HomeMy WebLinkAboutCORRESPONDENCE - BID - 7044 MISCELLANEOUS STREET IMPROVEMENTS (8)Sp 2 0 2010
RECEIVED
September 7, 2010
City of Fort Collins Purchasing Department
PO Box 580
Fort Collins, CO 80522
Re: Renewal, 7044 Miscellaneous Street Improvements
Dear Mr. O'Neill:
Enclosed is the signed, original Agreement, plus our Certificate of
Insurance for this project.
If I can be of further assistance with this agreement, please contact me.
Best regards,
Do Anderson
Contracts Administrator
Connell Resources, Inc.
7785 Highland Meadows Parkway #100
Fort Collins, CO 80528
Telephone: (970) 223-3151
Facsimile: (970) 223-3191
dandersonCaD,connellresources.com
RECEIVED SEP 01 1010
a -le Io 4 q
City of
F6rt Collins
August 31, 2010
Connell Resources
Attn: Mr. David E Simpson
7785 Highland Meadows Parkway Suite 100
Fort Collins, CO 80528
RE: Renewal, 7044 Miscellaneous Street Improvements
Dear Mr. Simpson:
Financial Services
Purchasing Division
215 North Mason Street
2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707 - fax
fcgov.com/Purchasing
The City of Fort Collins wishes to extend the agreement term for the above captioned proposal
per the existing terms and conditions and the following:
Unit Bid
Total Bid
Item #
Description
Bid Qty.
UM
Price
Price
202-01
Remove pipe (ADS -CM P-RCP-PVC-C LAY TILE)
30
LF
$11.90
$357.00/
202-02
Plug Existing Pipe ( 12"-36")
1
EACH
$348.25
$348.25✓
202-03
Remove Standard Type II Vertical Curb
137
LF
$3.53 ;
$483.61
202-04
Remove Roll Over Curb And Sidewalk
100
LF
$14.41,
$1,441.00
202-05
Remove Crosspan/Driveway/Apron
150
SF
$2.57.
$385.50
202-06
Remove Concrete Paving 8" Avg Depth.
400
SF
$2.75
$1,100.00
202-07
Remove Asphalt 8" Avg. Depth.
50
SY
$8.30
$415.00
202-08
Roto Mill 3"-4" Asphalt.
100
SY
$3.00
$300.00
202-09
Profile Mill 0-3".
600
SY
$6.15
$3,690.00
202-10
Remove Sidewalk 4"-6" Depth.
403
SF
$1.70
$685.10
202-11
Remove Rip Rap
20
SY
$14.35
$287.00
202-12
Remove Fence Various Types.
100
LF
$1.15 .
$115.00
202-13
Removal of Pavement Marking.
100
LF
$5.20
$520.00
202-14
Saw Cutting Existing Asphalt.
100
LF
$1.45
$145.00
202-15
Saw Cut Cone. 6" or Less in Depth
100
LF
$4.05
$405.00
202-16
Saw Cut Cone. More Than 6" Depth
100
LF
$5.80 :
$580.00
202-17
Saw Cut Asphalt 6" or Less in Depth
100
LF
$1.80
$180.00
202-18
Saw Cut Asphalt More Than 6" Depth
100
LF
$2.40
$240.00
203-01
Unclassified Excavation
115
CY
$3.00
$345.00
203-02
Embankment ( CIP)
75
CY
$4.00
$300.00
203-03
Borrow Suitable Fill Material
50
CY
$15.55r
$777.50
203-04
Load, Haul And Dispose
65
CY
$9.80 •
$637.00
203-05
Topsoil (Stripping, Stockpiling, Placing)
75
CY
$6.90,
$517.50
203-06
Muck Excavation.
50
CY
$22.35
$1,117.50
203-07
Borrow ABC Class 5 or 6 (CIP).
50
TON
$21.60'
$1,080.00
203-08
Borrow Fill R-25
50
TON
$15.74/
$787.00
203-09
Median Splash Block Shaping
500
SF
$0.5Qi
$250.00
203-10
Import Topsoil Screened
50
CY
$38.05r
$1,902.50
206-01
Structure Excavation
50
CY
$9.24/
$462.00
206-02
Structure Backfill On Site Fill
50
CY
$15.14/
$757.00
206-03
Backfill Class 1
50
CY
$27.00'
$1,350.00
206-04
Backfill Class II
50
CY
$11.45 f
$572.50
Rev 02/2010
206-05
Haul And Leveling
50
CY
$14.20 -
$710.00
206-06
Structure Backfill Flow Fill
50
CY
$93.00'
$4,650.00
206-07
Filter material 1-1/2 " washed rock
50
TON
$18.83.'
