3, ANSI C57.12.00-2000, the additional cost incurred from the differential of losses will be calculated using the following equation and the above specified rates and will be deducted from the original Purchase Order or back charged to the manufacturer. In Table 18 and the following equation "Units" shall mean "Transformers of the same size and design on one order." Excess loss $ _ [No. of units] [(No Load Loss Evaluation $) (Avg. No Load Losses — Quoted No Load Losses) + (Load Loss Evaluation $) (Avg. Load Losses — Quoted Load Losses)]. If this equation results in a negative number no credit will be given the Supplier. If any unit or units exceed the tolerances of paragraph 9.3, ANSI C57.12.00-2000, that unit or units shall not be shipped without express permission from the City. If accepted, the deduction for excess losses will be based on the following equation: Excess loss $ _ (No Load Loss Evaluation $) (No Load Losses — Quoted No Load Losses) But Not Less Than Zero + (Load Loss Evaluation $) (Load Losses — Quoted Losses) But Not Less Than Zero. 3.1.5 SERVICE CONDITIONS Service conditions shall be as defined in paragraph 4.1 of ANSI C57.12.00 except the ambient temperature range shall be 40°C above to 320C below zero. The transformer shall operate safely with starting temperatures as low as 32°C below zero. 368-300 REV. SYM: MM 3.2 SPECIFIC REQUIREMENTS FOR DESIGN OF LOOP -FEED Units 3.2.1 FUNCTIONAL DESCRIPTION The transformer shall be a three phase, pad mounted, loop feed -safe break, "deadfront" type for use on a 13.8 W grounded "Y" distribution system. 3.2.2 DESIGN AND CONSTRUCTION 3.2.2.1 RATINGS Table 1 - Loop -Feed Transformer Ratings Stock No. WA Low Voltage Nominal Impedance BushingT e/Confi . �_H_ighVoltage Low Voltage 368-300- 008 75 208Y/120 1.9% D OO 368-300- 009 75 480Y/277 1.7% O OO 368-300- 015 150 208Y/120 2.1 % O OO 368-300- 016 150 480Y/277 2.1 % O OO 368-300- 030 300 208Y/120 2.5% O OO 368-300- 031 300 480Y/277 2.5% O OO 368-300- 050 500 208Y/120 3.04% OO ni 368-300- 051 500 480Y/277 3.04% O OO 368-300- 075 750 208Y/120 5.75% O OO 368-300- 076 750 480Y/277 5.75% iD . OO 368-300- 100 1000 208Y/120 5.75% O OO 368-300- 101 1000 480Y/277 5.75% O OO 368-300- 151 1500 480Y/277 5.75% O OO 368-300- 201 2000 480Y/277 5.75% O OO 368-300- 251 2500 480Y/277 5.75% O OO OFigure 1 (V-config.) of this specification O Low -voltage line and neutral terminals shall be stud type bushings in accordance with ANSI C57.12.26-1992, Fig. 9(d) and shall include a separate spade with NEMA standard drilling ®Figure 9(a) of ANSI C57.12.26 - 1992 (4-hole pad) OO Figure 9(b) of ANSI C57.12.26 - 1992 (6-hole pad) 3.2.2.2 INSULATION LEVEL 3.2.2.2.1 The basic impulse level (BIL) of the completely assembled transformer, including high -voltage and low -voltage terminals shall be 95 kV and 30 kV respectively. 3.2.2.2.2 Dielectric test levels shall be in accordance with the distribution levels in Paragraph 5.10 of ANSI C75.12.00-2000 3.2.2.2.3 The unit shall withstand test voltages in accordance with ANSI C57.12.00 and impulse tests in accordance with NEMA Standards for Transformers, Publications No. TR1. 3.2.2.3 TRANSFORMER CORE A five -legged core -coil assembly or three separate core -coil assemblies shall be employed. The use of three-legged designs is expressly prohibited. 368-300 REV. SYM: MM 3.2.2.4 HIGH VOLTAGE TAPS A no-load tap changer with external operating handle shall provide two 2'/2 full capacity taps above and below normal. The operating handle shall be mounted in the primary compartment. 3.2.2.5 BUSHING WELLS AND TERMINALS 3.2.2.5.1 The number, location, and arrangement of bushing wells, terminals and parking stands shall be as shown in Fig. 1 and Fig. 5 of this specification. All low -voltage bushings and high -voltage wells shall be externally clamped and shall have leads of sufficient length to allow them to be changed without removing he cover. Welded bushings and wells are expressly prohibited. 3.2.2.5.2 High -voltage bushing wells shall be 200A load -break interface 8.3/14.4 kV bushings in accordance with ANSI/IEEE Std. 386. 3.2.2.5.3 Low voltage bushing arrangement and spacing shall be "staggered", as shown in Fig. 5 of this Specification. 3.2.2.5.4 The low -voltage neutral shall be a fully insulated bushing. A ground pad shall be provided on the outer surface of the tank and a removable copper ground strap shall be provided and connected between the low -voltage neutral bushing and the ground pad. 3.2.2.5.5 The high -voltage neutral shall be connected to the low -voltage neutral internally with provision for opening this connection for testing. 3.2.2.6 ACCESSORY CABINET 3.2.2.6.1 The accessory cabinet shall consist of a high -voltage and low- voltage compartment generally constructed in accordance with applicable ANSI specifications and dimensioned in accordance with Fig. 1 of this Specification. 3.2.2.6.2 Cabinet doors shall.be hinged, removable, and lockable. Stainless hinge pins shall be provided. 3.2.2.7 ACCESSORY EQUIPMENT Accessory equipment shall be provided in accordance with Table 1A and the following details: 3.2.2.7.1 Suitable jack bosses or equivalent jacking facilities shall be provided on the tank. Vertical clearance for a jack shall be 1'/2 inches minimum, 3'/2 inches maximum. 3.2.2.7.2 The transformer base shall be arranged for rolling in two directions: Parallel to and at right angles to the centerline of the high -voltage bushings. 3.2.2.7.3 Four lifting lugs shall be provided. These lugs shall be adequate strength and size and arranged on the tank to provide a suitable lift for the completely assembled unit. 3.2.2.7.4 The base of the assembly shall be provided with suitable means for mounting the unit on the pad. An internal flange shall be provided at the base of the accessory compartment to provide means for mounting the unit on the pad. (Fig. 1). 