Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 7044 MISCELLANEOUS STREET IMPROVEMENTS (8)Sp 2 0 2010 RECEIVED September 7, 2010 City of Fort Collins Purchasing Department PO Box 580 Fort Collins, CO 80522 Re: Renewal, 7044 Miscellaneous Street Improvements Dear Mr. O'Neill: Enclosed is the signed, original Agreement, plus our Certificate of Insurance for this project. If I can be of further assistance with this agreement, please contact me. Best regards, Do Anderson Contracts Administrator Connell Resources, Inc. 7785 Highland Meadows Parkway #100 Fort Collins, CO 80528 Telephone: (970) 223-3151 Facsimile: (970) 223-3191 dandersonCaD,connellresources.com RECEIVED SEP 01 1010 a -le Io 4 q City of F6rt Collins August 31, 2010 Connell Resources Attn: Mr. David E Simpson 7785 Highland Meadows Parkway Suite 100 Fort Collins, CO 80528 RE: Renewal, 7044 Miscellaneous Street Improvements Dear Mr. Simpson: Financial Services Purchasing Division 215 North Mason Street 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 - fax fcgov.com/Purchasing The City of Fort Collins wishes to extend the agreement term for the above captioned proposal per the existing terms and conditions and the following: Unit Bid Total Bid Item # Description Bid Qty. UM Price Price 202-01 Remove pipe (ADS -CM P-RCP-PVC-C LAY TILE) 30 LF $11.90 $357.00/ 202-02 Plug Existing Pipe ( 12"-36") 1 EACH $348.25 $348.25✓ 202-03 Remove Standard Type II Vertical Curb 137 LF $3.53 ; $483.61 202-04 Remove Roll Over Curb And Sidewalk 100 LF $14.41, $1,441.00 202-05 Remove Crosspan/Driveway/Apron 150 SF $2.57. $385.50 202-06 Remove Concrete Paving 8" Avg Depth. 400 SF $2.75 $1,100.00 202-07 Remove Asphalt 8" Avg. Depth. 50 SY $8.30 $415.00 202-08 Roto Mill 3"-4" Asphalt. 100 SY $3.00 $300.00 202-09 Profile Mill 0-3". 600 SY $6.15 $3,690.00 202-10 Remove Sidewalk 4"-6" Depth. 403 SF $1.70 $685.10 202-11 Remove Rip Rap 20 SY $14.35 $287.00 202-12 Remove Fence Various Types. 100 LF $1.15 . $115.00 202-13 Removal of Pavement Marking. 100 LF $5.20 $520.00 202-14 Saw Cutting Existing Asphalt. 100 LF $1.45 $145.00 202-15 Saw Cut Cone. 6" or Less in Depth 100 LF $4.05 $405.00 202-16 Saw Cut Cone. More Than 6" Depth 100 LF $5.80 : $580.00 202-17 Saw Cut Asphalt 6" or Less in Depth 100 LF $1.80 $180.00 202-18 Saw Cut Asphalt More Than 6" Depth 100 LF $2.40 $240.00 203-01 Unclassified Excavation 115 CY $3.00 $345.00 203-02 Embankment ( CIP) 75 CY $4.00 $300.00 203-03 Borrow Suitable Fill Material 50 CY $15.55r $777.50 203-04 Load, Haul And Dispose 65 CY $9.80 • $637.00 203-05 Topsoil (Stripping, Stockpiling, Placing) 75 CY $6.90, $517.50 203-06 Muck Excavation. 50 CY $22.35 $1,117.50 203-07 Borrow ABC Class 5 or 6 (CIP). 