$941.50
206-08
Dewatering (Min. 2" pump size)
3
DY
$311.00/
$933.00
208-002
Silt Fence Furnished And Installed
100
LF
$3.03/
$303.00
208-003
Straw Bales (Weed Free) Furnished And Installed
20
EACH
$145.36/
$2,907.20
208-004
Soil Retention Blanket
500
SF
$0.60'
$300.00
208-005
Erosion log (6" Diameter)
50
LF
$2.60 /
$130.00
208-006
Rock Sock
25
LF
$1.20 /
$30.00
208-007
Sand Bag
200
EACH
$3.80 /
$760.00
208-008
Concrete Washout Structure
1
EACH
$725.01�
$725.01
208-009
Storm Drain Inlet Protection
3
EACH
$215.00/
$645.00
208-01
SWMP Permit
1
LS
$491.55/
$491.55
208-010
Stabilized Const. Entrance (70'x12')
1
EACH
$750.01./
$750.01
208-011
Sediment Removal and Disposal
30
CY
$22.30/
$669.00
208-012
Erosion Control Supervisor
25
HR
$44.80/
$1,120.00
210-01
Adjust Valve Box
3
EACH
$164.00/
$492.00
210-02
Adjust Manhole Ring/Cover
2
EACH
$415.20 i
$830.40
210-03
Modify Manhole
2
EACH
$331.99/
$663.98
210-04
Relocate Fire Hydrant.
1
EACH
$3,090.14/
$3,090.14
210-05
Relocate Water Meter
1
EACH
$574.97/
$574.97
210-06
Relocate C.P. Test Station
1
EACH
$450.84/
$450.84
210-07
Irrigation Service (3/4"-1 ")
2
EACH
$288.0?/
$576.04
210-08
Relocate Fence Various Types
100
LF
$2.26 i
$226.00
210-09
Relocate Mailbox
2
EACH
$145.06/
$290.12
304-01
Aggregate Base CL 5-6 CIP (6")
50
TON
$21.60i
$1,080.00
304-02
Shouldering Base Class 5-6- (4in) CIP
50
TON
$21.60/
$1,080.00
304-03
Patch Placement Base CL-5-6 (6") CIP
50
TON
$21.30/
$1,065.00
306-01
Reconditioning (8")
50
SY
$1.60/
$80.00
Asphalt Hand Patching - Grading S-100 (PG 64-28) (2"-3"
403-01
Depth)
3
TON
$137.00/
$411.00
Asphalt Paver Patch - Grading S-75 or S-100 (PG 58-28) (3"
403-010
Depth)
25
TON
$106.00/
$2,650.00
Asphalt Hand Patching - Grading S-75 or S100 (PG 58-28)
403-02
(2"-3" Depth)
3
TON
$122.00
$366.00
Asphalt Hand Patching - Grading SG-75 or SG-100 (PG 58-
403-03
28) (6"-10" Depth)
6
TON
$115.00
$690.00
Hot Bituminous Pavement - Grading S-100 (PG 64-28) (2"-3"
403-04
Depth)
50
TON
$79.00.
$3,950.00
Hot Bituminous Pavement - Grading S-75 or S-100 (PG 58-
403-05
28)(2"-3" Depth)
50
TON
$63.60 /
$3,180.00
Hot Bituminous Pavement - Grading SG-75 or SG-100 (PG
403-06
58-28)(3"-5" Depth)
50
TON
$56.60
$2,830.00
403-07
Asphalt Paver Leveling Course SG-75 or SG 100 (PG58-28)
25
TON
$61.00/
$1,525.00
403-08
Asphalt Paver Patch - Grading 3-100 (PG 6428) (3" Depth)
25
TON
$122.00✓
$3,050.00
403-09
Asphalt Paver Patch SG-75 or SG-100 (PG58-28) (3" Depth)
25
TON
$99.25'
$2,481.25
412-01
Concrete Pavement 10" - Class P
75
SY
$45.98" '
$3,448.50
412-02
Concrete Pavement 8" - Class P
175
SY
$41.36,-
$7,238.00
420-01
Geotextile Stabilization Fabric
50
SY
$13.00.