3.2.2.7.5 Terminal designations are shown in Figure 1. The identification of terminal connections shall be shown on the instruction nameplate. Instruction nameplate shall be corrosion resistant, located in the low -voltage compartment, and shall be readable with cables in place. Where the nameplate is mounted on a removable part, the manufacturer's name and transformer serial number shall be permanently affixed to a non -removable part. Instruction nameplate shall contain the information specified in ANSI C57.12.00-2000, paragraph 5.12. In addition, either on the nameplate or label affixed near it, the manufacturer shall indicate that the dielectric fluid is non -PCB. 0 REV. SYM: MM 3.2.2.7.6 An automatic pressure relief device shall be located within the compartment. This device shall meet the following requirements: • '/4" NPT or larger male Inlet Port. • Exposed parts of weather and corrosion resistant materials. • Non -deteriorating gasket and o-ring material. • Manual pull ring able to withstand 25 pound force minimum. • Body able to withstand 100 pound force minimum. • Bug shield. • Cracking pressure of 10 ± 2 psig. • Resealing pressure of 6 psig minimum. Zero leak rate from resealing pressure to —8 psig. Minimum flow rate of 35 SCFM at 15 psig. 3.2.2.8 OIL PRESERVATION Transformers shall be of sealed -tank construction. Sealed -tank construction is that which seals the interior of the tank from the atmosphere, and in which the gas plus the oil volume remains constant. The transformer will remain effectively sealed for a top -oil temperature range of —32°C to 105°C. 3.2.2.9 TANKS The tank shall be domed or sloped to shed water and shall be of sufficient strength to support a minimum of 500 lbs. Construction of the tank shall be in accordance with ANSI C57.12.26-1992, Section 7, except bolted cover is preferred. 3.2.2.9.1 If main cover is welded, adequate handhole(s) shall be provided. Handholes shall be concealed. Bolted -on covers shall be adequately gasketed and tamperproof. Main cover bolts may be exposed; however, where cover bolts are exposed, the corner bolts shall be welded or otherwise rendered tamperproof. 3.2.2.9.2 Tank grounding provision shall be in accordance with paragraph 7.6.4 of ANSI C52.12.26-1992. 3.2.2.9.3 Locking bolts shall be pentahead style. 3.2.2.10 OVERCURRENT PROTECTION Overcurrent protection shall consist of a single element current sensing bay-o-net fuse link in series with an ELSP current limiting backup fuse. Fuses shall be sized as shown in Table 2: Table 2 — Fusing Requirements Expulswn Fuse Continuous Current Limiting Fuse Stock kVA `Current Rating Continuous CurrentrRatmg - Number, _, � ��Ca acit ,. = Pa'rt_Numb_er* ,.„� PartNumber* 368-300-008 75kVA 10A 30A 368-300-009 4000353C06 354403OM61 M 368-300-015 150kVA 15A 40A 368-300-016 4000353C08 3544040M61 M 368-300-030 300kVA 25A 65A 368-300-031 4000353C10 3544065M61M 368-300-051 500kVA 40A 100A 4000353C12) 3544100M71M) 368-300-075 750kVA 65A 125A 368-300-076 750kVA (4000353C14) (3544125M71 M) 368-300-100 1000kVA 368-300-101 1000kVA 368-300-151 1500kVA 140A 250A : Parallel 125A fuses 368-300-201 2000kVA 4000353C17 3544125M71M 368-300-251 2500kVA 125A Hi -Amp OL Link C05CB 3 250A : Parallel 125A fuses 3544125M71 M * Fuse shall be as specified in the table above or shall be an equivalent as approved in writing by Electric Standards Engineering. 368-300 REV. SYM: MM 3.2.2.11 COMPONENTS FOR LOOPED PRIMARY The minimum current -carrying capability of components for the looped primary cable system shall be 200 amperes (continuous) and 10,000 amperes symmetrical (momentary). 3.2.2.12 AUDIBLE SOUND LEVEL The audible sound level shall be in accordance with NEMA Standard TR1. 3.2.2.13 BASE PLAN The base plan of a completely assembled unit shall be such that it can be installed on a pad of the dimensions shown in Fig. 6 of this specification. 3.2.2.14 PAINT 3.2.2.14.1 Surfaces to be painted shall be blast cleaned (commercial blast) to provide a clean dry surface free of dirt, dust, chalk, loose paint, rust, grease and any other contaminants. 3.2.2.14.2 EEI "Finishing Guidelines" specification shall apply. Finish coat -shall be Desert Tan, Munsell #10YR6.0/3.0, glossy. 3.2.2.15 SAFETY LABELS The manufacturer shall not apply NEMA 260 Safety Labels. The Purchaser will apply custom warning labels after delivery. 3.2.2.16 ANGULAR DISPLACEMENT: Per Fig. 10(b) of ANSI C57.12.26-1992. 10 368-300 REV. SYM: MM 60 6.0 27.0 FLANGE 3/4" MIN 1 1 /2" MA X 6 5 6.5 I BELNW rj 4.5 — 4.0 . xx xx xx 4 MIN MIN 4. + + 1A 6.5 6.5 HIB GL H2 + + + X1 X3 4 ` 7 2B Ii3A �B3B + T — T— XO X2 I i i I i i i B I I I I I I 4.5 4.5 6.5 6.5 4.5 6.5 38.0 MIN' A—i KVA RATINGS LOW VOLTAGE RATINGS COMPARTMENT DIMENSIONS (MINIMUM) BUSHING HEIGHT A` B 75-150 .ALL 23.25 27 225-500 ALL 28 31 750-1000 480Y/277,208Y/120 28 46 1500-2500 4BOY/227 28 46 NOTE: ' Denotes inside dimensions. " See Fig.5 All dimensions in (inches). Maximum dimensions shall allow one inch clearance from edge of pad (Fig. 6). MIN MIN' Figure 1 - Accessory compartment & Bushing Dimensions (Config. 1) 11 368-300 REV. SYM: MM 2 A 5 1.1IN--j 1 f TANK SURFACE J TANK SURFACE i I I I f � I I I I 0,75 Il 1 J'8 V-0 INSIDE Cable Accessory Parking Stand Figure 1A — Cable Accessory Parking Stand Detail Figure 2 (Config. 2) - DELETED 7/92 Figures 3 & 4 - DELETED 11 /00 Ref. now to: ANSI C57.12.26 - 1992 figures 9(a) & 9(b) 12 368-300 CITY OF FORT COLLINS INVITATION TO BID BID #7169 2000 kVA PAD -MOUNTED COMPARTMENTAL -TYPE, THREE-PHASE DISTRIBUTION TRANSFORMERS Sealed bids will be received and publicly opened at the office of the Director Of Purchasing and Risk Management, PO Box 580, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80524, at the time and date noted on the bid proposal and/or contract documents. If delivered, they are to be delivered to 215 North Mason Street, 2nd Floor, Fort Collins, Colorado 80524. If mailed, the address is P.O. Box 580, Fort Collins, 80522-0580. Bids must be received at the Purchasing Office prior to 2:00 P.M. (Our clock ) August 27, 2010 Special Instructions All bids must be properly signed by an authorized representative of the company with the legal capacity to bind the company to the agreement. Bids may be withdrawn up to the date and hour set for closing. Once bids have been accepted by the City and closing has occurred, failure to enter into contract or honor the purchase order will be cause for removal of supplier's name from the City of Fort Collins' bidders list for a period of twelve months from the date of the opening. The City may also pursue any remedies available at law or in equity. Bid prices must be held firm for a period of forty-five (45) days after bid openings. Submission of a bid is deemed as acceptance of all terms, conditions and specifications contained in the City's specifications initially provided to the bidder. Any proposed modification must be accepted in writing by the City prior to award of the bid. Only bids properly received by the Purchasing Office will be accepted. All bids should be clearly