50 TON $21.60' $1,080.00 203-08 Borrow Fill R-25 50 TON $15.74/ $787.00 203-09 Median Splash Block Shaping 500 SF $0.5Qi $250.00 203-10 Import Topsoil Screened 50 CY $38.05r $1,902.50 206-01 Structure Excavation 50 CY $9.24/ $462.00 206-02 Structure Backfill On Site Fill 50 CY $15.14/ $757.00 206-03 Backfill Class 1 50 CY $27.00' $1,350.00 206-04 Backfill Class II 50 CY $11.45 f $572.50 Rev 02/2010 206-05 Haul And Leveling 50 CY $14.20 - $710.00 206-06 Structure Backfill Flow Fill 50 CY $93.00' $4,650.00 206-07 Filter material 1-1/2 " washed rock 50 TON $18.83.' $941.50 206-08 Dewatering (Min. 2" pump size) 3 DY $311.00/ $933.00 208-002 Silt Fence Furnished And Installed 100 LF $3.03/ $303.00 208-003 Straw Bales (Weed Free) Furnished And Installed 20 EACH $145.36/ $2,907.20 208-004 Soil Retention Blanket 500 SF $0.60' $300.00 208-005 Erosion log (6" Diameter) 50 LF $2.60 / $130.00 208-006 Rock Sock 25 LF $1.20 / $30.00 208-007 Sand Bag 200 EACH $3.80 / $760.00 208-008 Concrete Washout Structure 1 EACH $725.01� $725.01 208-009 Storm Drain Inlet Protection 3 EACH $215.00/ $645.00 208-01 SWMP Permit 1 LS $491.55/ $491.55 208-010 Stabilized Const. Entrance (70'x12') 1 EACH $750.01./ $750.01 208-011 Sediment Removal and Disposal 30 CY $22.30/ $669.00 208-012 Erosion Control Supervisor 25 HR $44.80/ $1,120.00 210-01 Adjust Valve Box 3 EACH $164.00/ $492.00 210-02 Adjust Manhole Ring/Cover 2 EACH $415.20 i $830.40 210-03 Modify Manhole 2 EACH $331.99/ $663.98 210-04 Relocate Fire Hydrant. 1 EACH $3,090.14/ $3,090.14 210-05 Relocate Water Meter 1 EACH $574.97/ $574.97 210-06 Relocate C.P. Test Station 1 EACH $450.84/ $450.84 210-07 Irrigation Service (3/4"-1 ") 2 EACH $288.0?/ $576.04 210-08 Relocate Fence Various Types 100 LF $2.26 i $226.00 210-09 Relocate Mailbox 2 EACH $145.06/ $290.12 304-01 Aggregate Base CL 5-6 CIP (6") 50 TON $21.60i $1,080.00 304-02 Shouldering Base Class 5-6- (4in) CIP 50 TON $21.60/ $1,080.00 304-03 Patch Placement Base CL-5-6 (6") CIP 50 TON $21.30/ $1,065.00 306-01 Reconditioning (8") 50 SY $1.60/ $80.00 Asphalt Hand Patching - Grading S-100 (PG 64-28) (2"-3" 403-01 Depth) 3 TON $137.00/ $411.00 Asphalt Paver Patch - Grading S-75 or S-100 (PG 58-28) (3" 403-010 Depth) 25 TON $106.00/ $2,650.00 Asphalt Hand Patching - Grading S-75 or S100 (PG 58-28) 403-02 (2"-3" Depth) 3 TON $122.00 $366.00 Asphalt Hand Patching - Grading SG-75 or SG-100 (PG 58- 403-03 28) (6"-10" Depth) 6 TON $115.00 $690.00 Hot Bituminous Pavement - Grading S-100 (PG 64-28) (2"-3" 403-04 Depth) 50 TON $79.00. $3,950.00 Hot Bituminous Pavement - Grading S-75 or S-100 (PG 58- 403-05 28)(2"-3" Depth) 50 TON $63.60 / $3,180.00 Hot Bituminous Pavement - Grading SG-75 or SG-100 (PG 403-06 58-28)(3"-5" Depth) 50 TON $56.60 $2,830.00 403-07 Asphalt Paver Leveling Course SG-75 or SG 100 (PG58-28) 25 TON $61.00/ $1,525.00 403-08 Asphalt Paver Patch - Grading 3-100 (PG 6428) (3" Depth) 25 TON $122.00✓ $3,050.00 403-09 Asphalt Paver Patch SG-75 or SG-100 (PG58-28) (3" Depth) 25 TON $99.25' $2,481.25 412-01 Concrete Pavement 10" - Class P 75 SY $45.98" ' $3,448.50 412-02 Concrete Pavement 8" - Class P 175 SY $41.36,- $7,238.00 420-01 Geotextile Stabilization Fabric 50 SY $13.00. $650.00 420-02 Geogrid Reinforcement 