$650.00
420-02
Geogrid Reinforcement
50
SY
$5.70
$285.00
420-03
Geotextile Paving Fabric
50
SY
$11.60
$580.00
506-01
Riprap 12" Class M
10
TON
$49.30,
$493.00
514-01
Bridge Rail
30
LF
$96.20
$2,886.00
514-02
Bridge Rail Post
4
EACH
$203.05
$812.20
Rev 02/2010
514-03
Masonry
50
SF
$16.32
$816.00
601-01
Concrete, Class D (Box Culvert)
12
CY
$642.95
$7,715.40
601-02
Concrete, Class D (Wall)
12
CY
$551.56
$6,618.72
602-01
Reinforcing Steel
500
LB
$1.42
$710.00
602-02
Reinforcing Steel (Epoxy Coated)
500
LB
$1.94
$970.00
603-01
12" CMP
27
LF
$35.87
$968.49
603-02
12" CMP FES
2
EACH
$63.83
$127.66
603-03
24" CMP
30
LF
$52.21
$1,566.30
603-04
24" CMP FES
2
EACH
$157.32
$314.64
603-05
12" Class III RCP
30
LF
$30.58
$917.40
603-06
15" Class III RCP
30
LF
$33.08
$992.40
603-07
18" Class III RCP
30
LF
$36.86
$1,105.80.
603-08
21" Class III RCP
30
LF
$41.48
$1,244.40
603-09
24" Class III RCP
80
LF
$44.24
$3,539.20
603-10
27" Class III RCP
30
LF
$55.38,
$1,661.40
603-11
30" Class III RCP
30
LF
$62.66
$1,879.80
603-12
36" Class III RCP
30
LF
$82.85
$2,485.50
603-13
42"Class III RCP
30
LF
$100.49
$3,014.70
603-14
12 RCP Class III FES
2
EACH
$293.56
$587.12
603-15
15" RCP Class III FES
2
EACH
$343.49
$686.98
603-16
18" RCP Class III FES
2
EACH
$393.35
$786.70
603-17
21" RCP Class III FES
2
EACH
$440.97
$881.94
603-18
24" RCP Class III FES
2
EACH
$485.01
$970.02
603-19
27" RCP Class III FES
2
EACH
$538.38
$1,076.76
603-20
30" RCP Class III FES
2
EACH
$599.88
$1,199.76
603-21
36" RCP Class III FES
2
EACH
$1,059.40
$2,118.80
603-22
42" RCP Class III FES
2
EACH
$1,240.56
$2,481.12
603-23
24"x 38" RCP
30
LF
$84.97
$2,549.10
603-24
24"x 38" RCP- FES
2
EACH
$644.01
$1,288.02
603-25
14" x23" RCP
30
LF
$53.92
$1,617.60
603-26
14"x 23" RCP FES
2
EACH
$353.94
$707.88
603-27
24" Trash Rack
2
EACH
$326.05•
$652.10
603-28
15" ADS N-12
30
LF
$34.77•
$1,043.10
603-29
15" ADS FES
2
EACH
$179.87,
$359.74
603-30
18" ADS Pipe N-12
30
LF
$38.06
$1,141.80
603-31
18" ADS FES
2
EACH
$179.54"
$359.08
603-32
24" ADS PipeN-12
30
LF
$51.80
$1,554.00
603-34
36" ADS Pipe N-12
30
LF
$81.84
$2,455.20
603-35
36" ADS FES
2
EACH
$616.17
$1,232.34
603-36
4" PVC Irrigation Pipe( SCH-200)
30
LF
$23.22
$696.60
603-37
4" Sanitary Sewer Service (SDR-35)
30
LF
$29.00
$870.00
603-38
6" Pvc Sanitary Sewer
30
LF
$25.83
$774.90
603-39
8" Pvc Sanitary Sewer (SDR-35)
30
LF
$27.25
$817.50
603-40
Concrete Encasement
20
LF
$130.52
$2,610.40
603-41
Concrete Cut Off Walls (ditch crossing)
2
EACH
$1,450.56
$2,901.12
603-42
Pipe Headwall
2
EACH
$1,736.89
$3,473.78
603-43
4" Median Underdrain Pipe Perforated
30
LF
$19.09
$572.70
603-44
4" Median Underdrain Pipe Solid
30
LF
$17.79
$533.70
603-45
4" Clean Out
2
EACH
$383.31
$766.62
604-01
Type 3 Single Inlet (6.00')
2
EACH
$2,195.04
$4,390.08
604-02
Type 3 Double Inlet (6.00')
2
EACH
$3,322.08
$6,644.16
604-03
5' Type R Inlet (6.00')
2
EACH
$3,012.81 `
$6,025.62
Rev 02/2010
604-04
10' Type R Inlet (6.00')
2
EACH
$4,064.81
$8,129.62
604-05
15' Type R Inlet (6.00')
2
EACH
$5,137.57
$10,275.14
604-06
Combination Type 13 Inlet (6.00')
2
EACH
$2,102.02
$4,204.04
604-07
COFC Single Inlet ( Area Inlet) (6.00')
2
EACH
$1,956.18
$3,912.36
604-08
4' Diameter Manhole
2
EACH
$1,572.98
$3,145.96
604-09
5' Diameter Manhole
2
EACH
$2,125.17
$4,250.34
604-10
5' Diameter Manhole Drop
2
EACH
$2,125.17
$4,250.34
604-11
6' Diameter Manhole
2
EACH
$3,322.05
$6,644.10
606-33
24" ADS FES
2
EACH
$232.04
$464.08
607-01
Temporary Fence - Corral Fence
50
LF
$17.39
$869.50
607-02
Temporary Fence - Corral Panel & Screen
50
LF
$23.18
$1,159.00
607-03
Privacy Fence 8' Cedar
100
LF
$18.50
$1,850.00
607-04
Privacy Fence 6' Cedar
100
LF
$15.02.