identified by the bid number and bid name contained in the bid proposal. No proposal will be accepted from, or any purchase order awarded, to any person, firm or corporation in default on any obligation to the City. Bids must be furnished exclusive of any federal excise tax, wherever applicable. Bidders must be properly licensed and secure necessary permits wherever applicable. Bidders not responding to this bid will be removed from our automated vendor listing for the subject commodities. The City may elect where applicable, to award bids on an individual item/group basis or on a total bid basis, whichever is most beneficial to the City. The City reserves the right to accept or reject any and all bids, and to waive any irregularities or informalities. Sales prohibited/conflict of interest: no officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision - making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity, favor, REV. SYM: MM 4.0" A A A 4.0" MIN MIN X1—/ XCL T/_ — 1 XO 1 X2 / 6" RADIUS TYPICAL 3 PLACES KVA RATINGS LOW VOLTAGE RATINGS RATINGS B 75-150 ALL 475 8 225-500 ALL 6 8 750-2500 480/277, 208Y/120 6 10 Figure 5 - Staggered Low - Voltage Bushing Arrangement (all dimensions minimum inches). NOTE: An area having a 6 inch radius around each bushing shall remain clear of obstructions such as gauges, etc. 13 368-300 REV. SYM: MM KVA SERIAL :,-,PAD DIMENSIONS'{inches) A E' C D E T. 75 -006 thru —009 75 55 40 21 15 61 150 -015 75 55 40 21 15 61 150 -016 75 55 40 21 15 61 300 -030 75 55 40 21 15 61 300 -031 75 55 40 21 15 61 500 -050 75 55 40 21 15 61 500 -051 75 55 40 21 15 61 750 -076, -075 85 72 49 23 15 67 1000 -101,-100 85 72 49 23 15 67 1500 -151 101 87 51 23 15 76 2000 -201 107 88 51 23 15 79 2500 -251 107 88 51 23 15 79 Fig. 6 — Pad Dimensions 14 368-300 REV. SYM: MM TABLE 1A , ACCESSORY EQUIPMENT ACCESSORY KVA 75-150 300 ` 500-2500 Tap changer handle in HV compartment X X X Instruction nameplate in LV compartment X X X Jacking provisions X X X Provisions for rolling in two directions X X X Lifting lugs X X X Provisions for mounting on pad X X X Arrester mounting provisions Grounding provisions in both compartments X X X 1" oil drain plug X 1" oil drain valve with sampling device X X Upper filter press and filling plug (or cap) (1 ") X X X Provisions for oil gauge X Provisions for pressure -vacuum gauge X X Oil gauge X Thermometer X X X Secondary CT mounting holes (4 holes on 4 3/8" x 5 5/8" centers) X X X Manual/automatic pressure relief valve X X X 15 368-300 REV. SYM: MM 3.3 SPECIFIC REQUIREMENTS FOR DESIGN OF RADIAL -FEED Units 3.3.1 FUNCTIONAL DESCRIPTION The transformer shall be a three phase, pad mounted, radial feed safe break, "deadfront" type for use on a 13.8 kV grounded "Y" distribution system. 3.3.2 DESIGN AND CONSTRUCTION The requirements for radial -feed transformers shall be the same as those of loop -feed with the following exceptions: 3.3.2.1 RATINGS Table 3 - Radial -Feed Transformer Ratings Stock No. WAVoltage Low Impedance Bushin T e/Confi . �_Hiqh Volta a Low Voltage 368-300- 006 75 208Y/120 1.9% OO ®© 368-300- 007 75 480Y/277 1.9%_+_ OO ®6 O Per Figures 5A, & 7 of ANSI C57.12.26-1992 (In -Line) EXCEPTION: high voltage bushings shall be 32 - 36 inches above the base of the transformer ® Figures 9(a) & 9(d) of ANSI C57.12.26 - 1992 (stud with 4-hole pad) © Figure 8(a) of ANSI C57.12.26-1992 (Staggered) 3.3.2.2 ACCESSORY CABINET The accessory cabinet shall be dimensioned in accordance with Fig. 7 of ANSI C57.12.26-1992. 4. QUALITY ASSURANCE 4.1 GENERAL 4.1.1 RESPONSIBILITY FOR INSPECTION Unless otherwise specified, the vendor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the vendor may utilize his own facilities or any commercial laboratory acceptable to the City of Fort Collins. The City reserves the right to perform or witness any of the inspections set forth in this Specification where such inspections are deemed necessary. 4.1.2 TEST REPORT The manufacturer shall furnish to the purchaser certified copies of the results of all tests prior to payment. Copies shall be sent to the Design Section as well as with the invoice. Unsigned copies are not acceptable even if accompanied by a signed cover letter. The Quality Control Manager shall review and sign each test report. 4.2 TEST CONDITIONS Unless otherwise specified, testing defined in Section 4.6 shall be conducted under the following conditions: 4.2.1 REFERENCE TEMPERATURE The reference temperature to which losses, impedance, regulation, and efficiency are corrected shall be 850 C. 4.2.2 TOLERANCE ON IMPEDANCE VOLTAGE Tolerance shall be as specified in ANSI C57.12.00. 16 368-300 REV. SYM: mm 4.2.3 TOLERANCE ON IMPEDANCE VOLTAGE ON A TAP The percent departure of tested impedance voltage on any tap from tested impedance voltage at rated voltage shall not be greater than the total tap voltage range expressed as a percentage of the rated voltage. 4.3 FUNCTIONAL TESTS Functional tests shall consist of those tests and related requirements as cross referenced in Table 4 and shall be performed on each unit, except Temperature and Noise Tests which shall be performed on one unit of each design (KVA) per order. Table 4 - Functional Tests TEST TEST PARAGRAPH REQUIREMENT OR REFERENCE Examination Of Product 4.6 3.0, 3.1, 3.2, 3.3 This specific tion Ratio 4.6 ANSI C57.12.00 Section 8 Polarity And Phase Relation 4.6 ANSI C57.12.00 Section 8 Excitation Loss 4.6 ANSI C57.12.00 Section 8 Excitation Current 4.6 ANSI C57.12.00 Section 8 Impedance & Load Loss 4.6 ANSI C57.12.00 Section 8 Temperature Tests" 4.6 ANSI C57.12.00 Section 8 Dielectric Tests 4.6.1 3.2.2.2 This specification Impulse Tests 4.6.2 3.2.2.2 This specification) Leak Testing 4.6.3 3.2.2.8 & 3.2.2.9 This specification) Noise Testing* 4.6.4 3.2.2.12 This specification) *One unit per design per order. 4.4 TEST METHODS -- FUNCTIONAL TESTS Each completed unit shall be inspected to determine compliance with respect to dimensions, material, workmanship, construction and marking, and routine tests on all units shall be made as specified in Section 8 of ANSI Standard C57.12.00, and in ANSI Standard C57.12.90. In addition to routine tests, the following test requirements and/or modifications shall apply. 4.4.1 DIELECTRIC TESTS Induced and applied potential Dielectric Tests shall be performed in accordance with ANSI C57.12.00 and C57.12.90. The low voltage windings shall have a test potential to ground of 10,000 volts for one minute. The test potential between high voltage windings shall be 34,000 volts for one minute. 