50 SY $5.70 $285.00 420-03 Geotextile Paving Fabric 50 SY $11.60 $580.00 506-01 Riprap 12" Class M 10 TON $49.30, $493.00 514-01 Bridge Rail 30 LF $96.20 $2,886.00 514-02 Bridge Rail Post 4 EACH $203.05 $812.20 Rev 02/2010 514-03 Masonry 50 SF $16.32 $816.00 601-01 Concrete, Class D (Box Culvert) 12 CY $642.95 $7,715.40 601-02 Concrete, Class D (Wall) 12 CY $551.56 $6,618.72 602-01 Reinforcing Steel 500 LB $1.42 $710.00 602-02 Reinforcing Steel (Epoxy Coated) 500 LB $1.94 $970.00 603-01 12" CMP 27 LF $35.87 $968.49 603-02 12" CMP FES 2 EACH $63.83 $127.66 603-03 24" CMP 30 LF $52.21 $1,566.30 603-04 24" CMP FES 2 EACH $157.32 $314.64 603-05 12" Class III RCP 30 LF $30.58 $917.40 603-06 15" Class III RCP 30 LF $33.08 $992.40 603-07 18" Class III RCP 30 LF $36.86 $1,105.80. 603-08 21" Class III RCP 30 LF $41.48 $1,244.40 603-09 24" Class III RCP 80 LF $44.24 $3,539.20 603-10 27" Class III RCP 30 LF $55.38, $1,661.40 603-11 30" Class III RCP 30 LF $62.66 $1,879.80 603-12 36" Class III RCP 30 LF $82.85 $2,485.50 603-13 42"Class III RCP 30 LF $100.49 $3,014.70 603-14 12 RCP Class III FES 2 EACH $293.56 $587.12 603-15 15" RCP Class III FES 2 EACH $343.49 $686.98 603-16 18" RCP Class III FES 2 EACH $393.35 $786.70 603-17 21" RCP Class III FES 2 EACH $440.97 $881.94 603-18 24" RCP Class III FES 2 EACH $485.01 $970.02 603-19 27" RCP Class III FES 2 EACH $538.38 $1,076.76 603-20 30" RCP Class III FES 2 EACH $599.88 $1,199.76 603-21 36" RCP Class III FES 2 EACH $1,059.40 $2,118.80 603-22 42" RCP Class III FES 2 EACH $1,240.56 $2,481.12 603-23 24"x 38" RCP 30 LF $84.97 $2,549.10 603-24 24"x 38" RCP- FES 2 EACH $644.01 $1,288.02 603-25 14" x23" RCP 30 LF $53.92 $1,617.60 603-26 14"x 23" RCP FES 2 EACH $353.94 $707.88 603-27 24" Trash Rack 2 EACH $326.05• $652.10 603-28 15" ADS N-12 30 LF $34.77• $1,043.10 603-29 15" ADS FES 2 EACH $179.87, $359.74 603-30 18" ADS Pipe N-12 30 LF $38.06 $1,141.80 603-31 18" ADS FES 2 EACH $179.54" $359.08 603-32 24" ADS PipeN-12 30 LF $51.80 $1,554.00 603-34 36" ADS Pipe N-12 30 LF $81.84 $2,455.20 603-35 36" ADS FES 2 EACH $616.17 $1,232.34 603-36 4" PVC Irrigation Pipe( SCH-200) 30 LF $23.22 $696.60 603-37 4" Sanitary Sewer Service (SDR-35) 30 LF $29.00 $870.00 603-38 6" Pvc Sanitary Sewer 30 LF $25.83 $774.90 603-39 8" Pvc Sanitary Sewer (SDR-35) 30 LF $27.25 $817.50 603-40 Concrete Encasement 20 LF $130.52 $2,610.40 603-41 Concrete Cut Off Walls (ditch crossing) 2 EACH $1,450.56 $2,901.12 603-42 Pipe Headwall 2 EACH $1,736.89 $3,473.78 603-43 4" Median Underdrain Pipe Perforated 30 LF $19.09 $572.70 603-44 4" Median Underdrain Pipe Solid 30 LF $17.79 $533.70 603-45 4" Clean Out 2 EACH $383.31 $766.62 604-01 Type 3 Single Inlet (6.00') 2 EACH $2,195.04 $4,390.08 604-02 Type 3 Double Inlet (6.00') 2 EACH $3,322.08 $6,644.16 604-03 5' Type R Inlet (6.00') 2 EACH $3,012.81 ` $6,025.62 Rev 02/2010 604-04 10' Type R Inlet (6.00') 2 EACH $4,064.81 $8,129.62 604-05 15' Type R Inlet (6.00') 2 EACH $5,137.57 $10,275.14 604-06 Combination Type 13 Inlet (6.00') 2 EACH $2,102.02 $4,204.04 604-07 COFC Single Inlet ( Area Inlet) (6.00') 2 EACH $1,956.18 $3,912.36 604-08 4' Diameter Manhole 2 EACH $1,572.98 $3,145.96 604-09 5' Diameter Manhole 2 EACH $2,125.17 $4,250.34 604-10 5' Diameter Manhole Drop 2 EACH $2,125.17 $4,250.34 604-11 6' Diameter Manhole 2 EACH $3,322.05 $6,644.10 606-33 24" ADS FES 2 EACH $232.04 $464.08 607-01 Temporary Fence - Corral Fence 50 LF $17.39 $869.50 607-02 Temporary Fence - Corral Panel & Screen 50 LF $23.18 $1,159.00 607-03 Privacy Fence 8' Cedar 100 LF $18.50 $1,850.00 607-04 Privacy Fence 6' Cedar 100 LF $15.02. $1,502.00 607-05 2 Rail Split Fence 100 LF $13.91. $1,391.00 607-06 3 Railed Dowel Fence 100 LF $16.18 $1,618.00 607-07 4 Strand Barbed Wire Fence 100 LF $2.27. $227.00 607-08 Orange Safety Fence 100 LF $2.04 $204.00 608-01 Concrete Sidewalk (4") 500 SF $3.21. $1,605.00 608-02 Concrete Sidewalk (6") 935 SF $3.62 $3,384.70 Concrete Access Ramps with Approved Truncated Domes 608-03 (6") 36 SF $62.66 $2,255.76 608-04 Concrete Drive Approach (8") 250 SF $4.94 $1,235.00 608-05 Drive Over Curb and Sidewalk (6") 200 SF $4.01 $802.00 608-06 Concrete Crosspan and Apron (10") 390 SF $5.92 $2,308.80 608-07 Concrete Trickle Pan ( 4' wide x 8" thick) 760 SF $6.26 - $4,757.60 Colored Concrete Bike Path (5" Fibermesh) (Yosemite 608-08 Brown) 1000 SF $3.77 $3,770.00 608-09 Bus Stop Pad (8") 500 SF $4.88 $2,440.00 608-10 Pedestrian Refuge Island (6") 100 SF $4.64. $464.00 608-11 High Early Concrete (24hr) 25 CY $137.48 $3,437.00 608-12 Flowable Fill Concrete 50 CY $96.74 $4,837.00 609-01 Remove and Replace Concrete Curb and Gutter 100 LF $20.31 $2,031.00 609-02 Vertical Curb and Gutter (30") 66 LF $15.08 , $995.28 609-03 Outfall Curb and Gutter (18") 50 LF $12.76 ' $638.00 609-04 Rollover Curb and Gutter 50 LF $17.40, $870.00 609-05 Driveway Curb Cut 4 EACH $580.16, $2,320.64 609-06 Asphalt Curb 150 LF $3.35 , $502.50 610-01 Exposed Aggregate Concrete for Hardscape Medians (4") 250 SF $7.25 $1,812.50 610-02 Colored Patterned Concrete (Stamped) (6") 250 SF $9.13 ' $2,282.50 610-03 Interlocking Sidewalk Pavers -Type 1 250 SF $15.90- $3,975.00 619-01 6" D.I.P. Class 52 w/ Poly -Wrap 30 LF $44.81_ $1,344.30 619-02 6"x6" Tee 1 EACH $205.44 $205.44 619-03 6"x6" Cross 1 EACH $270.58- $270.58 619-04 6" 45 Degree Bend 1 EACH $139.53 $139.53 619-05 6" Gate Valve And Box 1 EACH $863.27 $863.27 619-06 6" Mega Lugs Restraints 2 EACH $26.68 $53.36 619-07 6"x2" Blow Off 1 EACH $845.27' $845.27 619-08 8" D.I.P. Class 52 w/ Ploy -Wrap 30 LF $52.24 $1,567.20 619-09 8"x6" Tee 1 EACH $240.56 $240.56 619-10 8"x8" Cross 1 EACH $270.69 $270.69 619-11 8" 45 Degree Bend 1 EACH $172.14` $172.14 619-12 8"x2" Blow Off 1 EACH $889.45 $889.45 619-13 8" PVC C-900 30 LF $32.93 $987.90 Rev 02/2010 619-14 8" Gate Valve And Box 1 EACH $1,238.05 $1,238.05 619-15 8" Mega Lugs Restraints 2 EACH $40.62 $81.24 619-16 Fire Hydrant 1 EACH $2,734.12 $2,734.12 619-17 6" Fire Hydrant Extension 1 EACH $435.12 ' $435.12 619-18 12" Fire Hydrant Extension 1 EACH .