$1,502.00
607-05
2 Rail Split Fence
100
LF
$13.91.
$1,391.00
607-06
3 Railed Dowel Fence
100
LF
$16.18
$1,618.00
607-07
4 Strand Barbed Wire Fence
100
LF
$2.27.
$227.00
607-08
Orange Safety Fence
100
LF
$2.04
$204.00
608-01
Concrete Sidewalk (4")
500
SF
$3.21.
$1,605.00
608-02
Concrete Sidewalk (6")
935
SF
$3.62
$3,384.70
Concrete Access Ramps with Approved Truncated Domes
608-03
(6")
36
SF
$62.66
$2,255.76
608-04
Concrete Drive Approach (8")
250
SF
$4.94
$1,235.00
608-05
Drive Over Curb and Sidewalk (6")
200
SF
$4.01
$802.00
608-06
Concrete Crosspan and Apron (10")
390
SF
$5.92
$2,308.80
608-07
Concrete Trickle Pan ( 4' wide x 8" thick)
760
SF
$6.26 -
$4,757.60
Colored Concrete Bike Path (5" Fibermesh) (Yosemite
608-08
Brown)
1000
SF
$3.77
$3,770.00
608-09
Bus Stop Pad (8")
500
SF
$4.88
$2,440.00
608-10
Pedestrian Refuge Island (6")
100
SF
$4.64.
$464.00
608-11
High Early Concrete (24hr)
25
CY
$137.48
$3,437.00
608-12
Flowable Fill Concrete
50
CY
$96.74
$4,837.00
609-01
Remove and Replace Concrete Curb and Gutter
100
LF
$20.31
$2,031.00
609-02
Vertical Curb and Gutter (30")
66
LF
$15.08 ,
$995.28
609-03
Outfall Curb and Gutter (18")
50
LF
$12.76 '
$638.00
609-04
Rollover Curb and Gutter
50
LF
$17.40,
$870.00
609-05
Driveway Curb Cut
4
EACH
$580.16,
$2,320.64
609-06
Asphalt Curb
150
LF
$3.35 ,
$502.50
610-01
Exposed Aggregate Concrete for Hardscape Medians (4")
250
SF
$7.25
$1,812.50
610-02
Colored Patterned Concrete (Stamped) (6")
250
SF
$9.13 '
$2,282.50
610-03
Interlocking Sidewalk Pavers -Type 1
250
SF
$15.90-
$3,975.00
619-01
6" D.I.P. Class 52 w/ Poly -Wrap
30
LF
$44.81_
$1,344.30
619-02
6"x6" Tee
1
EACH
$205.44
$205.44
619-03
6"x6" Cross
1
EACH
$270.58-
$270.58
619-04
6" 45 Degree Bend
1
EACH
$139.53
$139.53
619-05
6" Gate Valve And Box
1
EACH
$863.27
$863.27
619-06
6" Mega Lugs Restraints
2
EACH
$26.68
$53.36
619-07
6"x2" Blow Off
1
EACH
$845.27'
$845.27
619-08
8" D.I.P. Class 52 w/ Ploy -Wrap
30
LF
$52.24
$1,567.20
619-09
8"x6" Tee
1
EACH
$240.56
$240.56
619-10
8"x8" Cross
1
EACH
$270.69
$270.69
619-11
8" 45 Degree Bend
1
EACH
$172.14`
$172.14
619-12
8"x2" Blow Off
1
EACH
$889.45
$889.45
619-13
8" PVC C-900
30
LF
$32.93
$987.90
Rev
02/2010
619-14
8" Gate Valve And Box
1
EACH
$1,238.05
$1,238.05
619-15
8" Mega Lugs Restraints
2
EACH
$40.62
$81.24
619-16
Fire Hydrant
1
EACH
$2,734.12
$2,734.12
619-17
6" Fire Hydrant Extension
1
EACH
$435.12 '
$435.12
619-18
12" Fire Hydrant Extension
1
EACH
.$512.86 '
$512.86
619-19
3/4" Copper Pipe
30
LF
$6.09 `
$182.70
619-20
3/4" Corp Stop
1
EACH
$228.44
$228.44
619-21
3/4" Curb Stop
1
EACH
$143.90
$143.90
619-22
3/4" Meter Pit with 3/4" Yoke
1
EACH
$823.99
$823.99