4.4.2 IMPULSE TESTS ANSI Standard Impulse Tests shall be performed. Full Wave Impulse Test shall use a 1.5 x 50 microsecond wave. 4.4.3 LEAK TESTING The transformer tank shall be filled with oil and tested for air and oil leaks under (1) 4 psig vacuum for'/2 hour, (2) 7 psig pressure for 24 hours in the sequence indicated. An alternate method of leak testing may be performed by injecting halogen gas under 10 psig and detecting leaks through the use of a halogen detector. (Note, the automatic/manual pressure relief device must be removed for this test). 4.4.4 NOISE TESTING Noise testing shall be conducted in accordance with applicable NEMA Standards. 5. PREPARATION FOR DELIVERY Transformers shall be prefilled with the appropriate amount of transformer oil and shall be shipped by open -bed truck. Units shall be packaged in such a way as to provide for ease of handling and to protect units from shipping damage. Units shall be fully palletized in four-way universal pallets with 28" minimum openings to facilitate handling from any side. Pallets shall be independent of the transformer. The Supplier shall give 24-hour notice prior to delivery for any shipments where an individual transformer weighs over 4,000 pounds. In addition to these requirements, the Supplier shall comply with any additional requirements or modifications shown on the purchase order and/or supplemental instructions. 17 368-300 REV. SYM: MM 6. DEFINITIONS AND ABBREVIATIONS • Vendor or Supplier - The manufacturer and/or manufacturer's agent supplying or quoting on the specified article. • Article, Unit, Assembly - All refers to the equipment defined by this specification. • DC or d.c. - Direct Current. • AC or a.c. - Alternating Current. • °C - Degree Celsius (Centigrade) • °F - Degree Fahrenheit • kV -1000 volts. • CPS or Hz - Cycles per second. • psig - Pounds per square inch gauge. • V or v - Volts. • WA - 1000 Volt-amperes. 18 368-300 REV. SYM: MM APPENDIX A Typical pad designs are shown in Figures 1A through 3A. The dimensions in inches of Figures 1A through 3A will fit the minimum compartments on transformers covered by this Specification as well as the maximum transformer envelope. 19 368-300 REV. SYM: MM 85' ( i5' PRIMARY SEC. I 1 o" FRONT I . T3" T3„ I —1— 25" 27' 13" 19" FOUR #3 RE 3AR LENuTH AND WIDTH �3" 7 5/8' L T T I Notes on Pad Material — 1. Concrete must be 3,000 psi minimum. 2. Maximum coarse aggregate size 1 1/2 inches. Space requirements for pod and primary switching cabinet will generally be 9' X 12'. Factors to be considered in locating the pad include — 1. Accessibility — The transformer pad shall be accessible to line boom trucks equipped for the installation and removal of heavy transformers. Such accessibility shall not require intrusion on adjacent property. 2. Proximity of Buildings, Walls, Barriers, and/or Overhangs — In addition to the clearances required for installation and removal, the minimum clearance in front of the transformer pad shall be eight (8) feet and the minimum clearance from all other sides shall be three (3) feet. If the building has an overhang, clearance to the edge of the transformer pad shall be measures horizontally from the outer edge of the overhang. Transformers through 300 KVA may be installed under the overhang if the vertical clearance between the pad and the overhang is at least 25 feet and the location is accessible to line boom trucks. 3. Codes and Standards — In addition to the above, the installation shall conform to the National Electric Code and federal, state and city codes and standards. 2 1 8/25/9311 REV NO. DATE DWN I D.E. APP I DSNG. ENG APP DIST. APP CITY OF FORT COLLINS DWG 3PHASEi LIGHT AND POWER DEPARTMENT TRANSFORMER PAD DESIGN C OF a CO Ns 75 — 500 KVA LIOMT end POWER 3 PHASE Figure 1A - Pad Design (75 - 500 KVA) 20 368-300 REV. SYM: MM 85" 1I5' PRIMARY SECONDARY 1 8" FRONT 72' I L L 18" 26" 23" 18" FOUR 43 REBAR 49' - 3° LENGTH AND WIDTH 7 5 /8"1: — -E 3' T T Notes on Pad Material — 1. Concrete must be 3,000 psi minimum. 2. Maximum coarse aggregate size 1 1/2 inches. Space requirements for pad and primary switching cabinet will generally be 9' X 12'. Factors to be considered in locating the pod include — 1. Accessibility — The transformer pad snail be accessible to line boom trucks equipped for the installation and removal of heavy transformers. Such accessibility shall not require intrusion on adjacent property. 2. Proximity of Buildings, Walls, Barriers, and/or Overhangs — In addition to the clearances required for installation and removal, the minimum clearance in front of the transformer pad shall be eight (8) feet and the minimum clearance from all other sides shall be four (4) feet. If the building has an overhang, clearance to the edge of the transformer pad shall be measured horizontally from the outer edge of the overhang. Transformers through 300 KVA may be installed under the overhang if the vertical clearance between the pod and the _ overhang is at least 25 feet and the location is accessible to line boom 'trucks. 3. Codes and Standards — In addition to the above, the installation shall conform to the National Electric Code and federal, state and city codes and standards. 1 02 90 REV N0. DATE DWN I D.E. APP I DSNG. ENG APP DIST, APP CITY OF FORT COLLINS DWG 3PHASE2 LIGHT AND POWER DEPARTMENT TRANSFORMER PAD DESIGN =ATM of�� 500 - 1000 KVA LIGHT and POW13R 3 PHASE Figure 2A - Pad Design (500 - 1000 KVA) 21 368-300 REV. SYM: MM 107' 88, _ PRIMARY 15' WINDOW SECONDARY � FRONT f 28" - - 23"__ - 28" 28" FIVE '$5 REBAR 3 51' LENGTH AND WIDTH F— 3" 7 55//8' _ i T Notes on Pad Material — 1. Concrete must be 3,000 psi minimum. 2. Maximum coarse aggregate size 1 1/2 inches. Space requirements for pad and primary switching cabinet will generally be 9' X 12'. Factors to be considered in locating the pod include — 1. Accessibility — The transformer pad shall be accessible to line boom trucks equipped for the instollotion and removal of heavy transformers. Such accessibility shall not require intrusion on adjacent property. 2. Proximity of Buildings, Walls, Barriers, and/or Overhangs — In addition to the clearances required for installation and removal, the minimum clearance in front of the transformer pad shall be eight (8) feet and the minimum clearance from all other side shall be four (4) feet. If the building has an overhang, clearance to the edge of the transformer pad shall be measured horizontally from the outer edge of the overhang. Transformers through 300 KVA may be installed under the overhang if the vertical clearance between the pad and the overhang is at least 25 feet and the location is accessible to line boom trucks. 