HomeMy WebLinkAboutRESPONSE - BID - 7152 PRESSURE WASHING FOR DOWNTOWN AND OLD TOWN SQUARECITY OF FORT COLLINS
INVITATION TO BID
7152 Pressure Washing for Downtown and Old Town Square
The City of Fort Collins Parks Division is requesting bids for pressure washing of various areas
including downtown sidewalks, Old Town, and downtown corners. This bid may be used by other
departments as needed.
Contractor must start work within 5 days after completion of Service Agreement.
Awarded contractor must enter into the attached service agreement (for your review) and provide
the required insurance (Exhibit B). This agreement is effective for one year from the date on the
service agreement. At the option of the City, the Agreement may be extended for additional one
year periods not to exceed four (4) additional one year periods. Pricing changes shall be
negotiated by and agreed to by both parties and may not exceed the Denver - Boulder CPI-U as
published by the Colorado State Planning and Budget Office. Written notice of renewal shall be
provided to the Service Provider and mailed no later than ninety (90) days prior to contract end.
Bid Schedule
Contractor to furnish all labor, materials, equipment, supervision and incidentals necessary to
complete the work per attached specifications. City reserves the right to award individually or
by grand total.
Downtown corners 19 , 53 70
Downtown sidewalks $ S�
Old Town Square Proper $ 3L] ,
Grand Total $ /y O ,�33n
Cost per square foot $n.c2o —
Includes all labor, materials, equipment and mobilization in Fort Collins City limits.
Tol�Gun
PI-B55UI"@
Waste __—
Name / Address
City of Fort Collins, Parks Division
413 S. Bryan Ave.
Fort Collins, CO 80524
Attn: Steve Lukowski
500 West 67th Street
Loveland, CO 80538
Phone 970-203-1110 or
800-234-5685
Fax 970-203-9911
Email
JSTEPHEN@fcgov.com
Description
Phone #
(970)221-6777
Cleaning of Downtown Corner Pavers:
Olive: Monthly Cleaning of Corner Walkways $220.00; Weekly Cleaning of Walkways $170.00 Annual
contract amount...
Oak St: Weekly Cleaning of Corner Walkways $150.00. Annual Contract Amount...
Oak Bus Stop: Monthly cleaning of Pavers $110. Annual Contract Amount
Mountain: Weekly Cleaning of Corner Walkways $280.00. Annual Contract Amount...
Laporte: Monthly Cleaning of Corner. Walkways $220.00. Annual Contract Amount...
Any additional cleaning will be billed at $80.00 per hour/man/machine and cleaner to be billed at $12.00 to
$30.00 per gallon.
Environmental Waste Disposal Fee per occurrence $30.00
NOTE: This proposal can change if not accepted within 30 days. All work will be completed in a substanial
workman -like manner according to specifications submitted, per standard practices. Any alterations or
deviations involving extra cost will be executed only upon written orders, and will incur an extra charge over
and above the estimate. All agreements are contingent upon strikes, accidents, acts of God or delays beyond our
control.
ACCEPTANCE OF ESTIMATE: The above prices, specifications and conditions are satisfactory and are hereby
accepted. Top Gun is authorized to do the work as specified. Payment will be made within 30 days of
completion of work, afterwhich I agree to pay 1-1/2% per month finance charge until paid in full, and I agree to
pay all collection costs - including court costs and legal fees.
AUTHORIZED CUSTOMER SIGNATURE / DATE
ESTIMATE
Date Estimate #
7/19/2010 11033
Fax #
Total
2,970.00
4,800.00
880.00
8,960.00
1,760.00
Raise Your
Expectations!!!!
NOTE: Top Gun is
not liable for any
paint removed from
concrete due to
cleaning or for
damage to vehicles
left in a parking
Tap -Gun
Pressure
Was/iir�g
Name / Address
City of Fort Collins, Parks Division
413 S. Bryan Ave.
Fort Collins, CO 80524
Attn: Steve Lukowski
Downtown Sidewalks
500 West 67th Street
Loveland, CO 80538
Phone 970-203-1110 or
800-234-5685
Fax 970-203-9911
Email
JSTEPHEN@fcgov:com
Phone #
970-221-6667
ESTIMATE
Date Estimate #
7/19/2010 11035
Fax #
Description I Total
Monthly Pressure Washing of Walkways per Diagram provided, numbers 1-8, with all waste water going to
sanitation sewer drains or landscape located within the area $4860.00. Annual Contract Amount for a total of
six cleanings (April through September)...
Monthly Pressure Washing of Walkways on both sides of Linden St, #9 per diagram provided, with all waste
water going to sanitation sewer drains or landscape on site $730.00. Annual Contract Amount for a total of
eight cleanings from March through October...
Any additional cleaning will be billed at $80.00 per hour/man/machine and cleaner to be billed at $12.00 to
$30.00 per gallon.