619-23
1" Copper Pipe
30
LF
$7.27
$218.10
619-24
1" Corp Stop
1
EACH
$243.53
$243.53
619-25
1" Curb Stop
1
EACH
$172.91
$172.91
619-26
1" Meter Pit with 3/4" Yoke
1
EACH
$878.53
$878.53
619-27
1" Air Vac Assembly
1
EACH
$4,442.41
$4,442.41
619-28
8" Gate Valve (open left) w/ Valve Box
1
EACH
$1,238.05
$1,238.05
619-29
8" Gate Valve (open right) w/ Valve Box
1
EACH
$1,238.05
$1,238.05
619-30
16"x16"x8" Tapping Saddle w/ T.B.
1
EACH
$2,285.70
$2,285.70
619-31
8" Tapping Gate Valve w/ Valve Box
1
EACH
$1,238.05
$1,238.05
619-32
Join to Existing 8" Water Line
1
EACH
$1,362.29
$1,362.29
619-33
Join to Existing 12" Water Line
1
EACH
$1,666.99-
$1,666.99
619-34
Join to Existing 16" Water Line
1
EACH
$1,970.46
$1,970.46
619-35
Join to Existing 24" Water Line
1
EACH
$3,321.81 .
$3,321.81
626-01
Mobilization (See Spec)
1
EACH
$0.00
$0.00
630-01
Traffic Control Supervisor
1
DY
$406.11
$406.11
630-02
Flagging
8
HR
$19.70
$157.60
900-01
4" CL-200 PVC Main (4.5 cover)
100
LF
$3.45,
$345.00
900-02
6" CL-200 PVC Main (4.5 cover)
100
LF
$5.25
$525.00
900-03
Cap Irrigation Line
2
EACH
$19.46.
$38.92
900-04
Sprinkler Line Install ( Trenching and Backfill)
100
LF
$2.92
$292.00
900-05
Mainline PVC Class 200 ( 3" Welded)
100
LF
$1.37 .
$137.00
900-06
Laterals PVC 200 ( 2"-11 /2"-1 ")
100
LF
$0.66.
$66.00
900-07
Remote Control Zone Valves
2
EACH
$16.32
$32.64
900-08
Isolation Gate Valves 2" Square Nut
2
EACH
$195.46
$390.92
900-09
Valve Boxes
2
EACH
$29.03 _
$58.06
900-10
Control System 18 Station
1
EACH
$389.44
$389.44
Electric Control Wiring ( 5 Wires #14 Feed and #12
900-11
Common)
100
LF
$0.33
$33.00
900-12
Gear Driven Rotor Heads ( Rainbird)
2
EACH
$36.35
$72.70
$318,369.96
The term will be extended for one (1) additional year, August 1, 2010 through July 31, 2011.
If the renewal is acceptable to your firm, please sign this letter in the space provided include a
current copy of insurance naming the City as an additional insured and return all
documents to the City of Fort Collins, Purchasing Division, P. O. Box 580, Fort Collins, CO
80522, within the next fifteen days.
Rev 0212010
If this extension is not agreeable with your firm, we ask that you send us a written notice stating
that you do not wish to renew the contract and state the reason for non -renewal.
Please contact John D. Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 if you
have any questions regarding this matter.
Sincerely,
C
CJs B. O'Neill WII, CPPO, F N I G P
or of Purchasing and Risk Management
Signature Date
(Please indicate your desire to renew 7044 by signing this letter and returning it to Purchasing
Division within the next fifteen days.)
JBO:kt
Rev 02/2010