3. Codes and Standards — In addition to the above, the installation shall conform to the Notional Electric Code and federal, state and city codes and standards. 11 /02/90 REV NO. DATE DWN D.E. APP DSNG. ENG APP DIST. APP CITY OF FORT COLLINS DWG 3PHASE3 LIGHT AND POWER DEPARTMENT TRANSFORMER PAD DESIGN clr m tea* — m! 1000 — 2500 KVA LIGHT a,a POWNP 3 PHASE Figure 3A - Pad Design (1000-2500 KVA) 22 368-300 entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited. Freight terms: unless otherwise noted, all freight is F.O.B. Destination, Freight Prepaid. All freight charges must be included in prices submitted on proposal. Discounts: any discounts allowed for prompt payment, etc., must be reflected in bid figures and not entered as separate pricing on the proposal form. Purchasing restrictions: your authorized signature of this bid assures your firm's compliance with the City's purchasing restrictions. A copy of the resolutions are available for review in the Purchasing Office or the City Clerk's Office. Request Resolution 91-121 for cement restrictions. Collusive or sham bids: any bid deemed to be collusive or a sham bid will be rejected and reported to authorities as such. Your authorized signature of this bid assures that such bid is genuine and is not a collusive or sham bid. Bid results: for information regarding results for individual bids send a self-addressed, self -stamped envelope and a bid tally will be mailed to you. Bid results will be posted in our office 7 days after the bid opening. James B. O'Neill II, CPPO, FNIGP Director of Purchasing and Risk Management REV. SYM: MM APPENDIX B Transformers purchased under this Specification shall be of the make shown below. Manufacturers not listed below may submit written proposals demonstrating compliance with these Specifications for consideration of addition to the accepted manufacturer list prior to the next request for bids. In addition to inclusion on the list below, manufacturer's equipment must also satisfy all requirements of this Specification to be acceptable. TABLE 313 MANUFACTURER SERIAL NO. Cooper Power Systems A11 ASEA Brown-Bovari (ABB) A11 Howard Industries All Pauwels Transformers All The manufacturers in the following list have been conditionally approved and may bid as an alternate. The definition and intent of "Conditional Approval" of a manufacturer is to allow the City to gain some experience with the manufacturer's product. Should a conditionally approved manufacturer be the evaluated low bidder, the City reserves the right to award all, part, or none of the order to them, dependant upon the current needs of the City for that item or items. 23 368-300 REV. SYM: MM APPENDIX C The following forms for Individual and Average Transformer Losses are used by the City of Fort Collins to determine loss penalties. 1) Transformer Loss Evaluation Average Losses Form 2) Individual Transformer Loss Evaluation Form 24 368-300 REV. SYM: MM TRANSFORMER LOSS EVALUATION - AVERAGE LOSSES City Order No. S/N Manufacturer Invoice No. KVA/Unit LINE DESCRIPTION AMOUNT (1) No. of units (2) Average core losses (3) Quoted core losses (4) Excess average core losses: line (2) less line (3) (5) Penalty for excess average core losses: line (1) x line (4) x $ (6) Average copper losses (7) Quoted copper losses (8) Excess average copper losses: line (6) less line (7) (9) Penalty for excess average copper losses: line (1) x line (8) x $ (10) Penalty to be assessed manufacturer: line (5) plus line (9) but not less than zero Date Prepared By: Design Engineering NOTE: If any unit(s) exceeds the loss tolerances of ANSI C57.12.00, Light & Power will either reject it, include it on these averages, or calculate losses using the Individual Transformer Losses Evaluation Form, whichever is most favorable to Light and Power. 25 368-300 REV. SYM: MM City Order No. Manufacturer KVA/Unit LINE (1) (2) (3) (4) (5) (6) (7) (8) INDIVIDUAL TRANSFORMER LOSS EVALUATION S/N - Invoice No. DESCRIPTION Tested core losses Quoted core losses Excess core losses line (1) less line (2) but not less than zero Percent difference Line (3) _ line (2) x 100 Tested total losses Quoted total losses Excess total losses Line (5) less line (6) but not less than zero. Percent difference Line (7) - line (6) x 100 Tested copper losses Quoted copper losses Excess copper losses Line (9) less line (10) but not less than zero. Penalty for excess core losses Line (3) x $ Penalty for excess copper losses Line (11) x $ Penalty to be assessed manufacturer Line (12) plus line (13) Prepared By: Design Engineering AMOUNT 26 368-300 FIRM NAME CITY OF FORT COLLINS BID PROPOSAL BID NO. 7169 2000 kVA Pad -Mounted Compartmental -Type, Three -Phase Distribution Transformers BID DATE: 2:00 p.m. (Our clock) August 27, 2010 WE HEREBY ENTER OUR BID FOR THE CITY OF FORT COLLINS' REQUIREMENTS FOR 2000 kVA PAD -MOUNTED COMPARTMENTAL -TYPE, THREE-PHASE DISTRIBUTION TRANSFORMERS, PER THE BID INVITATION AND ANY REFERENCED SPECIFICATIONS. QUANTITY: DESCRIPTION: 1 Ea. 2000 kVA Pad -Mounted Compartmental -Type, Three -Phase Distribution Transformers with Separable Insulated Load Break High - Voltage Connectors. HIGH VOLTAGE RATING: 13200 GRDY/7620 VOLTS. LOW VOLTAGE RATING: 480Y/277. SERIAL NUMBER 201 TO BE IN ACCORDANCE WITH SPECIFICATION #368-120, REVISION MM PLEASE COMPLETE THE ATTACHED EXCEL SPREAD SHEET FOR BID SUBMITTAL. IF YOU ELECT TO PASSWORD PROTECT YOUR BID, PLEASE NOTE THAT PASSWORD BELOW. *Any surcharges or additional costs shall be noted & included in bid submittal. The transformers being bid meet or exceed the specifications. Yes No. If not, please list exceptions, (specifying paragraph reference number) on a separate sheet of paper and attach to your bid. Escalation is , is not applicable for the transformers bid. If escalation applies, the bidder shall indicate in his bid the specific items or materials subject to escalation, and shall give the method and indices to be used in computing the amount thereof. Escalation occurring after the quoted delivery date will not be paid unless delays are the result of actions by the city. Escalation occurring after acceptance if purchaser exercises the option to