Environmental Waste Disposal Fee per occurrence $30.00
� �� (� (�o 5 A-t-, "
NOTE: This proposal can change if not accepted within 30 days. All work will be completed in a substanial
workman -like manner according to specifications submitted, per standard practices. Any alterations or
deviations involving extra cost will be executed only upon written orders, and will incur an extra charge over
and above the estimate. All agreements are contingent upon strikes, accidents, acts of God or delays beyond our
control.
ACCEPTANCE OF ESTIMATE: The above prices, specifications and conditions are satisfactory and are hereby
accepted. Top Gun is authorized to do the work as specified. Payment will be made within 30 days of
completion of work, afterwhich I agree to pay 1-1/2% per month finance charge until paid in full, and I agree to
pay all collection costs - including court costs and legal fees.
AUTHORIZED CUSTOMER SIGNATURE / DATE
_"J/c
I C/
29,160.00
5,840.00
Raise Your
Expectations! ! ! !
NOTE: Top Gun is
not liable for any
paint removed from
concrete due to
cleaning or for
damage to vehicles
left in a parking
ir
GUss:IftI
Name / Address
City of Fort Collins, Parks Division
413 S. Bryan Ave.
Fort Collins, CO 80524
Attn: Steve Lukowski
Old Town Square Proper
500 West 67th Street
Loveland, CO 80538
Phone 970-203-1110 or
800-234-5685
Fax 970-203-9911
Email I Phone #
JSTEPHEN@fcgov.com 1 970-221-6667
ESTIMATE
Date Estimate #
7/19/2010 11034
Fax #
Description I Total
Monthly Pressure Washing of Walkways per #15 on Diagram provided with all waste water going to sanitation
sewer drains located along the square $3200.00. Annual Contract Amount for a total of eight cleanings...
Any additional cleaning will be billed at $80.00 per hour/man/machine and cleaner to be billed at $12.00 to
$30.00 per gallon.
Environmental Waste Disposal Fee per occurrence $30.00
-'Z7tl1 U °—
NOTE: This proposal can change if not accepted within 30 days. All work will be completed in a substanial
workman -like manner according to specifications submitted, per standard practices. Any alterations or
deviations involving extra cost will be executed only upon written orders, and will incur an extra charge over
and above the estimate. All agreements are contingent upon strikes, accidents, acts of God or delays beyond our
control.
ACCEPTANCE OF ESTIMATE: The above prices, specifications and conditions are satisfactory and are hereby
accepted. Top Gun is authorized to do the work as specified. Payment will be made within 30 days of
completion of work, afterwhich I agree to pay 1-1/2% per month finance charge until paid in full, and I agree to
pay all collection costs - including court costs and legal fees.
AUTHORIZED CUSTOMER SIGNATURE / DATE
25,600.00
Raise Your
Expectations!!!!
NOTE: Top Gun is
not liable for any
paint removed from
concrete due to
cleaning or for
damage to vehicles
left in a parking
REQUIREMENTS AND SPECIFICATIONS
Requirements
1. Contractors responding to this bid must be qualified to do the work and have minimum of 3
years experience pressure washing similar work. Contractor must provide a list of three or
more referrals with the bid
2. The equipment used must be capable of producing the desired cleaning results,and a
complete equipment list must be provided with the bid.
3. The contractor will provide the City with a list of cleaning agents and the Material Safety
Data Sheet on each product. No solvents will be used only soap or a ph acceptable caustic.
4. The City must receive a copy of any agreement made with a waste disposal facility.
5. The areas must remain open for use as much as possible without presenting a hazard to the
public. Coordination of the cleaning will be discussed and a schedule agreed upon
between the Parks Division project coordinator and the contractor. Pressure washing of
each area must be completed by 8:00 AM.
6. All wash water must be collected and treated as wastewater and disposed of in an
appropriate manner. It will be the responsibility of the contractor to insure this process is
adhered to.
In the City of Fort Collins, powerwashing wastewater must be kept out of the City's storm water
system. The system includes streets, gutters, ponds, creeks, ditches, and the Poudre River.
Powerwashing wastewater must be collected and then disposed of appropriately.
♦ Appropriate disposal of the wastewater:
As long as the collected wastewater does not have an oil sheen, and does not contain any
hazardous or toxic substances, the wastewater may be disposed of into the City's
wastewater treatment system. If you add anything to the washwater (ie—a cleaning agent)
or if you have questions about the content of your powerwashing wastewater, please
contact the industrial pretreatment office at 221-6938.
Disposal into the City's wastewater treatment system may be done either by discharging
directly to an inside drain, or by pump truck at the Drake wastewater treatment facility. A
waste hauler's permit is required, and a fee will be charged, for disposal by pump truck at
the Drake facility. For fee information, or to obtain a permit, contact the industrial
pretreatment office at 221-6938.
