Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 7084 CONSULTING ENGINEERING SERVICESPROFESSIONAL SERVICE AGREEMENT WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND Anderson Consulting Engineers, Inc. DATED: February 2, 2010 Work Order Number: ACE-CIPO-,4I Purchase Order Number: � to y /.:23 Project Title: Canal Importation Ponds and Outfall Project — Additional Construction Services Commencement Date: August 3, 2010 Completion Date: March 31, 2011 Maximum Fee: (time and reimbursable direct costs): Not to exceed Fifteen Thousand Four Hundred Sixteen Dollars ($15,416) Project Description: As -built revisions and as -needed construction services. Scope of Services: See Attached Scope of Work Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein an in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. City of Fort Collins Submitted By: Project Manager Date: Reviewed By: — All" Owen andall, Senior tilit Engineer The attached forms consisting of eight (3) pages are Date:v hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Approved By: 60qqA1S� Jon Haukaas, Professional: ►V17E�50�% utii�l �o,?���jr��/,�c. Water Engineering and Field Services Operations Manager By: � Tie: Date: OA O Date: 91.3 1 to Approved By: stdwopsa rev 7/09 Brian Janonis, Utilities General Manager (over $1,000,000) Approved By: James B. O'Neill II, CPPO, FNIGP Director of Purchasing and Risk Management (over $60,000.00) Date: SCOPE OF WORK August 2, 2010 EXHIBIT A ANDERSON CONSULTING ENGINEERS, INC. SCOPE OF WORK for the CANAL IMPORTATION PONDS AND OUTFALL (CIPO) PROJECT ADDITIONAL CONSTRUCTION SERVICES Page 1 of 2 This scope of work identifies additional services to be provided by Anderson Consulting Engineers, Inc. (ACE) for the revision and production of as -built construction drawings, for the regulation and management of the underdrain system, and for construction services/site inspections on the remaining ponds portion of the CIPO project, which is anticipated to be completed in 2010. Services will be provided by ACE, as the prime consultant, with supplemental services provided by BHA Design Inc. (landscape planning/construction) and AVI, p.c. (structural engineering). Bradley Anderson, P.E., CFM, President of ACE/Principal Engineer, will serve as the Project Manager for this work. Brian Smith, P.E., and Scott Parker, P.E., will serve as the project engineers for the remainder of the project and will attend coordination meetings and conduct site inspections. ADDITIONAL CONSTRUCTION SERVICES COSTS Task 1. As -built Construction Drawings Revisions and Mylar Production , A draft version of the as -built CIPO construction drawings has already been compiled by ACE and submitted to City of Fort Collins (COFC) staff for review. Comments generated from the COFC review will be discussed during a review meeting and incorporated into the final set of as -built construction drawings. It is assumed that a total of four (4) full-sized (24" x 36") paper, one (1) full-sized mylar, and eight (8) half -sized (11" x 17") paper final as -built construction sets will be provided to the City of Fort Collins Utilities for their use and distribution to other City Departments and Garney Construction. In addition, this task includes time for AVI to review and stamp the as -built construction drawings pertinent to the structural aspects of the design. Task 2. ,Construction/Resident Engineering Services and Site Inspections The effort for this task involves providing engineering and construction services for the remainder of the ponds portion of the CIPO project, which is anticipated to be completed in 2010. This task includes time for a representative of ACE to attend coordination meetings at the site and conduct site inspections. In addition, this task includes time for a representative of BHA to attend coordination meetings at the site and conduct site inspections as necessary. Time allotted for this task assumes approximately 10 hours per month for ACE staff through the end of 2010. SCOPE OF WORK Page 2 of 2 August 2, 2010 Task 3. Underdrain System Regulation and Management The effort for this task involves providing support for the regulation and management of the CIPO underdrain system for the remainder of 2010. Included in this time is effort for Scott Parker to address issues associated with the underdrain system and possible impacts of that system to the private wells of adjacent landowners. In addition, this task includes time for Brad Anderson and Scott Parker to attend coordination meetings and conduct site visits on an as -needed basis. -a c�a u z F u E- t/2 z u Q P Q T .:. O N i ems- ! m 1p] 7 dl U s d m O CD, I f C, k cc O O s• F- I � O i tolu 01 w m i rz fop W ' . U "i• m ` co V �a,14 va 2 to! ,^ E (f) E � I "U C O : aa� N V f co w a` { sr: C N C. O I i 1 9 U n y •O C a) a a a c m 0 A, to U o a Q I a m m '> w Qm J' �.. = m m 1O O t ti m c c a c;' to 3 a m a Q cm Q o p W CD C CO CDC k,LLO OQ� = E c: W 00Ci uj , a Q m o c ma u ❑; CL a d a oW: u,wti ri . _> opt¢ 4U Q40 x 0