delay shipment after manufacturing is completed, will not be paid. Delivery may be a consideration of bid award.. For purposes of warranty and service ONLY approved manufacturers or distributors authorized by an approved manufacturer to serve the Fort Collins area may bid. The City of Fort Collins reserves the right to split the bid in whatever percentages are most advantageous to the City. Future orders of Pad -Mounted Compartmental -Type, Three -Phase Distribution Transformers may be authorized, at the option of the City, from this bid for a period of five years. after date of award. Satisfactory pricing and delivery is required for future orders based on this bid. SUPPLEMENTAL INSTRUCTIONS Prices quoted must remain firm for a 30 day period after the opening date. Freight terms: F.O.B. destination freight prepaid. All freight charges must be included in pricing submitted on proposal and not entered as separate pricing. Any discount allowed by Vendor for prompt payment, etc. must be reflected in quoted figure, and not entered as separate pricing. The City reserves the right to accept or reject any and all quotes. Bidder not responding to the services requested in this bid shall be removed from our automated listing for: Not Applicable Any questions or inquiries regarding this bid should be directed to: SIGNATURE AND TITLE: COMPANY NAME: Opal F. Dick, CPPO, Senior Buyer (970) 221-6778 TYPED OR PRINTED NAME AND TITLE (AREA CODE) TELEPHONE NUMBER/FAX NUMBER ADDRESS: STREET, CITY, STATE, ZIP EMAIL: DATE Ruchase Order Terns and Conditions 1. COSINMRCIAL DETAILS. Tax exemptions. By statute the City of Fort Collins is exempt from state and local [axes. Our Exemption Number is 98-04502. Federal Excise Tax Exemption Certificate of Registry 84-6000587 is registered with the Collector of Internal Reveane, Denver. Colorado (Ref. Colorado Revised Stances 1975. Chapter 39-26. 114 (a). Good: Rey—od. GOODS PLOECTED drrc to Silo. so ores spaci5caaa:a:, —h b— shipped or tine m d f- . of damage in transit. may be married to you for credit and are nor to be replaced except upon receipt of writs instructions from the City of Fan Collins. Inspection. GOODS are subject to the City of Fan Collins inspection un arrival. 11. XONW Aix -ER. Failure of the Purchaser to insist upon strict performance of the terms and conditions hereof, laihtre or delay to exercise nary rights or remedies provided herein or by law, foilme to promptly notify the Sailor in the erent of a breach, the acceptance of or payment for gaols hereunder or approval of the deviga, shall tact release the Seller of any of the taarra❑tias m nhiiwrim of thic 1—haca mdar and clam) not he dwa❑ad a canw of airy iehr of tha purchaser to insist upon strict performance hereof or any of its rights or remedies as many such goods, regardless o£ when shipped received or accepted, as to any prior or sub• equent default hereunder, nor shall any purported oral modification or rescissim of this purchase order by the Parcbaser operate as a waiver of my of the terms hereof. Final Acceptance. Receipt of the merchandise, services or equipment in response to this order can result b 12. ASSIGN\IENT OF ANTITRUST CLARIS. authorized payment an the pan of the City of Fort Collins. However, it is to be understood that FINAL Seller and the Purchaser recognize that in actual economic practice, Overcharges resulting from antitrust ACCEPTANCE is dependent upon commpletion of all applicable required impectim procedures_ violations are in fact borne by the Purchaser. Theretofore, for good cause and as consideration for executing this purchase cider, the Seller hereby assigns to the Pmtcbaser any and all claims i may now haveor bereafter Freight Terms. Shipments must be F.O.B., City of Fan Collins, 700 Wood St., Fen Collins, CO 80522, unless acquired under federal or state antitrust laws for such Ovarcheiges relating to the particals" goods or services otherwise specified an this order. If permission is given to prepay freight and charge cepmmly, the original freight purchased Or acquired by the Purchaser pursuant to this purchase ordaL bill most accompany invoke. Additional charges for packing win mot be accepted 13. PURCHASERS PERFOR_4LANCE OF SELLERS OBLIGATIONS. Shipment Distance. Where manufacturers have distributing points in xarioas pant of the coraay, shipment is If the Purchaser directs the Seer to correct naamnfaming or defective goods by a date to be agreed upon by the Expected from the nearest distribution polar to destination. and Excess freight will be deducted from Invoice when Purchaser and the Seller, and the Seller thereafter indicates in inability or tnwillingness to comply, the Purchaser sbipmems are made firmsgreater distance. may cause the work to be performed by the most Expeditions means mailable to i, and the Seer shall pay an costs associated with such work. Perkins. Seller shall procure at seers sole cost all necessary permits, certificates and licenses required by all applicable laws, regulations, ordinances and rules of the state, municipality, territory or political subdivision where the work is performed or required by any other duly communed public sutbarity having jurisdiction over the wait of,vendor. Seller harrher agrees to hold the Cky of Fan Collins harmless from and against all liability and loss incwted by them by reason of an assened er established violation of am• such laws. reguhtiom, ordinances, rules and regramaats. Authonzstioa All parties to this contract agree that the representatives are, in fact, boats fide and possess full and complete authority to bind said parties. LRIITATION OF TERIN . This Purchase Order Expressly limits acceptance to the terms and conditions stated herein set forth and any supplementary- or additional rains and conditions annexed hereto or incorporated herein by reference. Any additional or different terms and conditions proposed by seer ate objected to and hereby rejected 2. DELTI%F.RY. PLEASE AD17SE PURCHASING AGENT immediately if you cannot make complete shipment a active on yam promised delivery dam as noted Time is of the essence. Delivery and performance mast be effected within the time stated an the purchase order and the documents attached hereto. No am of the Purchasers including, without limitation, acceptance of partial fare deliveries, sba➢ opeate as a waiver of this provision. In the event of any delay, the Purchaser sba➢ have. in addition to other legal and equitable remedies, the option of placing this order elsewhere and holding the Seer liable for damages. However, the Seer shall nor be liable for damages as a result of delays due to carves nor reasonably foreseeable which are beyond is reasonable control and without its fault of negligence, such acts of God acts of civil or military authorities, govar,nna„tal priorities, fires, strikes, flood. epidemics; wars or lion provided that notice of the conditions cammg such delay is given to the Purchaser within five (5) days of the time when the Sella fast received knowledge thereof. In the evem of any inch delay, the date of delivery she➢ be extended for the period equal to the time actually lost by aaason of the delay. 