♦ A sewer manhole cover may not be removed for disposal to the wastewater system.
SA rev03/10
♦ Why the change in the treatment of this wastewater? New policy and guidance from the
State of Colorado have changed disposal options for powerwashing wastewater. A copy
of the State's guidance can be found at:
http://www.cdphe.state.co.us/wq/PermitsUnit/PolicyandGuidance/guidanceandpolicy.htmi
♦ For Storm Water treatment questions during the bid, please contact John Stephen at 970 -
221-6777. Any questions after award, please contact Lois Rellergert at 416-2059.
Specification
The objective of this cleaning effort must be to remove all dirt, debris, black marks, grease, oil, food
stains, gum, etc. from the sidewalk surfaces. The work must result in a clean and attractive
sidewalk. Detailing is defined, as the usage of environmentally safe chemicals when and where
needed and must be approved by the City representative. Cleaning is defined as the usage of high-
pressure water, hot or cold.
All efforts must be made to avoid splashing walls, windows, furniture, flowers and other items when
cleaning. Contractor must perform any follow up cleaning when splashing does occur within 24
hours or as directed by the City Representative.
Scope of Work:
A. Downtown sidewalks. The following are locations to be cleaned:
Location #
1. College Avenue from Olive (north corners) to LaPorte (south corners). East and West
sides.
2. Olive Street (north side only). East from College Avenue to first alley. (north side only)
West from College to first alley.
3. Oak Street from Remington Street Parking lot (West side of parking lot) to Mason. North
and South sides. (not to include Oak Street Plaza Park unless requested)
4. Mountain Avenue North side from College West to Mason.
5. Mountain Avenue South side from Remington to Mason.
6. LaPorte Avenue South side from College Avenue West to first alley.
7. LaPorte Avenue North side from College Avenue to first alley.
8. Walnut Street North side from Mountain Avenue to College Avenue.
9. Linden Street both side's from Walnut Street to Riverside.
B. Corners Only
10. Two North corners on Olive and College:
11. Two East corners on Oak and College:
12. Bus stop area on the West side of College and Oak (not to include Oak Street Plaza
Park).
13. Four corners on Mountain and College:
14. Two South corners of LaPorte and College:
SA rev03/10
C. Old Town Square Common Area
15. Between 100 East Mountain and Walnut Street as well as Trimble Court, Two walk ways
that run either side of Cooper Smith South towards Mountain and North and towards
Walnut. Eight cleaning to be coordinated with Parks Crew Chief in the month prior to
each cleaning. Must be completed within two working days.
See attached map with highlighted areas to be cleaned.
Schedule and Frequencies for each location. Corners on College between Olive and LaPorte
will be on a separate schedule.
Locations
#1 - #8: Six cleanings — April, May, June, July, August, and September. To be cleaned within the
last ten days of each scheduled month and completed within five working days of a calendar week.
#9 Cleaned monthly in the months of March through October. Eight cleanings
Linden Street to be cleaned monthly in the months of March through October. Eight cleanings.
#10 Cleaned monthly in the months of March -May and September -October. Cleaned weekly
beginning Mid -June through August. Sixteen cleanings.
#11'Cleaned weekly Mid -March through Mid -October. Thirty two cleanings
#1'2 Cleaned monthly March through October. Eight cleanings.
#13 Cleaned weekly Mid -March through Mid -October. Thirty two cleanings.
#14 Cleaned monthly in the months of March through October.
#15: Eight cleanings — March through October. To be cleaned monthly on a flexible scheduled to
be determined by the Parks Division prior to each month. Must be completed in one working day..
Note: Please coordinate the cleanings of these locations 9 and 15 to be cleaned on the same day
when possible.
4
SA rev03/10
Downtown Power Wash Areas
Tl � � � t 1 1 „'�` � ."7i � Tr t F � {` :.� N •' � _ J � L � �� �, �d,�'2. 4 U �' �5'�
#'�' � . �,.. � , ;, y7./� 0^� 'I f -'a'T�`�� t'. � � - y'�„�, .. >. �'}K'`f y,�3t•� �b � y:... �� j. �a
r;tir�, 1
x
41
Auir
i � Jt w `•� � A
{ F*,
a
�7ILI,_,�j
Pd
�( �'i Q. e a rt�ab e6 ♦ r __ � Y } Q 'a. ¢ r' T3'+#it
71
Ce
�, P i f c4 �, ,' {{jj A LL ASS ...'-+^ "" �. • "(y a.
lF,yy:y`Y.{y r:+.}�
.'1
� +S �Y„� K' S ' •: ?yam^.,.. 7 �..� 1 M r. b 1 � I %HAY^ �a��
VA. }... � rf P L � f' � Ir
}iti-`
jr
ryr
g;
Ilrs t �
;'.s�r�t aer•.':tm ,e .:7;'T:r,
N
1 inch equals 217.9 feet
SA rev03/10