$512.86 ' $512.86 619-19 3/4" Copper Pipe 30 LF $6.09 ` $182.70 619-20 3/4" Corp Stop 1 EACH $228.44 $228.44 619-21 3/4" Curb Stop 1 EACH $143.90 $143.90 619-22 3/4" Meter Pit with 3/4" Yoke 1 EACH $823.99 $823.99 619-23 1" Copper Pipe 30 LF $7.27 $218.10 619-24 1" Corp Stop 1 EACH $243.53 $243.53 619-25 1" Curb Stop 1 EACH $172.91 $172.91 619-26 1" Meter Pit with 3/4" Yoke 1 EACH $878.53 $878.53 619-27 1" Air Vac Assembly 1 EACH $4,442.41 $4,442.41 619-28 8" Gate Valve (open left) w/ Valve Box 1 EACH $1,238.05 $1,238.05 619-29 8" Gate Valve (open right) w/ Valve Box 1 EACH $1,238.05 $1,238.05 619-30 16"x16"x8" Tapping Saddle w/ T.B. 1 EACH $2,285.70 $2,285.70 619-31 8" Tapping Gate Valve w/ Valve Box 1 EACH $1,238.05 $1,238.05 619-32 Join to Existing 8" Water Line 1 EACH $1,362.29 $1,362.29 619-33 Join to Existing 12" Water Line 1 EACH $1,666.99- $1,666.99 619-34 Join to Existing 16" Water Line 1 EACH $1,970.46 $1,970.46 619-35 Join to Existing 24" Water Line 1 EACH $3,321.81 . $3,321.81 626-01 Mobilization (See Spec) 1 EACH $0.00 $0.00 630-01 Traffic Control Supervisor 1 DY $406.11 $406.11 630-02 Flagging 8 HR $19.70 $157.60 900-01 4" CL-200 PVC Main (4.5 cover) 100 LF $3.45, $345.00 900-02 6" CL-200 PVC Main (4.5 cover) 100 LF $5.25 $525.00 900-03 Cap Irrigation Line 2 EACH $19.46. $38.92 900-04 Sprinkler Line Install ( Trenching and Backfill) 100 LF $2.92 $292.00 900-05 Mainline PVC Class 200 ( 3" Welded) 100 LF $1.37 . $137.00 900-06 Laterals PVC 200 ( 2"-11 /2"-1 ") 100 LF $0.66. $66.00 900-07 Remote Control Zone Valves 2 EACH $16.32 $32.64 900-08 Isolation Gate Valves 2" Square Nut 2 EACH $195.46 $390.92 900-09 Valve Boxes 2 EACH $29.03 _ $58.06 900-10 Control System 18 Station 1 EACH $389.44 $389.44 Electric Control Wiring ( 5 Wires #14 Feed and #12 900-11 Common) 100 LF $0.33 $33.00 900-12 Gear Driven Rotor Heads ( Rainbird) 2 EACH $36.35 $72.70 $318,369.96 The term will be extended for one (1) additional year, August 1, 2010 through July 31, 2011. If the renewal is acceptable to your firm, please sign this letter in the space provided include a current copy of insurance naming the City as an additional insured and return all documents to the City of Fort Collins, Purchasing Division, P. O. Box 580, Fort Collins, CO 80522, within the next fifteen days. Rev 0212010 If this extension is not agreeable with your firm, we ask that you send us a written notice stating that you do not wish to renew the contract and state the reason for non -renewal. Please contact John D. Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 if you have any questions regarding this matter. Sincerely, C CJs B. O'Neill WII, CPPO, F N I G P or of Purchasing and Risk Management Signature Date (Please indicate your desire to renew 7044 by signing this letter and returning it to Purchasing Division within the next fifteen days.) JBO:kt Rev 02/2010