3. WARRANTY. The Seller warrants that all goods, articles, material, and wait covered by this order will conform with applicable drawings, specifications, samples andcor other descriptions given, will be fit for the purposes intended, and performed with the highest degree of care and competence in accordance with accepted standards for work of a u-0,r uamre_ The Seller agrees to hold the purchaser harmless from any loss, damage or expense which the Purchaser may staffer or incur on account of the Sellers broach of warranty. The Seller shall replace, repair or make good without cost m the purchaser, any defects or fatalts orisine within one (1) year or within such longer period of time as maybe presrnbed by law or by the terms of any applicable warranty provided by the Sear after the date of acceptance of the goods fitmisbed hereunder (acceptance nor to be unreasonably delayed), resulting from imperfect or defective w•nrlc done or materials finished by the Seer. Acceptance ar me of goods by the Purchaser share not constitute a waiter of any claim under this warranty. Except as otharu•ise provided in this purchase order. the Sellers liability hereunder shall extend to all dosages proximately tamed by the breach of any of the foregoing warranties or guaantees, but such babiliry shall in no event include loss of pro$3 or loss of use. NO RIPLIED WARRANTY OR 3fERCHAhT ABILITY OR OF irI MESS FOR PURPOSE SHALL APPLY. 4. CHANGES IN LEGAL TERSIS. The Purchaser may make changes to legal terms by writen change order. 5. CHANGES IN CO3,51ERCIAL TERSIS. The Purchaser may make any changes to the terms, other than legal terms, inctndng additions to or delations from the quantities originally ordered in the specifications or daawiml�, by verbal or written chive order. If any such change affects the amaunf due or the time of performance hereurader, an equitable adjmmnem shall be made. 6. TERSIQATIONS. The Purchaser may at any time by writen change order, av*mi— this agreement as m airy or all portionsof the goods then not shipped subject to any equitable adjustment between the parties as to arty work or merenak then in progress provided that the Purchaser shall tun be liable for my charms for anticipated profits as the uncompleted portion of the goods andrar work, for incidental or consequential damages, and chat no such adjustment be made n favor of the Seller with respect to any goods which ate the Seer standard stock. No such termination shall relieve the Purchase or the Seller of any of their obligations as to nay goods delivered hereunder. 7. CLARSS FOR ADJUSTSIEAT. Any claim far adjustment most be asserted within thirty (30) days from the date the change or tatmmanion is ordered. S. COSIPLIANCE WITH LAW. The Seller warrants that all goods sold hereunder shall have been produced, sold delivered and furnished in strict compliance with all applicable laws and regulations m which the goods are subject. The Seller shall execute and delver such documents as may be required m effect or evidence compliance. All laws and regulations requited to be incorporated in agreements of this character are hereby incorporated herein by this reference. The Seer agrees to indemnify and hold the Purchaser harmless from all costs and damages suffered by the Purchaser as a result of the Sellers failure to comply with such taw. 9. AS.SIGNSIENT. Neither pant %ball assign, transfer, or convey this order, or any monies due or to become due hereunder without the prim written consent of the other pant. 10. TITLE. The .Seller warrants full, clear and unrestricted title to the Purchaser for all equipment, materials, and items famished in performance of this agreement, free and clear of any and all hem, restrictions, reservations, security ntarest encumbrances and claims of others. The Seller shall release the Pmthasu and its contractors of any tier from all liability and clanns of any nature resulting from the perfamuo, a of inch work. This release shall apply even in the evem of fault of negligence of the patty released and shall extend to the directors, officers and employees of inch party. The Seller's contractual obligations, including warranty, shall not be deemed ro be reduced in any way, because such work is performed or tamed to be performed by the Purchaser. 14. PATENTS. Whenever the Seller is required to me any design, device, material or process covered by latter, patamt, trademath or copyrighL the Seer stall indemnify and sate harmless the Purchaser from any and s➢ claims for mfrmgemem by resin of the use of such patented design. device, material or process in connection with the contact, and shall indemnify the Purchaser for any cos; expense ordamage which it may be obliged to pay by reason of such ttiffingemeat at any time daring the prosecution or aver the completion of the work. In case said egttipast, or any pan thereof or the intended use of the goods, is in such strict held on constitute infringanent and the use of said equipment or pan is enjoined, the Seller shall, at its own expense and at its option, either procare for the Purchaser the tight ro connan using said equipmem or parts, replace the same with substantially equal but ❑aninf urging equipment, or modify it so it becomes ❑mniftur dug. IS.INSOLVENCY. If the Seller shall become insolvent cr bankmpt, make an assiminem for the benefit of aedimm appoint a receiver or amsme for any of the Sees property or business, this order may forthwith be canceled by the Parcbaser without liability. 16. GOVERNING LAW. The definitions of terms used or the interlremurm of the agreement and the rights of all parties hereunder shall be construed under and ;o timed by the laws of the State of Colorado, USA. The following Additional Conditions apply only it cases where the Seller is to perform work hereunder, including the services of Se➢ors Represenmrive(s), on the premises of others. 17. SELLERS RESPONSIBILITY. The Seller shall carry on said work at Seller's own risk until the same is folly completed and accepted and shall, in case of any accidem; destruction or injury m the work andror materials before Sellers final completion and acceptance, complete the work at Seller's own expense and to the satisfaction of the Purchases. When materials and equipment are furroished by otheas for installation or erection by the Seller, the Seller shall receiue, unload atwe aril 1-11- snare at the site —I trtcarsm a W=dble airiefur as daaugh such erxtniah autltw equity—1 were being furnished by the Seller under. the order. i8_ INSURANCE. The Seller shall, at his own expense, provide for the payment of workers conipemation, incfuding Occupational disease benefim to its employees employed on or in connection with the work covered by this purchase order. andror to their dependents in accordance with the Laws of the stare in which the work is to be dare. The Seer shall also cam, comprehatane general liability including, but not limited to, contactual and automobile public liability insurance with bodily injury and death limits of at least S3001000 for anyone person, SSO0,000 for any one accident and property damage limit per accident of S400.000. The Seller shall likewise require his contractors, if am, to provide for such compensation and insurance- Before any of the Seller or his contractors employees shall do say work upon the premises of others, the Seller shall farnish the Purchase with a certificate that such compensation and instance have been provided. Such certificates shall specify the dam when such compensation and insurance have been provided Such certificates shall specify the date when such compensation and insurance expires. The Seller agrees that such compensation and instance shall be mainraned until after the entire work is completed and accepted. 19. PROTECTION AGAINST ACCIDENTS AND DA'AAGES. The Seller hereby assumes the entire r-•possibility and liability for any and all damage, loss or injury of any kind or nature whatsoever ro persons or property caused by or resulting from the Execution of the work provided for in this purchase order or in connection herewith. The Seller will indemnify and hold harmless the Purchaser and any or all of the Purcbasers officers, agents and employees from and against any and all claims, losses, damages, charges or expenses, whether direct or indirect, and whether to persons or property m which the Purchaser may be put or subject by reason of any ace action, neglect, omission or default on the pan of the Seller, any of his contractors, or any of the Sellers or contractors offices, agents or employees. In case any snit or other proceedings shall be brought against the Purchase, or its officers, agents or employees at any time on account or by reason of say act, action, neglect, omission or default of the Seller of any of his contractors or ate• of its or theft officers, agems or employees as aforesaid the Seller hereby agrees to assume the defeme thereof and to defend the same at the Sees own expense, to pay any and all costs, charges, anomeys fees and other expenses. any and all judemems that may be incurred by or obtained against the Purchaser or any of its or their officers, agents ar employees in such suits or other proceedings, and in case judgment or other lie be placed upon or obtained against the property of the Purchaser, or said parties in or as a result of such suits or other proceedmgs, the Seller will at once cause the sate to be dissolved and discharged by giving bond or otherwise. The Seller and his contractors shall take all safeery precautions, famish and install all gttards necessary for the prevention of accidents, comply with a➢ laws and regulations with reeard to safety itctadmg, but without limitation, the Occupational Safery, and Health Act of 1970 and all rules and regulations issued pursuant therein. Revised 032010 Fort Collins Utilities Transformer Bid Loss Data Sheet i 'lnits Bid # 7169 Preparer Name IName Le Date: Preparer Contact Num: Number NL Loss Cost $ FL Loss Cost $ Supplier Mr / fvtfr# Base Bid $ / Each DelMlks Guar No Load Loss Guar Full Load Loss . Impedance Meet Specs? (Yes / No) Escalation (is / is not) a factor GuarTotal Load Loss NL LossNL Loss Cost FL Loss' FL Loss Cost Evaluated Bid Base Bid E)dended Cost (Total $) Supplier 1 Supplier 2 Mfg 1 Mfr2 $ $ 0 0 0 0 0.00- 0.00 0 0 $~- $ $ $ $ $ $ Supplier 3 Mfr 3 $ 0 0 0.00 0 $ $ $ $ Directions for Bidders: 1) Fill out the information in the cells with blue text. 2) Save the file using your company name and the bid number and e-mail it to: purchasing@fcgov.com (Example: TransformerSales_Bid_.xls) If you are concerned about security, you may password -protect this file after you have entered your data. To protect this file, take the following steps: A) Select Tools, Options B) Select Security Tab C) Type your password in the "Password to Open" field. D) Re-enter your password to confirm it. Important! Please remember to include this password in the bid information that will be sealed in the envelope that will be unsealed at Bid Opening. This will secure your data until the time of the bid opening. E) Save the file and e-mail it to: purchasing@fcgov.com THE CITY OF FORT COLLINS Light and Power Department P.O. Box 580 Fort Collins, CO 80522 i SPECIFICATION NO: 368-300 TITLE: PAD -MOUNTED COMPARTMENTAL-TYPE,THREE-PHASE DISTRIBUTION TRANSFORMERS WITH SEPARABLE INSULATED LOAD BREAK HIGH -VOLTAGE CONNECTORS APPROVED BY: ' Kraig Bader j Standards Engineering Division) Manager ORIGINATION DATE: 8/12/83 REVISED: 2/2/2005 REV. SYM: MM ITEMS COVERED BY THIS SPECIFICATION DESCRIPTION STOCK NO. SPECIFICATION NO. SERIAL 75 KVA, 208Y/120 RADIAL 368-300 -006 75 KVA, 408Y/277 RADIAL 368-300 -007 75 KVA, 208Y/120 LOOP 368-300 -008 75 KVA, 480Y/277 LOOP 368-300 -009 150 KVA, 208Y/120 LOOP 368-300 -015 150 KVA, 480Y/277 LOOP 368-300 -016 300 KVA, 208Y/120 LOOP 368-300 -030 300 KVA, 480Y/277 LOOP 368-300 -031 500 KVA, 208Y/120 LOOP 368-300 -050 500 KVA, 480Y/277 LOOP 368-300 -051 750 KVA, 208Y/120 LOOP 368-300 -075 750 KVA, 480Y/277 LOOP 368-300 -076 1000 KVA, 208Y/120 LOOP 368-300 -100 1000 KVA, 480Y/277 LOOP 368-300 -101 1500 KVA, 480Y/277 LOOP 368-300 -151 2000 KVA, 480Y/277 LOOP 368-300 -201 2500 KVA, 480Y/277 LOOP 368-300 -251 368-300